2012 -- H 7532 SUBSTITUTE A | |
======= | |
LC01388/SUB A | |
======= | |
STATE OF RHODE ISLAND | |
| |
IN GENERAL ASSEMBLY | |
| |
JANUARY SESSION, A.D. 2012 | |
| |
____________ | |
| |
A N A C T | |
RELATING TO PUBLIC UTILITIES AND CARRIERS - DUTIES OF UTILITIES AND | |
CARRIERS | |
|
      |
|
      |
     Introduced By: Representatives Tarro, and Dickinson | |
     Date Introduced: February 15, 2012 | |
     Referred To: House Corporations | |
It is enacted by the General Assembly as follows: | |
1-1 |
     SECTION 1. Chapter 39-2 of the General Laws entitled "Duties of Utilities and Carriers" |
1-2 |
is hereby amended by adding thereto the following section: |
1-3 |
     39-2-25. Contact voltage, detection, repair and reporting. -- (a) As used in this section |
1-4 |
     “contact voltage” means and/or refers to a voltage resulting from abnormal power system |
1-5 |
conditions that may be present between two (2) conductive surfaces that can be simultaneously |
1-6 |
contacted by members of the general public and/or their animals. Contact voltage is caused by |
1-7 |
power system fault current as it flows through the impedance of available fault current pathways. |
1-8 |
Faults contributing to contact voltage may be due to electric system deterioration or damage, or |
1-9 |
improper installation. Contact voltage is of greatest concern in areas where underground electric |
1-10 |
distribution systems exist, as faults on those systems may remain active for long periods of time |
1-11 |
before detection and repair, and therefore contact voltage is a potential shock hazard. |
1-12 |
      (b) Notwithstanding any general or public law, rule, regulation or order to the contrary, |
1-13 |
the Rhode Island public utilities commission and the Rhode Island division of utilities and |
1-14 |
carriers shall initiate a proceeding within forty-five (45) days of the effective date of this section, |
1-15 |
to establish, after notice and provision of the opportunity for comment and public hearing, a |
1-16 |
contact voltage detection and repair program. The program shall require electric distribution |
1-17 |
companies to implement appropriate procedures to detect contact voltage on publicly accessible |
1-18 |
surfaces which could become energized by contact voltage due to faults in the underground |
1-19 |
distribution system. The program shall also recognize the potential for publicly accessible objects |
2-1 |
such as sidewalks, roadways, fences, storm drains, or other metallic gratings to become energized |
2-2 |
by faults to the underground distribution system. The program shall require every electric |
2-3 |
distribution company to adhere to appropriate procedures established by the commission to: |
2-4 |
     (1) Designate contact voltage risk areas. The boundaries of such areas shall be approved |
2-5 |
by the commission and shall be based on the presence of underground electric distribution and |
2-6 |
situated in pedestrian-dense areas such as urban neighborhoods, commercial areas, central |
2-7 |
business districts, tourist heavy locations, and other places where pedestrians could be exposed to |
2-8 |
contact voltage; |
2-9 |
      (2) By June 30, 2013, conduct an initial survey of no less than forty percent (40%) of |
2-10 |
designated contact voltage risk areas, for contact voltage hazards on all conductive surfaces in |
2-11 |
public rights-of-way using equipment and technology as determined by the commission; |
2-12 |
      (3) Beginning July 1, 2013, annually survey no less than twenty percent (20%) of |
2-13 |
designated contact voltage risk areas, for contact voltage hazards on all conductive surfaces in |
2-14 |
public rights-of-way using equipment and technology as determined by the commission; |
2-15 |
      (4) Repair power system faults of the electric distribution company’s underground |
2-16 |
distribution system, that result in contact voltage appearing on publicly accessible surfaces of a |
2-17 |
level to be determined by the division of public utilities; |
2-18 |
     (5) If during a survey for contact voltage hazards on conductive surfaces in public rights- |
2-19 |
of-way, an energized surface is identified and the proximate cause is found not to be a utility |
2-20 |
company asset, then the utility company has no legal duty; however, the company may: clearly |
2-21 |
designate the area as a contact voltage hazard, and/or notify the account owner or owner of the |
2-22 |
asset causing the contact voltage hazard, and inform the owner of his/her obligation to perform all |
2-23 |
necessary repairs consistent with the terms contained in this section; |
2-24 |
     (6) Annually report on contact voltage findings, including, but not limited to, the number |
2-25 |
     and type of energized objects on both company-owned and customer-owned assets, voltage level, |
2-26 |
corrective action taken, shocks that occur to members of the public or to pets owned by members |
2-27 |
of the public, and any other information that the commission deems appropriate. |
2-28 |
      (c) The commission shall require, as part of the program established pursuant to |
2-29 |
subsection 39-2-25(b), that electric distribution companies maintain records of the testing and |
2-30 |
subsequent maintenance or repairs performed by such electric distribution companies, and submit |
2-31 |
copies of such records to the commission, which shall make the records available for public |
2-32 |
inspection. The costs of this program shall be fully recovered by the utility company annually |
2-33 |
through a fully reconciling funding mechanism to be submitted annually to the commission for |
2-34 |
review and approval. |
3-1 |
     (d) The commission shall review and determine which equipment and technology shall be |
3-2 |
used for the surveying of contact voltage consistent with paragraphs (2) and (3) of subsection (b). |
3-3 |
Such a review may include, but not be limited to, the use of mobile testing technology. |
3-4 |
      (e) Any electric distribution company that fails to comply with the requirements of the |
3-5 |
program established pursuant to subsection 39-2-25(b) shall be subject to a penalty to be |
3-6 |
determined by the commission and in compliance with Title 39. |
3-7 |
     (f) As used in this section, "electric distribution company" means a company as defined |
3-8 |
in subsection 39-1-2(12), but not including the Block Island Power Company or the Pascoag |
3-9 |
Utility District. |
3-10 |
     (g) The commission shall, within one hundred twenty (120) days of the effective date of |
3-11 |
this section, conclude the proceeding initiated pursuant to subsection 39-2-25(b). Within these |
3-12 |
one hundred twenty (120) days, the commission shall also issue an order establishing the contact |
3-13 |
voltage detection and repair program. Within one year after the issuance of the order establishing |
3-14 |
the program, and during each subsequent one year period following the date of issuance of that |
3-15 |
order, the commission shall provide the legislature with a report on the effectiveness of the |
3-16 |
program, and any recommendations for any changes thereto, including whether to require the |
3-17 |
Block Island Power Company or the Pascoag Utility District to develop and participate in a |
3-18 |
contact voltage detection and repair program. |
3-19 |
     SECTION 2. This act shall take effect upon passage. |
      | |
======= | |
LC01388/SUB A | |
======== | |
EXPLANATION | |
BY THE LEGISLATIVE COUNCIL | |
OF | |
A N A C T | |
RELATING TO PUBLIC UTILITIES AND CARRIERS - DUTIES OF UTILITIES AND | |
CARRIERS | |
*** | |
4-1 |
     This act would require that the public utilities commission and the Rhode Island division |
4-2 |
of utilities and carriers establish a program to require electric utilities to conduct voltage detection |
4-3 |
surveys and complete timely repairs of faults contributing to contact voltage. |
4-4 |
     This act would take effect upon passage. |
      | |
======= | |
LC01388/SUB A | |
======= |