2012 -- H 7696 | |
======= | |
LC01631 | |
======= | |
STATE OF RHODE ISLAND | |
| |
IN GENERAL ASSEMBLY | |
| |
JANUARY SESSION, A.D. 2012 | |
| |
____________ | |
| |
A N A C T | |
RELATING TO TOWNS AND CITIES -- SMALL WIND ENERGY SYSTEMS | |
|
      |
|
      |
     Introduced By: Representative John M. Carnevale | |
     Date Introduced: February 16, 2012 | |
     Referred To: House Environment and Natural Resources | |
It is enacted by the General Assembly as follows: | |
1-1 |
     SECTION 1. Title 45 of the General Laws entitled "TOWNS AND CITIES" is hereby |
1-2 |
amended by adding thereto the following chapter: |
1-3 |
     CHAPTER 24.6 |
1-4 |
SMALL WIND ENERGY SYSTEMS |
1-5 |
     45-24.6-1. Definitions. – The following terms, as used in this chapter, shall have the |
1-6 |
following meanings: |
1-7 |
     (1) "Small wind energy system" means a wind energy conversion system consisting of a |
1-8 |
wind turbine, pole/tower and/or roof mounting bracket, and associated control or conversion |
1-9 |
electronics which has a rated capacity of not more than ten kilowatts (10 kwh) and which is |
1-10 |
intended to reduce on-site consumption of utility power. |
1-11 |
     (2) "Pole/tower height" means the height of the pole/tower measured from the natural |
1-12 |
grade of the land to the top of the pole/tower excluding the wind turbine. |
1-13 |
     (3) "Blade ground clearance" means the distance measured at the lowest point of any arc |
1-14 |
of a blade tip to the natural grade of the land. |
1-15 |
     (4) "Roof mounted system" means a system mounted to a roof with a tripod bracket |
1-16 |
system that has a rated capacity between one-half kilowatts (1/2 kwh) and two kilowatts (2 kwh). |
1-17 |
     45-24.6-2. Small wind energy systems permitted. – The installation of small wind |
1-18 |
energy systems in this state shall be permitted subject to the zoning regulations set forth in section |
1-19 |
45-24.6-3. |
2-20 |
     45-24.6-3. Contents of zoning ordinances. – All municipal zoning ordinances shall |
2-21 |
include, at a minimum, the following provisions regulating the installation of small wind energy |
2-22 |
systems. |
2-23 |
     (1) Minimum ground clearance for pole/tower systems shall be no less than twenty feet |
2-24 |
(20'); |
2-25 |
     (2) The allowable pole/tower height shall be determined by the lot size as follows: |
2-26 |
     (i) On any lot that is less than ten thousand square feet (10,000 sq ft), the height shall be |
2-27 |
subject to the approval of the local zoning board following hearing; |
2-28 |
     (ii) On any lot that is between ten thousand square feet (10,000 sq ft) and forty thousand |
2-29 |
square feet (40,000 sq ft) the height shall be a maximum of eighty feet (80'); |
2-30 |
     (iii) On any lot that is greater than forty thousand square feet (40,000 sq ft) the height |
2-31 |
may exceed eighty feet (80'), subject to any applicable federal air space regulations. |
2-32 |
     (3) Set backs shall be as follows: |
2-33 |
     (i) For pole/tower systems the minimum set backs shall be no less than one and one-half |
2-34 |
(1.5) times the diameter of the turbine blades and the guy wires set back a minimum of ten feet |
2-35 |
(10') from the property lines. |
2-36 |
     (4) Design standards shall require that the pole/tower to be a neutral, non-reflective color |
2-37 |
so as to blend into the surrounding environment. Visible flags, reflectors or reflective tape shall |
2-38 |
be placed on the anchor points of guy wires and along the guy wire up to a height of ten feet (10'). |
2-39 |
     (5) Signage shall be limited to that which is necessary to identify the manufacturer, |
2-40 |
owner, twenty-four (24) hour contact phone number and any necessary safety warnings. |
2-41 |
     (6) Safety standards that require all wind turbines to be equipped with an automatic |
2-42 |
braking, governing or feathering system to prevent uncontrolled rotation, over speeding and |
2-43 |
excessive pressure on the pole/tower. |
2-44 |
     45-24.6-4. Permits and fees. – Prior to the installation of any small wind energy system |
2-45 |
a permit shall be obtained from the local governing body. The following fees may be imposed: |
2-46 |
     (1) Roof mounted systems: fifty dollars ($50.00); |
2-47 |
     (2) Pole/tower systems: |
2-48 |
     (i) Up to forty feet (40') in height: one hundred dollars ($100). |
2-49 |
     (ii) Above forty feet (40') in height: one hundred fifty dollars ($150). |
2-50 |
     45-24.6-5. Inspection required. – A structural and electrical inspection shall be |
2-51 |
conducted by the local governing official following the installation of any small wind energy |
2-52 |
system. |
2-53 |
     45-24.6-6. Utility notification. – No small wind energy system shall be installed until |
2-54 |
evidence has been provided that the utility company has been informed of the customers intent to |
3-1 |
install an interconnected customer owned generator. Off grid energy systems shall be exempt |
3-2 |
from the provisions of this section. |
3-3 |
     SECTION 2. This act shall take effect upon passage. |
      | |
======= | |
LC01631 | |
======== | |
EXPLANATION | |
BY THE LEGISLATIVE COUNCIL | |
OF | |
A N A C T | |
RELATING TO TOWNS AND CITIES -- SMALL WIND ENERGY SYSTEMS | |
*** | |
4-1 |
     This act would allow the installation of small wind energy systems subject to regulations |
4-2 |
and standards. |
4-3 |
     This act would take effect upon passage. |
      | |
======= | |
LC01631 | |
======= |