2012 -- H 7767 | |
======= | |
LC01673 | |
======= | |
STATE OF RHODE ISLAND | |
| |
IN GENERAL ASSEMBLY | |
| |
JANUARY SESSION, A.D. 2012 | |
| |
____________ | |
| |
A N A C T | |
RELATING TO HEALTH AND SAFETY - STATE BUILDING CODE | |
|
      |
|
      |
     Introduced By: Representatives Serpa, Ruggiero, Walsh, Gallison, and Ferri | |
     Date Introduced: February 16, 2012 | |
     Referred To: House Municipal Government | |
It is enacted by the General Assembly as follows: | |
1-1 |
     SECTION 1. Section 23-27.3-114.1 of the General Laws in Chapter 23-27.3 entitled |
1-2 |
"State Building Code" is hereby amended to read as follows: |
1-3 |
     23-27.3-114.1. Action on application. -- (a) The building official shall examine or cause |
1-4 |
to be examined all applications for permits and amendments thereto within fifteen (15) days after |
1-5 |
filing. Before a permit is granted for the excavation or for the erection of any building or |
1-6 |
structure, a written statement shall be furnished by the owner from a town or city engineer as to |
1-7 |
the established grades. If the application or plans do not conform to the requirements of this code |
1-8 |
or of all applicable laws, the building official shall reject the application citing the specific |
1-9 |
sections of this code or applicable law upon which the rejection is based. If the building official is |
1-10 |
satisfied that the proposed work conforms to the requirements of this code and all laws applicable |
1-11 |
thereto, he or she shall issue a permit. |
1-12 |
      (b) In cases where the permit application is for the construction of a new residential |
1-13 |
dwelling occupied by one, two (2), and/or three (3) families, the building official shall reject the |
1-14 |
application or issue the permit within forty-five (45) calendar days after the filing of the |
1-15 |
application. If after forty-five (45) calendar days the application has not been either rejected or a |
1-16 |
permit issued, the permit fee shall be reduced by fifty percent (50%). The review period shall |
1-17 |
begin on the date when the application is filed with the building official and shall include any |
1-18 |
actions on the application required by subsection (a) herein, subsection 23-28.1-2(b)(2) and 23- |
1-19 |
28.1-6 and actions by any other departments with authority over the issuance of the permit. |
2-20 |
      (c) In cases where the permit application is for the rehabilitation of an existing |
2-21 |
residential dwelling occupied by one, two (2), and/or three (3) families and affecting not more |
2-22 |
than fifty percent (50%) of the square footage of the original dwelling, the building official shall |
2-23 |
reject the application or issue the permit within fifteen (15) calendar days after the filing of the |
2-24 |
application. If after fifteen (15) calendar days the application has not been either rejected or a |
2-25 |
permit issued, the permit fee shall be reduced by fifty percent (50%). The provisions of this |
2-26 |
subsection shall apply to actions by other departments with authority over the issuance of the |
2-27 |
permit except in cases where the permit application requires plan review under sections 23-28.1- |
2-28 |
2(b)(2) and 23-28.1-6. |
2-29 |
      (d) In cases where the permit application is for the rehabilitation of an existing |
2-30 |
residential dwelling occupied by one, two (2), and/or three (3) families and affecting more than |
2-31 |
fifty percent (50%) of the square footage of the original dwelling, the building official shall reject |
2-32 |
the application or issue the permit within forty-five (45) calendar days after the filing of the |
2-33 |
application. If, after forty-five (45) calendar days, the application has not been either rejected or a |
2-34 |
permit issued, the permit fee shall be reduced by fifty percent (50%). The provisions of this |
2-35 |
subsection shall apply to actions by other departments with authority over the issuance of the |
2-36 |
permit except in cases where the permit application requires plan review under sections 23-28.1- |
2-37 |
2(b)(2) and 23-28.1-6. |
2-38 |
      (e) In cases where the permit application is for the construction of a new or existing light |
2-39 |
commercial building affecting not more than fifty thousand square feet (50,000 sq ft), the |
2-40 |
building official shall reject the application or issue the permit within forty-five (45) calendar |
2-41 |
days after the filing of the application. If, after forty-five (45) calendar days, the application has |
2-42 |
not been either rejected or a permit issued, the permit fee shall be reduced by fifty percent (50%). |
2-43 |
The provisions of this subsection shall apply to actions by other departments with authority over |
2-44 |
the issuance of the permit except in cases where the permit application requires plan review under |
2-45 |
sections 23-28.1-2(b)(2) and 23-28.1-6. |
2-46 |
      (f) If an application requires access by driveway to a state highway or state highway |
2-47 |
right of way, or the placement or alteration of curbs, or the connecting to, pumping or draining |
2-48 |
water to, the state highway drainage system, or making any alteration to the state highway |
2-49 |
system, a physical alteration permit shall first be obtained from the director of the department of |
2-50 |
transportation pursuant to rules and regulations promulgated under sections 24-8-9, 24-8-33 and |
2-51 |
24-8-34. |
2-52 |
|
2-53 |
building permit; however, the lack of a physical alteration permit shall not be cause for a building |
2-54 |
official to delay examination of the building permit application. The director of the department of |
3-1 |
transportation shall respond within thirty (30) business days; provided, however, the director of |
3-2 |
the department of transportation may extend the timeline for unusual circumstances or for |
3-3 |
complex projects. |
3-4 |
     SECTION 2. This act shall take effect upon passage. |
      | |
======= | |
LC01673 | |
======== | |
EXPLANATION | |
BY THE LEGISLATIVE COUNCIL | |
OF | |
A N A C T | |
RELATING TO HEALTH AND SAFETY - STATE BUILDING CODE | |
*** | |
4-1 |
     This act would require a physical alteration permit for the issuance of a building permit. |
4-2 |
However, the lack of a physical alteration permit would not be cause for a building official to |
4-3 |
delay examination of the building permit application. |
4-4 |
     This act would further provide that the director of the department of transportation would |
4-5 |
respond to the permit application within thirty (30) business days, and the deadline would be |
4-6 |
extended due to unusual circumstances or complex projects. |
4-7 |
     This act would take effect upon passage. |
      | |
======= | |
LC01673 | |
======= |