2013 -- S 0060 | |
======= | |
LC00432 | |
======= | |
STATE OF RHODE ISLAND | |
| |
IN GENERAL ASSEMBLY | |
| |
JANUARY SESSION, A.D. 2013 | |
| |
____________ | |
| |
A N A C T | |
RELATING TO PUBLIC UTILITIES AND CARRIERS -- EXCAVATION NEAR | |
UNDERGROUND UTILITY FACILITIES -- COSTS | |
|
      |
|
      |
     Introduced By: Senator P Fogarty | |
     Date Introduced: January 16, 2013 | |
     Referred To: Senate Corporations | |
It is enacted by the General Assembly as follows: | |
1-1 |
     SECTION 1. Chapter 39-1.2 of the General Laws entitled "Excavation Near |
1-2 |
Underground Utility Facilities" is hereby amended by adding thereto the following section: |
1-3 |
     39-1.2-2.1. Costs associated with relocation of public utility infrastructure during |
1-4 |
public works construction projects. – Any and all costs incurred by any municipal corporation |
1-5 |
as a result of the temporary or permanent relocation of any public utility infrastructure, including, |
1-6 |
but not limited to, public utility poles, during the repair, maintenance, construction or |
1-7 |
reconstruction or any municipal right-of-way shall be borne exclusively by the public utility. |
1-8 |
     SECTION 2. This act shall take effect upon passage. |
      | |
======= | |
LC00432 | |
======== | |
EXPLANATION | |
BY THE LEGISLATIVE COUNCIL | |
OF | |
A N A C T | |
RELATING TO PUBLIC UTILITIES AND CARRIERS -- EXCAVATION NEAR | |
UNDERGROUND UTILITY FACILITIES -- COSTS | |
*** | |
2-1 |
     This act would require public utilities to incur all costs incurred by municipal |
2-2 |
corporations associated with the temporary or permanent relocation of utility infrastructure such |
2-3 |
as public utility poles during public works projects within municipal rights-of-way. |
2-4 |
     This act would take effect upon passage. |
      | |
======= | |
LC00432 | |
======= |