1-1

     SECTION 1. Section 39-2-25 of the General Laws in Chapter 39-2 entitled "Duties of

1-2

Utilities and Carriers" is hereby amended to read as follows:

1-3

     39-2-25. Contact voltage, detection, repair and reporting. -- (a) As used in this section

1-4

"contact voltage" means and/or refers to a voltage resulting from abnormal power system

1-5

conditions that may be present between two (2) conductive surfaces that can be simultaneously

1-6

contacted by members of the general public and/or their animals. Contact voltage is caused by

1-7

power system fault current as it flows through the impedance of available fault current pathways.

1-8

Faults contributing to contact voltage may be due to electric system deterioration or damage, or

1-9

improper installation. Contact voltage is of greatest concern in areas where underground electric

1-10

distribution systems exist, as faults on those systems may remain active for long periods of time

1-11

before detection and repair, and therefore contact voltage is a potential shock hazard.

1-12

      (b) Notwithstanding any general or public law, rule, regulation or order to the contrary,

1-13

the Rhode Island public utilities commission and the Rhode Island division of utilities and

1-14

carriers shall initiate a proceeding within forty-five (45) days of the effective date of this section,

1-15

to establish, after notice and provision of the opportunity for comment and public hearing, a

1-16

contact voltage detection and repair program. The program shall require electric distribution

1-17

companies to implement appropriate procedures to detect contact voltage on publicly accessible

1-18

surfaces which could become energized by contact voltage due to faults in the underground

1-19

distribution system. The program shall also recognize the potential for publicly accessible objects

2-1

such as sidewalks, roadways, fences, storm drains, or other metallic gratings to become energized

2-2

by faults to the underground distribution system. The program shall require every electric

2-3

distribution company to adhere to appropriate procedures established by the commission to:

2-4

      (1) Designate contact voltage risk areas. - The boundaries of such areas shall be

2-5

approved by the commission and shall be based on the presence of underground electric

2-6

distribution and situated in pedestrian-dense areas such as urban neighborhoods, commercial

2-7

areas, central business districts, tourist heavy locations, and other places where pedestrians could

2-8

be exposed to contact voltage;

2-9

      (2) By June 30, 2013, conduct an initial survey of no less than forty percent (40%) of

2-10

designated contact voltage risk areas, for contact voltage hazards on all conductive surfaces in

2-11

public rights-of-way using equipment and technology as determined by the commission;

2-12

      (3) Beginning July 1, 2013, annually survey no less than twenty percent (20%) of

2-13

designated contact voltage risk areas, for contact voltage hazards on all conductive surfaces in

2-14

public rights-of-way using equipment and technology as determined by the commission;

2-15

      (4) Repair power system faults of the electric distribution company's underground

2-16

distribution system, that result in contact voltage appearing on publicly accessible surfaces of a

2-17

level to be determined by the division of public utilities;

2-18

      (5) If during a survey for contact voltage hazards on conductive surfaces in public rights-

2-19

of-way, an energized surface is identified and the proximate cause is found not to be a utility

2-20

company asset, then the utility company has no legal duty; however, the company may: clearly

2-21

designate the area as a contact voltage hazard, and/or notify the account owner or owner of the

2-22

asset causing the contact voltage hazard, and inform the owner of his/her obligation to perform all

2-23

necessary repairs consistent with the terms contained in this section;

2-24

      (6) Annually report on contact voltage findings, including, but not limited to, the number

2-25

and type of energized objects on both company-owned and customer-owned assets, voltage level,

2-26

corrective action taken, shocks that occur to members of the public or to pets owned by members

2-27

of the public, and any other information that the commission deems appropriate.

2-28

      (c) The commission shall require, as part of the program established pursuant to

2-29

subsection 39-2-25(b), that electric distribution companies maintain records of the testing and

2-30

subsequent maintenance or repairs performed by such electric distribution companies, and submit

2-31

copies of such records to the commission, which shall make the records available for public

2-32

inspection. The costs of this program shall be fully recovered by the utility company annually

2-33

through a fully reconciling funding mechanism to be submitted annually to the commission for

2-34

review and approval.

3-1

      (d) The commission shall review and determine which equipment and technology shall

3-2

be used for the surveying of contact voltage consistent with paragraphs (2) and (3) of subsection

3-3

(b). Such a review may include, but not be limited to, the use of mobile testing technology. An

3-4

officer of the electric distribution company shall certify, in writing, to the performance of the

3-5

selected technology.

3-6

      (e) Any electric distribution company that fails to comply with the requirements of the

3-7

program established pursuant to subsection 39-2-25(b) shall be subject to a penalty to be

3-8

determined by the commission and in compliance with Title 39.

3-9

      (f) As used in this section, "electric distribution company" means a company as defined

3-10

in subsection 39-1-2(12), but not including the Block Island Power Company or the Pascoag

3-11

Utility District.

3-12

      (g) The commission shall, within one hundred twenty (120) days of the effective date of

3-13

this section, conclude the proceeding initiated pursuant to subsection 39-2-25(b). Within these

3-14

one hundred twenty (120) days, the commission shall also issue an order establishing the contact

3-15

voltage detection and repair program. Within one year after the issuance of the order establishing

3-16

the program, and during each subsequent one year period following the date of issuance of that

3-17

order, the commission shall provide the legislature with a report on the effectiveness of the

3-18

program, and any recommendations for any changes thereto, including whether to require the

3-19

Block Island Power Company or the Pascoag Utility District to develop and participate in a

3-20

contact voltage detection and repair program.

3-21

     SECTION 2. This act shall take effect upon passage.

     

=======

LC01845

=======

EXPLANATION

BY THE LEGISLATIVE COUNCIL

OF

A N A C T

RELATING TO PUBLIC UTILITIES AND CARRIERS - DUTIES OF UTILITIES AND

CARRIERS

***

4-1

     This act would require that an officer of the electric distribution company would certify,

4-2

in writing, to the performance of selected technology which is used for the surveying of contact

4-3

voltage.

4-4

     This act would take effect upon passage.

=======