2013 -- S 0475

=======

LC01797

=======

STATE OF RHODE ISLAND

IN GENERAL ASSEMBLY

JANUARY SESSION, A.D. 2013

____________

A N A C T

RELATING TO LABOR AND LABOR RELATIONS - HOISTING ENGINEERS

     

     

     Introduced By: Senators Cool Rumsey, Doyle, DaPonte, Jabour, and Nesselbush

     Date Introduced: February 28, 2013

     Referred To: Senate Judiciary

It is enacted by the General Assembly as follows:

1-1

     SECTION 1. Section 28-26-7 of the General Laws in Chapter 28-26 entitled "Hoisting

1-2

Engineers" is hereby amended to read as follows:

1-3

     28-26-7. Application for license -- Examination. -- (a) Each person who desires to act

1-4

as a steam, internal combustion engines, electric, or compressed air hoisting engineer shall make

1-5

application to the division for a license upon a form furnished to him or her, submit a notarized

1-6

list of work experience, and shall pass an examination on the construction and operation of steam,

1-7

electric, internal combustion engines, and compressed air engines and machinery. Applications

1-8

for examinations must be received fifteen (15) working days prior to the examination date.

1-9

      (b) Any person applying for a license and who knowingly makes any misstatement as to

1-10

his or her work experience or other qualifications shall be subject to the penalties provided for in

1-11

section 28-26-11.

1-12

      (c) In addition to the requirements for submitting an application for examination, as

1-13

required in subsection (a) above, any person applying for a full license, a hydraulic crane license,

1-14

or a lattice crane license shall also be required to have possessed for at least three (3) years prior

1-15

to the filing of the application, a certificate of registration in full force and effect from the Rhode

1-16

Island department of labor and training specifying that person as a registered apprentice hoisting

1-17

engineer and the application of that applicant is accompanied with an affidavit or affidavits of his

1-18

or her employer or former employers or other reasonably satisfactory evidence showing that the

1-19

applicant has been actually engaged in hoisting work as an apprentice hoisting engineer in the

1-20

state of Rhode Island for six thousand (6,000) hours of on the job training during a three (3) year

2-1

period, which shall include the successful completion of four hundred thirty-two (432) hours of

2-2

related instruction at a training program recognized by the department of labor and training, and

2-3

include a valid medical health card with their application. A separate notarized statement shall

2-4

also be attached to the application, and shall contain all work related experience, including all

2-5

equipment trained on and/or operated.

2-6

      (d) In addition to the requirements for submitting an application for examination, as

2-7

required in subsection (a) above, any person applying for a construction forklift license or a full

2-8

license shall also be required to include a copy of their OSHA forklift certification with their

2-9

application.

2-10

     SECTION 2. This act shall take effect upon passage.

     

=======

LC01797

========

EXPLANATION

BY THE LEGISLATIVE COUNCIL

OF

A N A C T

RELATING TO LABOR AND LABOR RELATIONS - HOISTING ENGINEERS

***

3-1

     This act would require participation in an apprentice program and other requirements to

3-2

obtain a hoisting engineers license.

3-3

     This act would take effect upon passage.

     

=======

LC01797

=======

S0475