RELATING TO PUBLIC UTILITIES AND CARRIERS - DISTRIBUTED GENERATION

STANDARD CONTRACTS

     

     

     Introduced By: Senators Walaska, Miller, Paiva Weed, Ruggerio, and DiPalma

     Date Introduced: March 06, 2013

     Referred To: Senate Environment & Agriculture

It is enacted by the General Assembly as follows:

1-1

     SECTION 1. Sections 39-26.2-3, 39-26.2-4, 39-26.2-6 and 39-26.2-7 of the General

1-2

Laws in Chapter 39-26.2 entitled "Distributed Generation Standard Contracts" are hereby

1-3

amended to read as follows:

1-4

     39-26.2-3. Definitions. -- When used in this chapter, the following terms shall have the

1-5

following meanings:

1-6

      (1) "Annual target" means the target for total renewable energy nameplate capacity of

1-7

new distributed generation standard contracts set out in section 39-26.2-3.

1-8

      (2) "Commission" means the Rhode Island public utilities commission.

1-9

      (3) "Board" shall mean the distributed generation standard contract board established

1-10

pursuant to the provisions of chapter 39-26.2-9, or the office of energy resources. Until such time

1-11

as the board is duly constituted, the office of energy resources shall serve as the board with the

1-12

same powers and duties pursuant to this chapter.

1-13

      (4) "Distributed generation contract capacity" means ten percent (10%) of an electric

1-14

distribution company's minimum long-term contract capacity under the long-term contracting

1-15

standard for renewable energy in section 39-26.1-2, inclusive of solar capacity. The distributed

1-16

generation contract capacity shall be reserved for acquisition by the electric distribution company

1-17

through standard contracts pursuant to the provisions of this chapter.

1-18

      (5) "Distributed generation facility" means an electrical generation facility that is a

1-19

newly developed renewable energy resource as defined in section 39-26.1-2, located in the

2-1

electric distribution company's load zone with a nameplate capacity no greater than five

2-2

megawatts (5 MW), using eligible renewable energy resources as defined by section 39-26-5,

2-3

including biogas created as a result of anaerobic digestion, but, specifically excluding all other

2-4

listed eligible biomass fuels, and connected to an electrical power system owned, controlled, or

2-5

operated by the electric distribution company.

2-6

      (6) "Distributed generation project" means a distinct installation of a distributed

2-7

generation facility. An installation will be considered distinct if it is installed in a different

2-8

geographical location and at a different time, or if it involves a different type of renewable energy

2-9

class.

2-10

      (7) "Electric distribution company" means a company defined in subdivision 39-1-2(12),

2-11

supplying standard offer service, last resort service, or any successor service to end-use

2-12

customers, but not including the Block Island Power Company or the Pascoag Utility District.

2-13

      (8) "Large distributed generation project" means a distributed generation project that has

2-14

a nameplate capacity that exceeds the size of a small distributed generation project in a given

2-15

year, but is no greater than five megawatts (5 MW) nameplate capacity.

2-16

      (9) "Program year" means a calendar year beginning January 1 and ending December 31.

2-17

      (10) "Renewable energy classes" means categories for different renewable energy

2-18

technologies using eligible renewable energy resources as defined by section 39-26-5. For each

2-19

program year, the board shall determine the renewable energy classes as are reasonably feasible

2-20

for use in meeting distributed generation objectives from renewable energy resources and are

2-21

consistent with the goal of meeting the annual target for the program year. For the program year

2-22

ending December 31, 2012, there shall be at least four (4) technology classes and at least two (2)

2-23

shall be for solar generation technology, and at least one shall be for wind. The board may add,

2-24

eliminate, or adjust renewable energy classes for each program year with public notice given at

2-25

least sixty (60) days previous to any renewable energy class change becoming effective. For each

2-26

program year, the board shall set renewable energy class targets for each class established. Class

2-27

targets are the total program-year target amounts of nameplate capacity reserved for standard

2-28

contracts for each renewable energy class. The sum of all the class targets shall equal the annual

2-29

target.

2-30

      (11) "Renewable energy credit" means a New England Generation Information System

2-31

renewable energy certificate as defined in subdivision 39-26-2(15);

2-32

      (12) "Small distributed generation project" means a distributed generation renewable

2-33

energy project that has a nameplate capacity no larger than within the following: Solar: fifty

2-34

kilowatts (50 KW) to five hundred kilowatts (500 KW); Wind: fifty kilowatts (50 KW) to one and

3-1

one-half megawatts (1.5 MW). For technologies other than solar and wind, the board shall set the

3-2

nameplate capacity size limits, but such limits may not exceed one megawatt. The board may

3-3

lower the nameplate capacity from year to year for any of these categories, but may not increase

3-4

the capacity beyond what is specified in this definition. In no case may a project developer be

3-5

allowed to segment a distributed generation project into smaller sized projects in order to fall

3-6

under this definition.

3-7

      (13) "Standard contract" means a contract with a term of fifteen (15) years at a fixed rate

3-8

for the purchase of all capacity, energy, and attributes generated by a distributed generation

3-9

facility. A contract may have a different term if it is mutually agreed to by the seller and the

3-10

electric distribution company and it is approved by the commission. The terms of the standard

3-11

contract for each program year and for each renewable energy class shall be set pursuant to the

3-12

provisions of this chapter.

3-13

      (14) "Standard contract ceiling price" means the standard contract price for the output of

3-14

a distributed generation facility which price is approved annually for each renewable energy class

3-15

pursuant to the procedure established in this chapter, for the purchase of energy, capacity,

3-16

renewable energy certificates, and all other environmental attributes and market products that are

3-17

available or may become available from the distributed generation facility.

3-18

     39-26.2-4. Standard contracts -- Annual targets. -- (a) To the extent eligible projects

3-19

are available and submit conforming applications, an electric distribution company shall enter

3-20

into standard contracts for an aggregate nameplate capacity of at least forty megawatts (40 MW)

3-21

of distributed generation projects by the end of 2014, unless such schedule is extended by the

3-22

board. The contracting shall be spread over four (4) years, based on the annual targets, aggregated

3-23

to reflect annual targets from prior program years, contained in the following four (4) year phased

3-24

schedule, unless such schedule is adjusted by the board in any given year:

3-25

      (1) By December 30, 2011: a minimum of five megawatts (5 MW) nameplate;

3-26

      (2) By December 30, 2012: a minimum aggregate of twenty megawatts (20 MW)

3-27

nameplate;

3-28

      (3) By December 30, 2013: a minimum aggregate of thirty megawatts (30 MW)

3-29

nameplate;

3-30

      (4) By December 30, 2014: a minimum aggregate of forty megawatts (40 MW)

3-31

nameplate.

3-32

      (b) By October 15, 2011 and each calendar year following until October 15, 2013, the

3-33

board may recommend to the commission that the annual target for the following program year

3-34

be adjusted upward to reflect any shortfalls in meeting the previous program year's annual target

4-1

or to reflect any standard contracts entered into during prior program years that are voided. The

4-2

board may also recommend to the commission that the annual target for the following program

4-3

year be adjusted downward by any amounts that the previous program year's annual targets were

4-4

exceeded by the standard contracts entered into during that program year.

4-5

      (c) The board may, based on market data and other information available to it including

4-6

pricing for standard contracts received during previous program years, recommend a reduction of

4-7

the annual target for the upcoming program year where the board determines that market

4-8

conditions would be likely to produce unfavorably high target pricing for standard contracts

4-9

during that upcoming program year. In considering such issues, the board may take into account

4-10

the reasonableness of current pricing and its impact on all electric distribution customers who will

4-11

be paying for the output for up to twenty (20) years at such prices. The board may also and the

4-12

commission may recommend an extension of time to achieve the forty megawatt (40 MW) target

4-13

targets, to allow for contracting to occur after 2014, if necessary.

4-14

      (d) The electric distribution company must contract for at least forty megawatts (40

4-15

MW) of nameplate capacity distributed generation projects by the end of 2014, unless such

4-16

schedule is extended by the board. The electric distribution company may not be required to

4-17

contract for more than forty megawatts (40 MW) or the distributed generation contract capacity,

4-18

but may do so voluntarily, subject to commission approval.

4-19

      (e) Each year, the board shall file its recommendations relating to the schedule, along

4-20

with its report and recommendations regarding ceiling prices, for the commission's review and

4-21

approval as specified in subsection 39-26.2-5(b).

4-22

      (f) Nothing in this chapter shall derogate from the statutory authority of the commission

4-23

or the division, including, but not limited to, the authority to protect ratepayers from unreasonable

4-24

rates.

4-25

     39-26.2-6. Standard contract enrollment program. -- (a) Each electric distribution

4-26

company shall conduct at least three (3) standard contract enrollments during each program year;

4-27

however, during 2011 the electric distribution company need only conduct one enrollment. Each

4-28

enrollment shall be open for a two (2) week period during which the electric distribution

4-29

company is required to receive standard short-form applications requesting standard contracts for

4-30

distributed generation energy projects. The short-form applications shall require the applicant to

4-31

provide the project owner's identity and the project's proposed location, nameplate capacity, and

4-32

renewable energy class and allow for additional information relative to the permitting, financial

4-33

feasibility, ability to build, and timing for deployment of the proposed projects. For small

4-34

distributed generation projects, the applicant must submit an affidavit confirming that the project

5-1

is not a segment of a larger project being planned for enlargement over time. For large distributed

5-2

generation projects, the short-form application shall also require the applicant to bid a bundled

5-3

price for the sale of the energy, capacity, renewable energy certificates, and all other

5-4

environmental attributes and market products that are available or may become available from the

5-5

distributed generation facility, on a per kilowatt-hour basis for the output of the project. Subject

5-6

to the provisions of subsections (b) and (c) below, the electric distribution company shall not be

5-7

required to enter into standard contracts in excess of the annual target for the applicable program

5-8

year and shall not be required to enter into standard contracts in excess of any limit set by the

5-9

board and approved by the commission for a given enrollment. However, the electric distribution

5-10

company may voluntarily exceed an enrollment period limit as long as it does not exceed an

5-11

annual target for the applicable program year.

5-12

      (b) For small distributed generation projects, the electric distribution company on a first-

5-13

come, first-served basis, shall enter into standard contracts at based on the lowest proposed price

5-14

received for the approved technology classes, but not to exceed the applicable standard contract

5-15

ceiling price with any distributed generation project which meets the requirements of all

5-16

applicable tariffs and regulations, and meets the criteria of a renewable energy class in effect,

5-17

until the class target is met. Enrollment periods will be governed by a solicitation and enrollment

5-18

process rules that shall be filed with the commission each October 15 by the electric distribution

5-19

company, and approved by the commission within sixty (60) days of such filing.

5-20

      (c) For large distributed generation projects, the electric distribution company shall

5-21

select projects for standard contracts based on the lowest proposed prices received, but not to

5-22

exceed the applicable standard contract ceiling price, provided, that the selected projects meet the

5-23

requirements of all applicable tariffs and regulations and meet the criteria of a renewable energy

5-24

class in effect until the class target is met. Except for 2011, no enrollment period shall seek to

5-25

enroll more than one-third (1/3) of the annual goal for the distribution company for large

5-26

distributed generation projects.

5-27

      (d) If there are more projects than what is specified for a class target at the same price,

5-28

the electric distribution company shall review in consultation with the office of energy resources

5-29

the applications submitted and select first those projects that appear to be the furthest along in

5-30

development and likely to be deployed. Those projects that are likely to be deployed on the

5-31

earliest timelines shall be selected. To the extent the electric distribution company is unable to

5-32

make a clear distinction on this basis, the electric company shall report the results to the board

5-33

and not enter into contracts with those projects that are tied on pricing. In such case, the board

5-34

may take such action as it deems appropriate for the selection of projects, including seeking more

6-1

information from the projects. Alternatively, the board may consider adjustments to the ceiling

6-2

price and a rebid, or simply wait until the next enrollment. The office of energy resources is

6-3

authorized to request copies of submitted applications from the distribution company in order to

6-4

verify accuracy of the reported data and information.

6-5

      (e) Should an electric distribution company determine that it has entered into sufficient

6-6

standard contracts to achieve a program-year class target, it shall immediately report this to the

6-7

board, the office of energy resources, and the commission, and cease entering into standard

6-8

contracts for that renewable energy class for the remainder of the program year. An electric

6-9

distribution company may exceed the renewable energy class target if the last standard contract

6-10

entered into may cause the total purchased to exceed the target.

6-11

      (f) The electric distribution company is authorized to enter into standard contracts up to

6-12

the applicable ceiling price. As long as the terms of the standard contract are materially the same

6-13

as the standard contract terms approved by the commission and the pricing is no higher than the

6-14

applicable ceiling price, such contracts shall be deemed prudent and approved by the commission

6-15

for purposes of recovering the costs in rates.

6-16

      (g) A distributed generation project that also is being employed by a customer for net

6-17

metering purposes may submit an application to sell the excess output from its distributed

6-18

generation project. In such case, however, at the election of the self-generator all of the renewable

6-19

energy certificates and environmental attributes pertaining to the energy consumed on site may be

6-20

sold to the electric distribution company on a month-to-month basis outside of the terms of the

6-21

standard contract. In such case, the portion of the renewable energy certificates that pertain to the

6-22

energy consumed on site during the net metering billing period shall be priced at the average

6-23

market price of renewable energy certificates, which may be determined by using the price of

6-24

renewable energy certificates purchased or sold by the electric distribution company.

6-25

     39-26.2-7. Standard contract -- Form and provisions. -- The following process shall be

6-26

implemented to establish the non-price terms and conditions of the standard contract:

6-27

      (1) A working group ("contract working group") shall be established and supervised by

6-28

the board, consisting of the following members: (i) The director of the office of energy resources;

6-29

(ii) A designee from the division of public utilities and carriers; (iii) Two (2) designees of the

6-30

electric distribution company; (iv) Two (2) individuals designated by the office of energy

6-31

resources who are experienced developers of renewable generation projects; (v) One individual

6-32

designated by the office of energy resources who represents a customer of the electric distribution

6-33

company; and (vi) A lawyer designated by the office of energy resources who has at least three

6-34

(3) years of experience in negotiating and/or developing power purchase agreements. With

7-1

respect to the lawyer designated in (vi) above, the electric distribution company shall enter into a

7-2

cost reimbursement agreement with such lawyer, to compensate the lawyer for the time spent

7-3

serving in the contract working group at the reasonable hourly rate negotiated by the office of

7-4

energy resources. The costs incurred by the electric distribution company under the

7-5

reimbursement agreement shall be recovered in rates by the electric distribution company in the

7-6

year incurred or the year following incurrence through an appropriate filing with the commission.

7-7

The contract working group shall be an advisory group that is not to be considered to be an

7-8

agency for purposes of the administrative procedures act or any other laws pertaining to public

7-9

bodies.

7-10

      (2) The contract working group shall work in good faith to develop standard contracts

7-11

that would be applicable for various technologies for both small and large distributed generation

7-12

projects. The standard contracts should balance the need for the project to obtain financing

7-13

against the need for the distribution company to protect itself and its distribution customers

7-14

against unreasonable risks. The standard contract should be developed from contracting terms

7-15

typically utilized in the wholesale power industry, taking into account the size of each project and

7-16

the technology. The standard contracts shall provide for the purchase of energy, capacity,

7-17

renewable energy certificates, and all other environmental attributes and market products that are

7-18

available or may become available from the distributed generation facility. However, the electric

7-19

distribution company shall retain the right to separate out pricing for each market product under

7-20

the contracts for administrative and accounting purposes to avoid any detrimental accounting

7-21

effects or for administrative convenience, provided that such accounting as specified in the

7-22

contract does not affect the price and financial benefits to the seller as a seller of a bundled

7-23

product. The standard contract also shall:

7-24

      (i) Hold the distributed generation facility owner liable for the cost of interconnection

7-25

from the distributed generation facility to the interconnect point with the distribution system, and

7-26

for any upgrades to the existing distributed generation system that may be required by the electric

7-27

distribution company. However, a distributed generation facility owner may appeal to the

7-28

commission to reduce any required system upgrade costs to the extent such upgrades can be

7-29

shown to benefit other customers of the electric distribution company and the balance of such

7-30

costs shall be included in rates by the electric distribution company for recovery in the year

7-31

incurred or the year following incurrence;

7-32

      (ii) Require the distributed generation facility owner to make a performance guarantee

7-33

deposit to the electric distribution company of fifteen dollars ($15.00) for small distributed

7-34

generation projects or twenty-five dollars ($25.00) for large distributed generation projects for

8-1

every renewable energy certificate estimated to be generated per year under the contract, but at

8-2

least five hundred dollars ($500) and not more than seventy-five thousand dollars ($75,000), paid

8-3

at the time of contract execution;

8-4

      (iii) Require the electric distribution company to refund the performance guarantee

8-5

deposit on a pro-rated basis of renewable energy credits actually delivered by the distributed

8-6

generation facility over the course of the first year of the project's operation, paid quarterly;

8-7

      (iv) Provide that if the distributed generation facility has not generated the output

8-8

proposed in its enrollment application, with the exception of hydroelectric facilities, is not fully

8-9

operational within eighteen (18) months after execution of the contract, the contract is

8-10

automatically voided and the performance guarantee is forfeited. Eligible hydroelectric

8-11

distribution generation facilities that are not fully operational within thirty (30) months after the

8-12

execution of the contract, the contract is automatically voided and the performance guarantee is

8-13

forfeited. Any forfeited performance guarantee deposits shall be credited to all distribution

8-14

customers in rates and not retained by the electric distribution company; all projects that have

8-15

executed contracts with the distribution company shall be required to have their distributed

8-16

generation system produce ninety percent (90%) of the kilowatt or megawatt output in the

8-17

submitted application, and shall be verified by the distribution company within eighteen (18)

8-18

months after the execution of the contract. Any distributed generation facility that fails this output

8-19

requirement shall result in the contract automatically being voided and the performance guarantee

8-20

forfeited.

8-21

      (v) Provide for flexible payment schedules that may be negotiated between the buyer and

8-22

seller, but shall be no longer than quarterly if an agreement cannot be reached;

8-23

      (vi) Require that an electric meter which conforms with standard industry norms be

8-24

installed to measure the electrical energy output of the distributed generation facility, and require

8-25

a system or procedure by which the distributed generation facility owner shall demonstrate

8-26

creation of renewable energy credits, in a manner recognized and accounted for by the GIS; such

8-27

demonstration of renewable energy credit creation to be at the distributed generation facility

8-28

owner's expense. The electric distribution company may, at its discretion, offer to provide such a

8-29

renewable energy credit measurement and accounting system or procedure to the distributed

8-30

generation facility owner, and the distributed generation facility owner may, at its discretion, use

8-31

the electric distribution company's program, or use that of an independent third party, approved

8-32

by the commission, and the costs of such measurement and accounting are paid for by the

8-33

distributed generation facility owner.

9-34

     (vii) All distributed generation projects that have executed contracts will be required to

9-35

submit quarterly reports on the progress of the project to the distribution company and the office

9-36

of energy resources. Failure to submit these quarterly progress reports may result in the

9-37

termination of the contract.

9-38

      (3) If the contract working group reaches agreement on the terms of standard contracts,

9-39

the board shall file the contracts with the commission for approval. If there are any

9-40

disagreements, they shall be identified to the commission. The commission shall review the

9-41

standard contracts for conformance with the standards set forth in subsection (2). Should there be

9-42

any disputes, the commission shall issue an order resolving them. To the extent the commission

9-43

needs expert assistance to resolve any disagreements noted in the filing, the commission is

9-44

authorized to hire a consultant to assist it in the proceedings, the costs of which shall be recovered

9-45

from electric distribution customers pursuant to a uniform factor established by the commission

9-46

in rates for recovery by the electric distribution company in the year incurred or the year

9-47

following incurrence, as requested through a filing by the electric distribution company. The

9-48

commission shall issue an order approving standard forms of contract within sixty (60) days of

9-49

the filing.

9-50

     SECTION 2. This act shall take effect upon passage.

     

=======

LC01653

========

EXPLANATION

BY THE LEGISLATIVE COUNCIL

OF

A N A C T

RELATING TO PUBLIC UTILITIES AND CARRIERS - DISTRIBUTED GENERATION

STANDARD CONTRACTS

***

10-1

     This act would amend the definition of small distributed generation project, and would

10-2

allow hydroelectric projects to participate in the standard contract enforcement program.

10-3

     This act would take effect upon passage.

     

=======