2013 -- S 0888

=======

LC02308

=======

STATE OF RHODE ISLAND

IN GENERAL ASSEMBLY

JANUARY SESSION, A.D. 2013

____________

A N A C T

RELATING TO PUBLIC PROPERTY AND WORKS

     

     

     Introduced By: Senators Miller, Gallo, Doyle, Ciccone, and Lombardi

     Date Introduced: April 25, 2013

     Referred To: Senate Labor

It is enacted by the General Assembly as follows:

1-1

     SECTION 1. Sections 37-2-18, 37-2-27.1 and 37-2-39 of the General Laws in Chapter

1-2

37-2 entitled "State Purchases" are hereby amended to read as follows:

1-3

     37-2-18. Competitive sealed bidding. -- (a) Contracts exceeding the amount provided by

1-4

section 37-2-22 shall be awarded by competitive sealed bidding unless it is determined in writing

1-5

that this method is not practicable or that the best value for the state may be obtained by using an

1-6

alternative method of management of construction contracting as provided under this chapter or

1-7

regulations promulgated pursuant to section 37-2-39 electronic reverse auction as set forth in

1-8

section 37-2-18.1. Factors to be considered in determining whether competitive sealed bidding is

1-9

practicable shall include whether:

1-10

      (1) Specifications can be prepared that permit award on the basis of either the lowest bid

1-11

price or the lowest evaluated bid price; and

1-12

      (2) The available sources, the time and place of performance, and other relevant

1-13

circumstances as are appropriate for the use of competitive sealed bidding. ;

1-14

     (3) The anticipated complexity of the project such as infrastructure, structure, demolition,

1-15

abatement, adjacency to other structures, or abutters, site constraints, building systems,

1-16

uniqueness of design elements or environmental implications;

1-17

     (4) The size, scope, and estimated cost of the project;

1-18

     (5) The adequacy of available documentation regarding the existing site, buildings or

1-19

structures; abutters infrastructure, buildings, or structures; or other documentation of as-built

1-20

conditions;

2-1

     (6) Phasing or logistical challenges arising out of the need to maintain existing

2-2

occupancy, continue existing operations, provide phased occupancy, or achieve more favorable

2-3

project financing terms;

2-4

     (7) The anticipated impact of fast tracked design and construction on project cost or

2-5

schedule;

2-6

     (8) Potential to achieve optimal minority or women business enterprise participation in

2-7

accordance with applicable state regulations;

2-8

     (9) The amount and type of financing available for the project, including, whether the

2-9

budget is fixed and the source of funding, e.g., general or special appropriation, federal assistance

2-10

moneys, general obligation bonds or revenue bonds;

2-11

     (10) The administration or implementation of procedures required to comply with

2-12

applicable regulations or statutes; and

2-13

     (11) Mitigating the potential claims against the state arising from the inherent risks

2-14

associated with factors noted in subdivisions (3) through (10) above.

2-15

      (b) The invitation for bids shall state whether the award shall be made on the basis of the

2-16

lowest bid price or the lowest evaluated or responsive bid price. If the latter basis is used, the

2-17

objective measurable criteria to be utilized shall be set forth in the invitation for bids, if available.

2-18

All documents submitted in response to the bid proposal are public pursuant to chapter 38-2 upon

2-19

opening of the bids. The invitation for bids shall state that each bidder must submit a copy of their

2-20

bid proposal to be available for public inspection upon the opening of the bids. The burden to

2-21

identify and withhold from the public copy that is released at the bid opening any trade secrets,

2-22

commercial or financial information, or other information the bidder deems not subject to public

2-23

disclosure pursuant to chapter 38-2, the Access to Public Records Act, shall rest with the bidder

2-24

submitting the bid proposal.

2-25

      (c) Unless the invitations for bid are accessible under the provisions as provided in

2-26

section 37-2-17.1, public notice of the invitation for bids shall be given a sufficient time prior to

2-27

the date set forth therein for the opening of bids. Public notice may include publication in a

2-28

newspaper of general circulation in the state as determined by the purchasing agent not less than

2-29

seven (7) days nor more than twenty-eight (28) days before the date set for the opening of the

2-30

bids. The purchasing agent may make a written determination that the twenty-eight (28) day

2-31

limitation needs to be waived. The written determination shall state the reason why the twenty-

2-32

eight (28) day limitation is being waived and shall state the number of days, giving a minimum

2-33

and maximum, before the date set for the opening of bids when public notice is to be given.

3-34

      (d) Bids shall be opened and read aloud publicly at the time and place designated in the

3-35

invitation for bids. Each bid, together with the name of the bidder, shall be recorded and an

3-36

abstract made available for public inspection.

3-37

      (e) The chief purchasing officer shall adopt and file regulations governing the bidding of

3-38

highway and bridge construction projects in the state not later than December 31, 2011.

3-39

      (f) Immediately subsequent to the opening of the bids, the copies of bid documents

3-40

submitted pursuant to subsection 37-2-18(b) shall be made available for inspection by the public.

3-41

Any objection to any bid on the grounds that it is nonresponsive to the invitation for bids must be

3-42

filed with the purchasing agent within five (5) business days of the opening of the bids. The

3-43

purchasing agent shall issue a written determination as to whether the subject bid is

3-44

nonresponsive addressing each assertion in the objection and shall provide a copy of the

3-45

determination to the objector and all those who submitted bids at least seven (7) business days

3-46

prior to the award of the contract. If a bid is nonresponsive to the requirements in the invitation to

3-47

bid, the bid is invalid and the purchasing agent shall reject the bid. The purchasing agent shall

3-48

have no discretion to waive any requirements in the invitation to bid which are identified as

3-49

mandatory. Nothing in this section shall be construed to interfere with or invalidate the results of

3-50

the due diligence conducted by the division of purchasing to determine whether bids are

3-51

responsive and responsible.

3-52

      (g) Subsequent to the awarding of the bid, all documents pertinent to the awarding of the

3-53

bid that were not made public pursuant to subsection 37-2-18(e) shall be made available and open

3-54

to public inspection, pursuant to chapter 38-2, the Access to Public Records Act, and retained in

3-55

the bid file. The copy of the bid proposal provided pursuant to subsection 37-2-18(b) shall be

3-56

retained until the bid is awarded.

3-57

      (h) The contract shall be awarded with reasonable promptness by written notice to the

3-58

responsive and responsible bidder whose bid is either the lowest bid price, lowest evaluated, or

3-59

responsive bid price.

3-60

      (i) Correction or withdrawal of bids may be allowed only to the extent permitted by

3-61

regulations issued by the chief purchasing officer.

3-62

      (j) As of January 1, 2011, this section shall apply to contracts greater than one million

3-63

dollars ($1,000,000); on January 1, 2012 for all contracts greater than seven hundred fifty

3-64

thousand dollars ($750,000); on January 1, 2013 for all contracts greater than five hundred

3-65

thousand dollars ($500,000); and on January 1, 2014 for all contracts awarded pursuant to this

3-66

section.

3-67

     37-2-27.1. Procurement of construction manager at-risk services -- Written

3-68

determination. -- (a) Prior to procuring construction manager at-risk services the chief

4-1

purchasing officer must sign a written determination documenting the following:

4-2

      (1) That in accordance with the factors set forth in subsection section 37-2-18(a), a

4-3

general contractor selected as the lowest responsive bidder based on a lump-sum, fixed fee

4-4

contract is not practicable for the construction of the project and or will not result in the best

4-5

value for the state;

4-6

      (2) That the using agency has clearly identified in writing why the use of construction

4-7

management at-risk services is appropriate for the building project;

4-8

      (3) That the building project has an estimated construction value of five million dollars

4-9

($5,000,000) or more;

4-10

      (4) That the using agency has in place written procedures to ensure fairness in

4-11

competition, evaluation and reporting of results at every stage in the procurement process;

4-12

      (5) That the using agency has the capacity, a detailed plan and procedures in place to

4-13

effectively procure and manage construction management at-risk services for the specific project

4-14

and has procured the services of a qualified owner's program manager pursuant to chapter 37-2;

4-15

and

4-16

      (6) That the using agency has a detailed, written plan with clearly identified procedures

4-17

to monitor and approve all reimbursable costs.

4-18

      The chief purchasing officer shall file copies of the written determination with the

4-19

president of the senate, the speaker of the house, the senate fiscal advisor and the house fiscal

4-20

advisor no later than three (3) business days after executing the written determination.

4-21

      (b) Notwithstanding any other provision to the contrary, including any provision

4-22

exempting any entity from the requirements of this chapter, the chief executive officer of a public

4-23

corporation as defined in subdivision 35-20-5(4) or the chief executive officer of a quasi-public

4-24

agency, prior to procuring construction manager at-risk services shall sign a written determination

4-25

documenting the following:

4-26

      (1) That in accordance with the factors set forth in subsection section 37-2-18(a), a

4-27

general contractor selected as the lowest responsive bidder based on a lump-sum, fixed fee

4-28

contract is not practicable for the construction of the project and or will not result in the best

4-29

value for the state;

4-30

      (2) Why the use of construction management at-risk services is appropriate for the

4-31

building project;

4-32

      (3) That the building project has an estimated construction value of five million dollars

4-33

($5,000,000) or more;

5-34

      (4) That there is in place written procedures to ensure fairness in competition, evaluation

5-35

and reporting of results at every stage in the procurement process;

5-36

      (5) That the corporation or quasi-public agency has the capacity, a detailed plan, and

5-37

procedures in place to effectively procure and manage construction management at-risk services

5-38

for the specific project and has procured the services of a qualified owner's program manager, as

5-39

set forth in subdivision 37-2-7(32); and

5-40

      (6) That there is a detailed, written plan with clearly identified procedures to monitor and

5-41

approve all reimbursable costs.

5-42

      The chief executive officer shall file copies of the written determination with the

5-43

president of the senate, the speaker of the house, the senate fiscal advisor, and the house fiscal

5-44

advisor no later than three (3) business days after executing the written determination.

5-45

     37-2-39. Responsibility for selection of methods of construction contracting

5-46

management. -- The chief purchasing officer shall issue regulations providing for as many

5-47

alternative methods of management of construction contracting as he or she may determine to be

5-48

feasible, setting forth criteria factors to be used in determining which method of management of

5-49

construction is to be used for a particular project, and granting to the purchasing agent, or the

5-50

purchasing agency responsible for carrying out the construction project, the discretion to select

5-51

the appropriate method of construction contracting for a particular project, provided, however,

5-52

that the chief purchasing officer shall execute and include in the contract file a written statement

5-53

setting forth the facts which led to the selection of a particular method of management of

5-54

construction contracting in each instance.

5-55

     SECTION 2. This act shall take effect upon passage.

     

=======

LC02308

=======

EXPLANATION

BY THE LEGISLATIVE COUNCIL

OF

A N A C T

RELATING TO PUBLIC PROPERTY AND WORKS

***

6-1

     This act would make changes to the law permitting the state to enter into non-competitive

6-2

bid construction and demolition contracts under some circumstances.

6-3

     This act would take effect upon passage.

     

=======

LC02308

=======

S0888