2013 -- S 0888 | |
======= | |
LC02308 | |
======= | |
STATE OF RHODE ISLAND | |
| |
IN GENERAL ASSEMBLY | |
| |
JANUARY SESSION, A.D. 2013 | |
| |
____________ | |
| |
A N A C T | |
RELATING TO PUBLIC PROPERTY AND WORKS | |
|
      |
|
      |
     Introduced By: Senators Miller, Gallo, Doyle, Ciccone, and Lombardi | |
     Date Introduced: April 25, 2013 | |
     Referred To: Senate Labor | |
It is enacted by the General Assembly as follows: | |
1-1 |
     SECTION 1. Sections 37-2-18, 37-2-27.1 and 37-2-39 of the General Laws in Chapter |
1-2 |
37-2 entitled "State Purchases" are hereby amended to read as follows: |
1-3 |
     37-2-18. Competitive sealed bidding. -- (a) Contracts exceeding the amount provided by |
1-4 |
section 37-2-22 shall be awarded by competitive sealed bidding unless it is determined in writing |
1-5 |
that this method is not practicable or that the best value for the state may be obtained by using an |
1-6 |
alternative method of management of construction contracting as provided under this chapter or |
1-7 |
regulations promulgated pursuant to section 37-2-39 |
1-8 |
|
1-9 |
practicable shall include whether: |
1-10 |
      (1) Specifications can be prepared that permit award on the basis of either the lowest bid |
1-11 |
price or the lowest evaluated bid price; |
1-12 |
      (2) The available sources, the time and place of performance, and other relevant |
1-13 |
circumstances as are appropriate for the use of competitive sealed bidding |
1-14 |
     (3) The anticipated complexity of the project such as infrastructure, structure, demolition, |
1-15 |
abatement, adjacency to other structures, or abutters, site constraints, building systems, |
1-16 |
uniqueness of design elements or environmental implications; |
1-17 |
     (4) The size, scope, and estimated cost of the project; |
1-18 |
     (5) The adequacy of available documentation regarding the existing site, buildings or |
1-19 |
structures; abutters infrastructure, buildings, or structures; or other documentation of as-built |
1-20 |
conditions; |
2-1 |
     (6) Phasing or logistical challenges arising out of the need to maintain existing |
2-2 |
occupancy, continue existing operations, provide phased occupancy, or achieve more favorable |
2-3 |
project financing terms; |
2-4 |
     (7) The anticipated impact of fast tracked design and construction on project cost or |
2-5 |
schedule; |
2-6 |
     (8) Potential to achieve optimal minority or women business enterprise participation in |
2-7 |
accordance with applicable state regulations; |
2-8 |
     (9) The amount and type of financing available for the project, including, whether the |
2-9 |
budget is fixed and the source of funding, e.g., general or special appropriation, federal assistance |
2-10 |
moneys, general obligation bonds or revenue bonds; |
2-11 |
     (10) The administration or implementation of procedures required to comply with |
2-12 |
applicable regulations or statutes; and |
2-13 |
     (11) Mitigating the potential claims against the state arising from the inherent risks |
2-14 |
associated with factors noted in subdivisions (3) through (10) above. |
2-15 |
      (b) The invitation for bids shall state whether the award shall be made on the basis of the |
2-16 |
lowest bid price or the lowest evaluated or responsive bid price. If the latter basis is used, the |
2-17 |
objective measurable criteria to be utilized shall be set forth in the invitation for bids, if available. |
2-18 |
All documents submitted in response to the bid proposal are public pursuant to chapter 38-2 upon |
2-19 |
opening of the bids. The invitation for bids shall state that each bidder must submit a copy of their |
2-20 |
bid proposal to be available for public inspection upon the opening of the bids. The burden to |
2-21 |
identify and withhold from the public copy that is released at the bid opening any trade secrets, |
2-22 |
commercial or financial information, or other information the bidder deems not subject to public |
2-23 |
disclosure pursuant to chapter 38-2, the Access to Public Records Act, shall rest with the bidder |
2-24 |
submitting the bid proposal. |
2-25 |
      (c) Unless the invitations for bid are accessible under the provisions as provided in |
2-26 |
section 37-2-17.1, public notice of the invitation for bids shall be given a sufficient time prior to |
2-27 |
the date set forth therein for the opening of bids. Public notice may include publication in a |
2-28 |
newspaper of general circulation in the state as determined by the purchasing agent not less than |
2-29 |
seven (7) days nor more than twenty-eight (28) days before the date set for the opening of the |
2-30 |
bids. The purchasing agent may make a written determination that the twenty-eight (28) day |
2-31 |
limitation needs to be waived. The written determination shall state the reason why the twenty- |
2-32 |
eight (28) day limitation is being waived and shall state the number of days, giving a minimum |
2-33 |
and maximum, before the date set for the opening of bids when public notice is to be given. |
3-34 |
      (d) Bids shall be opened and read aloud publicly at the time and place designated in the |
3-35 |
invitation for bids. Each bid, together with the name of the bidder, shall be recorded and an |
3-36 |
abstract made available for public inspection. |
3-37 |
      (e) The chief purchasing officer shall adopt and file regulations governing the bidding of |
3-38 |
highway and bridge construction projects in the state not later than December 31, 2011. |
3-39 |
      (f) Immediately subsequent to the opening of the bids, the copies of bid documents |
3-40 |
submitted pursuant to subsection 37-2-18(b) shall be made available for inspection by the public. |
3-41 |
Any objection to any bid on the grounds that it is nonresponsive to the invitation for bids must be |
3-42 |
filed with the purchasing agent within five (5) business days of the opening of the bids. The |
3-43 |
purchasing agent shall issue a written determination as to whether the subject bid is |
3-44 |
nonresponsive addressing each assertion in the objection and shall provide a copy of the |
3-45 |
determination to the objector and all those who submitted bids at least seven (7) business days |
3-46 |
prior to the award of the contract. If a bid is nonresponsive to the requirements in the invitation to |
3-47 |
bid, the bid is invalid and the purchasing agent shall reject the bid. The purchasing agent shall |
3-48 |
have no discretion to waive any requirements in the invitation to bid which are identified as |
3-49 |
mandatory. Nothing in this section shall be construed to interfere with or invalidate the results of |
3-50 |
the due diligence conducted by the division of purchasing to determine whether bids are |
3-51 |
responsive and responsible. |
3-52 |
      (g) Subsequent to the awarding of the bid, all documents pertinent to the awarding of the |
3-53 |
bid that were not made public pursuant to subsection 37-2-18(e) shall be made available and open |
3-54 |
to public inspection, pursuant to chapter 38-2, the Access to Public Records Act, and retained in |
3-55 |
the bid file. The copy of the bid proposal provided pursuant to subsection 37-2-18(b) shall be |
3-56 |
retained until the bid is awarded. |
3-57 |
      (h) The contract shall be awarded with reasonable promptness by written notice to the |
3-58 |
responsive and responsible bidder whose bid is either the lowest bid price, lowest evaluated, or |
3-59 |
responsive bid price. |
3-60 |
      (i) Correction or withdrawal of bids may be allowed only to the extent permitted by |
3-61 |
regulations issued by the chief purchasing officer. |
3-62 |
      (j) As of January 1, 2011, this section shall apply to contracts greater than one million |
3-63 |
dollars ($1,000,000); on January 1, 2012 for all contracts greater than seven hundred fifty |
3-64 |
thousand dollars ($750,000); on January 1, 2013 for all contracts greater than five hundred |
3-65 |
thousand dollars ($500,000); and on January 1, 2014 for all contracts awarded pursuant to this |
3-66 |
section. |
3-67 |
     37-2-27.1. Procurement of construction manager at-risk services -- Written |
3-68 |
determination. -- (a) Prior to procuring construction manager at-risk services the chief |
4-1 |
purchasing officer must sign a written determination documenting the following: |
4-2 |
      (1) That in accordance with the factors set forth in subsection |
4-3 |
general contractor selected as the lowest responsive bidder based on a lump-sum, fixed fee |
4-4 |
contract is not practicable for the construction of the project |
4-5 |
value for the state; |
4-6 |
      (2) That the using agency has clearly identified in writing why the use of construction |
4-7 |
management at-risk services is appropriate for the building project; |
4-8 |
      (3) That the building project has an estimated construction value of five million dollars |
4-9 |
($5,000,000) or more; |
4-10 |
      (4) That the using agency has in place written procedures to ensure fairness in |
4-11 |
competition, evaluation and reporting of results at every stage in the procurement process; |
4-12 |
      (5) That the using agency has the capacity, a detailed plan and procedures in place to |
4-13 |
effectively procure and manage construction management at-risk services for the specific project |
4-14 |
and has procured the services of a qualified owner's program manager pursuant to chapter 37-2; |
4-15 |
and |
4-16 |
      (6) That the using agency has a detailed, written plan with clearly identified procedures |
4-17 |
to monitor and approve all reimbursable costs. |
4-18 |
      The chief purchasing officer shall file copies of the written determination with the |
4-19 |
president of the senate, the speaker of the house, the senate fiscal advisor and the house fiscal |
4-20 |
advisor no later than three (3) business days after executing the written determination. |
4-21 |
      (b) Notwithstanding any other provision to the contrary, including any provision |
4-22 |
exempting any entity from the requirements of this chapter, the chief executive officer of a public |
4-23 |
corporation as defined in subdivision 35-20-5(4) or the chief executive officer of a quasi-public |
4-24 |
agency, prior to procuring construction manager at-risk services shall sign a written determination |
4-25 |
documenting the following: |
4-26 |
      (1) That in accordance with the factors set forth in subsection |
4-27 |
general contractor selected as the lowest responsive bidder based on a lump-sum, fixed fee |
4-28 |
contract is not practicable for the construction of the project |
4-29 |
value for the state; |
4-30 |
      (2) Why the use of construction management at-risk services is appropriate for the |
4-31 |
building project; |
4-32 |
      (3) That the building project has an estimated construction value of five million dollars |
4-33 |
($5,000,000) or more; |
5-34 |
      (4) That there is in place written procedures to ensure fairness in competition, evaluation |
5-35 |
and reporting of results at every stage in the procurement process; |
5-36 |
      (5) That the corporation or quasi-public agency has the capacity, a detailed plan, and |
5-37 |
procedures in place to effectively procure and manage construction management at-risk services |
5-38 |
for the specific project and has procured the services of a qualified owner's program manager, as |
5-39 |
set forth in subdivision 37-2-7(32); and |
5-40 |
      (6) That there is a detailed, written plan with clearly identified procedures to monitor and |
5-41 |
approve all reimbursable costs. |
5-42 |
      The chief executive officer shall file copies of the written determination with the |
5-43 |
president of the senate, the speaker of the house, the senate fiscal advisor, and the house fiscal |
5-44 |
advisor no later than three (3) business days after executing the written determination. |
5-45 |
     37-2-39. Responsibility for selection of methods of construction contracting |
5-46 |
management. -- The chief purchasing officer shall issue regulations providing for as many |
5-47 |
alternative methods of management of construction contracting as he or she may determine to be |
5-48 |
feasible, setting forth |
5-49 |
construction is to be used for a particular project, and granting to the purchasing agent, or the |
5-50 |
purchasing agency responsible for carrying out the construction project, the discretion to select |
5-51 |
the appropriate method of construction contracting for a particular project, provided, however, |
5-52 |
that the chief purchasing officer shall execute and include in the contract file a written statement |
5-53 |
setting forth the facts which led to the selection of a particular method of management of |
5-54 |
construction contracting in each instance. |
5-55 |
     SECTION 2. This act shall take effect upon passage. |
      | |
======= | |
LC02308 | |
======= | |
EXPLANATION | |
BY THE LEGISLATIVE COUNCIL | |
OF | |
A N A C T | |
RELATING TO PUBLIC PROPERTY AND WORKS | |
*** | |
6-1 |
     This act would make changes to the law permitting the state to enter into non-competitive |
6-2 |
bid construction and demolition contracts under some circumstances. |
6-3 |
     This act would take effect upon passage. |
      | |
======= | |
LC02308 | |
======= |