2015 -- H 5199

========

LC000493

========

     STATE OF RHODE ISLAND

IN GENERAL ASSEMBLY

JANUARY SESSION, A.D. 2015

____________

A N   A C T

RELATING TO PUBLIC UTILITIES AND CARRIERS - THE RENEWABLE ENERGY

GROWTH PROGRAM

     

     Introduced By: Representatives Ruggiero, Blazejewski, Handy, Marshall, and Canario

     Date Introduced: January 21, 2015

     Referred To: House Environment and Natural Resources

     It is enacted by the General Assembly as follows:

1

     SECTION 1. Section 39-26.6-24 of the General Laws in Chapter 39-26.6 entitled "The

2

Renewable Energy Growth Program" is hereby amended to read as follows:

3

     39-26.6-24. Rate design review by the commission. -- (a) On or after July 1, 2015, the

4

commission shall open a docket to consider rate design and distribution cost allocation among

5

rate classes in light of net metering and the changing distribution system that is expected to

6

include more distributed-energy resources, including, but not limited to, distributed generation.

7

The commission will determine the appropriate cost responsibility and contributions to the

8

operation, maintenance, and investment in the distribution system that is relied upon by all

9

customers, including, without limitation, non-net metered and net-metered customers. In that

10

docket, the commission shall require the electric-distribution company to file a revenue-neutral

11

allocated cost of service study for all rate classes and a proposal for new rates for all customers in

12

each rate class. The electric-distribution company shall use the distribution revenue requirement

13

upon which the then-current distribution rates were set. The electric-distribution company may

14

use the allocated cost of service that was filed with the compliance filing from the rate case when

15

the then-current distribution rates were set. The commission may also address the rate design for

16

the equitable recovery of costs associated with energy efficiency and any renewable-energy

17

programs that are recovered in rates.

18

      (b) In establishing any new rates the commission may deem appropriate, the commission

 

1

shall take into account and balance the following factors:

2

      (1) The benefits of distributed-energy resources;

3

      (2) The distribution services being provided to net-metered customers when the

4

distributed generation is not producing electricity;

5

      (3) Simplicity, understandability, and transparency of rates to all customers, including

6

non-net metered and net-metered customers;

7

      (4) Equitable ratemaking principles regarding the allocation of the costs of the

8

distribution system;

9

      (5) Cost causation principles;

10

      (6) The general assembly's legislative purposes in creating the distributed-generation

11

growth program; and

12

      (7) Any other factors the commission deems relevant and appropriate in establishing a

13

fair rate structure. The rates shall be designed for each proposed rate class in accordance with

14

industry-standard, cost; allocation principles. The commission may consider any reasonable rate

15

design options, including without limitation, fixed charges, minimum-monthly charges, demand

16

charges, volumetric charges, or any combination thereof, with the purpose of assuring recovery of

17

costs fairly across all rate classes.

18

      (c) The commission shall issue an order in the docket by no later than December 1, 2015

19

March 1, 2016. Any new rates shall take effect for usage on and after January 1, 2016 April 1,

20

2016; provided, however, that the electric-distribution company may seek an extension if

21

necessary to make the billing system changes necessary to implement a new rate structure. After

22

new, revenue-neutral rates are set in the docket specified above, the commission may approve

23

changes to the rate design in any future distribution-base rate cases when a fully allocated

24

embedded cost of service study is being reviewed in the rate case, subject to the principles set

25

forth in subsection (b) of this section.

26

     SECTION 2. This act shall take effect upon passage.

========

LC000493

========

 

LC000493 - Page 2 of 3

EXPLANATION

BY THE LEGISLATIVE COUNCIL

OF

A N   A C T

RELATING TO PUBLIC UTILITIES AND CARRIERS - THE RENEWABLE ENERGY

GROWTH PROGRAM

***

1

     This act would make changes in the timetable for public utilities commission review of

2

electricity distribution rates under the Renewable Energy Growth Program.

3

     This act would take effect upon passage.

========

LC000493

========

 

LC000493 - Page 3 of 3