2015 -- H 5199 | |
======== | |
LC000493 | |
======== | |
STATE OF RHODE ISLAND | |
IN GENERAL ASSEMBLY | |
JANUARY SESSION, A.D. 2015 | |
____________ | |
A N A C T | |
RELATING TO PUBLIC UTILITIES AND CARRIERS - THE RENEWABLE ENERGY | |
GROWTH PROGRAM | |
| |
Introduced By: Representatives Ruggiero, Blazejewski, Handy, Marshall, and Canario | |
Date Introduced: January 21, 2015 | |
Referred To: House Environment and Natural Resources | |
It is enacted by the General Assembly as follows: | |
1 | SECTION 1. Section 39-26.6-24 of the General Laws in Chapter 39-26.6 entitled "The |
2 | Renewable Energy Growth Program" is hereby amended to read as follows: |
3 | 39-26.6-24. Rate design review by the commission. -- (a) On or after July 1, 2015, the |
4 | commission shall open a docket to consider rate design and distribution cost allocation among |
5 | rate classes in light of net metering and the changing distribution system that is expected to |
6 | include more distributed-energy resources, including, but not limited to, distributed generation. |
7 | The commission will determine the appropriate cost responsibility and contributions to the |
8 | operation, maintenance, and investment in the distribution system that is relied upon by all |
9 | customers, including, without limitation, non-net metered and net-metered customers. In that |
10 | docket, the commission shall require the electric-distribution company to file a revenue-neutral |
11 | allocated cost of service study for all rate classes and a proposal for new rates for all customers in |
12 | each rate class. The electric-distribution company shall use the distribution revenue requirement |
13 | upon which the then-current distribution rates were set. The electric-distribution company may |
14 | use the allocated cost of service that was filed with the compliance filing from the rate case when |
15 | the then-current distribution rates were set. The commission may also address the rate design for |
16 | the equitable recovery of costs associated with energy efficiency and any renewable-energy |
17 | programs that are recovered in rates. |
18 | (b) In establishing any new rates the commission may deem appropriate, the commission |
| |
1 | shall take into account and balance the following factors: |
2 | (1) The benefits of distributed-energy resources; |
3 | (2) The distribution services being provided to net-metered customers when the |
4 | distributed generation is not producing electricity; |
5 | (3) Simplicity, understandability, and transparency of rates to all customers, including |
6 | non-net metered and net-metered customers; |
7 | (4) Equitable ratemaking principles regarding the allocation of the costs of the |
8 | distribution system; |
9 | (5) Cost causation principles; |
10 | (6) The general assembly's legislative purposes in creating the distributed-generation |
11 | growth program; and |
12 | (7) Any other factors the commission deems relevant and appropriate in establishing a |
13 | fair rate structure. The rates shall be designed for each proposed rate class in accordance with |
14 | industry-standard, cost; allocation principles. The commission may consider any reasonable rate |
15 | design options, including without limitation, fixed charges, minimum-monthly charges, demand |
16 | charges, volumetric charges, or any combination thereof, with the purpose of assuring recovery of |
17 | costs fairly across all rate classes. |
18 | (c) The commission shall issue an order in the docket by no later than December 1, 2015 |
19 | March 1, 2016. Any new rates shall take effect for usage on and after January 1, 2016 April 1, |
20 | 2016; provided, however, that the electric-distribution company may seek an extension if |
21 | necessary to make the billing system changes necessary to implement a new rate structure. After |
22 | new, revenue-neutral rates are set in the docket specified above, the commission may approve |
23 | changes to the rate design in any future distribution-base rate cases when a fully allocated |
24 | embedded cost of service study is being reviewed in the rate case, subject to the principles set |
25 | forth in subsection (b) of this section. |
26 | SECTION 2. This act shall take effect upon passage. |
======== | |
LC000493 | |
======== | |
| LC000493 - Page 2 of 3 |
EXPLANATION | |
BY THE LEGISLATIVE COUNCIL | |
OF | |
A N A C T | |
RELATING TO PUBLIC UTILITIES AND CARRIERS - THE RENEWABLE ENERGY | |
GROWTH PROGRAM | |
*** | |
1 | This act would make changes in the timetable for public utilities commission review of |
2 | electricity distribution rates under the Renewable Energy Growth Program. |
3 | This act would take effect upon passage. |
======== | |
LC000493 | |
======== | |
| LC000493 - Page 3 of 3 |