2017 -- H 5274 SUBSTITUTE A | |
======== | |
LC000857/SUB A | |
======== | |
STATE OF RHODE ISLAND | |
IN GENERAL ASSEMBLY | |
JANUARY SESSION, A.D. 2017 | |
____________ | |
A N A C T | |
RELATING TO PUBLIC UTILITIES AND CARRIERS -- RENEWABLE ENERGY GROWTH | |
PROGRAM | |
| |
Introduced By: Representatives Ruggiero, Handy, Regunberg, Tanzi, and O`Grady | |
Date Introduced: January 27, 2017 | |
Referred To: House Environment and Natural Resources | |
It is enacted by the General Assembly as follows: | |
1 | SECTION 1. Section 39-26.6-12 of the General Laws in Chapter 39-26.6 entitled "The |
2 | Renewable Energy Growth Program" is hereby amended to read as follows: |
3 | 39-26.6-12. Annual bidding and enrollments. |
4 | (a) With the exception of the first program year (2015), the electric-distribution company, |
5 | in consultation with the board and office, shall conduct at least three (3) tariff enrollments for |
6 | each distributed-generation class each program year. For the first program year, the board may |
7 | recommend that either two (2) or three (3) enrollments be conducted. |
8 | (b) During each program year, the tariff enrollments shall have both an annual targeted |
9 | amount of nameplate megawatts ("annual MW target") and a nameplate megawatt target for each |
10 | separate enrollment event ("enrollment MW target"). The enrollment MW target shall comprise |
11 | the specific portion of the annual MW target sought to be obtained in that enrollment. The |
12 | enrollment MW targets shall be recommended by the board each year, subject to commission |
13 | approval. The board shall also recommend a megawatt target for each class ("class MW target") |
14 | that comprises a specified portion of the enrollment MW target, subject to commission approval. |
15 | If the electric-distribution company, the office, and the board mutually agree, they may reallocate |
16 | megawatts during an enrollment from one class to another without commission approval if there |
17 | is an over-subscription in one class and an under-subscription in another, provided that the annual |
18 | MW Target is not being exceeded, except as provided in § 39-26.6-7. |
| |
1 | (c) The annual MW targets shall be established as follows; provided, however that at |
2 | least three megawatts (3 MW) of nameplate capacity shall be carved out exclusively for small- |
3 | scale solar projects in each of the first four (4) program years: |
4 | (1) For the first program year (2015), the annual MW target shall be twenty-five (25) |
5 | nameplate megawatts; |
6 | (2) For the second program year, the annual targets shall be forty (40) nameplate |
7 | megawatts; |
8 | (3) For the third and fourth program years, the annual target shall be forty (40) nameplate |
9 | megawatts, subject to the conditions set forth in § 39-26.6-12(f) having been met for the |
10 | applicable prior program year as determined in the manner specified in § 39-26.6-12(g); and |
11 | (4) For the fifth program year, the annual target shall be set to obtain the balance of |
12 | capacity needed to achieve one hundred sixty (160) nameplate megawatts within the five-year (5) |
13 | distributed-generation growth program, subject to § 39-26.6-12(e) and the conditions set forth in |
14 | § 39-26.6-12(f) having been met for the fourth program year as determined in the manner |
15 | specified in § 39-26.6-12(g).; and |
16 | (5) From the year 2020 through the year 2029, the annual target for each program year |
17 | shall be an additional forty (40) nameplate megawatts above the annual target for the preceding |
18 | program year. |
19 | (d) During the fifth year of the distributed-generation growth program, the board may |
20 | recommend to the commission an extension of time in the event that additional time is required to |
21 | achieve the full one hundred sixty (160) nameplate megawatt target of the program. The |
22 | commission shall approve the recommendation of the board; provided, however, that the |
23 | commission may make any modifications to the board's recommendation that the commission |
24 | deems appropriate, consistent with the legislative purposes of this chapter as set forth herein. |
25 | (e) To the extent there was a shortfall of capacity procured under chapter 26.2 of title 39 |
26 | from distributed generation procurements in 2014, such shortfall amount may be added to the one |
27 | hundred sixty megawatt (160MW) target for acquisition in the fifth program year under this |
28 | chapter. In no event shall the electric distribution company be required to exceed the aggregate |
29 | amount of one hundred sixty (160) nameplate capacity plus any such shortfall amount over the |
30 | five (5) years, but may do so voluntarily, in consultation with the board and subject to |
31 | commission approval. |
32 | (f) The conditions specified in subsections (c)(3) and (c)(4) of this section are as follows: |
33 | (1) That it is reasonable to conclude that the bid prices submitted in the procurements for the |
34 | large-scale solar and commercial-scale solar classes were reasonably competitive in the |
| LC000857/SUB A - Page 2 of 6 |
1 | immediately preceding program year; (2) That it is reasonable to conclude that the annual MW |
2 | target specified for the next program year is reasonably achievable; and (3) That the electric- |
3 | distribution company was able to, or with reasonably prudent efforts should have been able to, |
4 | perform the studies and system upgrades on a timely basis necessary to accommodate the number |
5 | of applications associated with the targets without materially adversely affecting other electric- |
6 | distribution construction projects needed to provide reliable and safe electric-distribution service. |
7 | To the extent the board or the commission concludes that any of these conditions have not been |
8 | met for the applicable program year, the board may recommend, and/or the commission may |
9 | adopt, a new annual MW target, based on the factors set forth in section 39-26.6-12(h). |
10 | (g) Before the third, fourth, and fifth program years, each year the board shall review the |
11 | conditions specified in § 39-26.6-12(f) and make a recommendation to the commission for |
12 | findings as to whether they have been met for the applicable year. The recommendation shall be |
13 | filed with the commission, with copies to the office and the electric distribution company, and |
14 | any person who has made a written request to the commission to be included in such notification, |
15 | such list which may be obtained from the commission clerk, and a notice of such filing shall be |
16 | posted by the commission on its website. If no party files an objection to the recommended |
17 | findings within ten (10) business days of the posting, the commission may accept them without |
18 | hearings. If an objection is filed with a reasonable explanation for its basis, the commission shall |
19 | hold hearings and make the factual determination of whether the conditions have been met. |
20 | (h) In the event that the conditions in § 39-26.6-12(f) have not been met for any program |
21 | year, then the board and the commission shall take into account the factors set forth below in |
22 | setting the annual MW target for the following year. In addition, for every program year the board |
23 | and the commission shall take into account these factors in setting the class MW targets, and the |
24 | enrollment MW targets for the following year: (1) That the new annual, class, and enrollment |
25 | levels reasonably assure that competition among projects for the applicable bidding |
26 | classifications remains robust and likely to yield reasonable and competitive program costs; (2) |
27 | That, assuming prudent management of the program, the electric-distribution company should be |
28 | able to perform the studies and system upgrades on a timely basis necessary to accommodate the |
29 | number of applications associated with the targets without materially adversely affecting other |
30 | electric-distribution construction projects needed to provide reliable and safe electric-distribution |
31 | service; and (3) Any other reasonable factors that are consistent with the legislative purpose of |
32 | this chapter as set forth herein, including the program purpose to facilitate the development of |
33 | renewable distributed generation in the load zone of the electric-distribution company at |
34 | reasonable cost. |
| LC000857/SUB A - Page 3 of 6 |
1 | (i) The renewable energy growth program is intended to achieve at least an aggregate |
2 | amount of one hundred sixty (160) nameplate megawatts over five (5) years, plus any shortfall |
3 | amount added in pursuant to § 39-26.6-12(e). However, after the second program year, the board |
4 | may, based on market data and other information available to it, including pricing received during |
5 | previous program years, recommend changes to the annual target for any program year above or |
6 | below the specified targets in § 39-26.6-12(c) if the board concludes that market conditions are |
7 | likely to produce favorably low or unfavorably high target pricing during the upcoming program |
8 | year, provided that the recommendation may not result in the five-year (5) one hundred sixty |
9 | megawatt (160MW) nameplate target, plus any shortfall added pursuant to § 39-26.6-12(e), being |
10 | exceeded. Any megawatt reduction in an annual target shall be added to the target in the fifth year |
11 | of the program (and any subsequent years if necessary) such that the overall program target of |
12 | one hundred sixty megawatt (160MW) nameplate capacity, plus any shortfall added pursuant to § |
13 | 39-26.6-12(e), is achieved. In considering such issues, the board and the commission may take |
14 | into account the reasonableness of current pricing and its impact on all electric distribution |
15 | customers and the legislative purpose of this chapter as set forth herein, including the program |
16 | purpose to facilitate the development of renewable distributed generation in the load zone of the |
17 | electric-distribution company at reasonable cost. |
18 | (j) The provisions of § 39-26.1-4 shall apply to the annual value of performance-based |
19 | incentives (actual payments plus the value of net-metering credits, as applicable) provided by the |
20 | electric-distribution company to all the distributed-generation projects under this chapter, subject |
21 | to the following conditions: |
22 | (1) The targets set for the applicable program year for the applicable project |
23 | classifications were met or, if not met, such failure was due to factors beyond the reasonable |
24 | control of the electric-distribution company; |
25 | (2) The electric-distribution company has processed applications for service and |
26 | completed interconnections in a timely and prudent manner for the projects under this chapter, |
27 | taking into account factors within the electric-distribution company's reasonable control. The |
28 | commission is authorized to establish more specific performance standards to implement the |
29 | provisions of this chapter; and |
30 | (3) The incentive shall be one and three-quarters percent (1.75%) of the annual value of |
31 | performance-based incentives. The commission is authorized to establish more specific |
32 | performance standards to implement the provisions of this paragraph. |
| LC000857/SUB A - Page 4 of 6 |
1 | SECTION 2. This act shall take effect upon passage. |
======== | |
LC000857/SUB A | |
======== | |
| LC000857/SUB A - Page 5 of 6 |
EXPLANATION | |
BY THE LEGISLATIVE COUNCIL | |
OF | |
A N A C T | |
RELATING TO PUBLIC UTILITIES AND CARRIERS -- RENEWABLE ENERGY GROWTH | |
PROGRAM | |
*** | |
1 | This act would expand the renewable energy growth program so that from 2020 through |
2 | 2029 there will be an annual target of forty (40) nameplate megawatts above the prior program |
3 | year's annual target. |
4 | This act would take effect upon passage. |
======== | |
LC000857/SUB A | |
======== | |
| LC000857/SUB A - Page 6 of 6 |