2017 -- S 0769 | |
======== | |
LC002145 | |
======== | |
STATE OF RHODE ISLAND | |
IN GENERAL ASSEMBLY | |
JANUARY SESSION, A.D. 2017 | |
____________ | |
A N A C T | |
RELATING TO STATE AFFAIRS AND GOVERNMENT -- ENERGY FACILITY SITING | |
ACT | |
| |
Introduced By: Senator P Fogarty | |
Date Introduced: April 12, 2017 | |
Referred To: Senate Judiciary | |
It is enacted by the General Assembly as follows: | |
1 | SECTION 1. Sections 42-98-1, 42-98-2, 42-98-3, 42-98-5, 42-98-6, 42-98-7, 42-98-8, |
2 | 42-98-9, 42-98-9.1, 42-98-10, 42-98-11, 42-98-12, 42-98-16, 42-98-17 and 42-98-20 of the |
3 | General Laws in Chapter 42-98 entitled "Energy Facility Siting Act" are hereby amended to read |
4 | as follows: |
5 | 42-98-1. Legislative findings. |
6 | (a) The general assembly recognizes that reasonably priced, reliable sources of energy are |
7 | vital to the well-being and prosperity of the people of this state; that there are major issues of |
8 | public health and safety and impact upon the environment related to the technologies and energy |
9 | sources used in some facilities; that some energy facilities require a major commitment of funds |
10 | and resources and require many years to build that the decision to permit or deny their |
11 | construction will have long term impact on the economy of the state; that these decisions will |
12 | affect the availability and cost of the energy; and that the evaluation of proposals must recognize |
13 | and consider the need for these facilities in relation to the overall impact of the facilities upon |
14 | public health and safety, the environment and the economy of the state; |
15 | (b) The general assembly further finds that the authority to regulate many aspects of the |
16 | issues involved in the siting of major energy facilities currently exists in a variety of agencies |
17 | within the government of the state and the political subdivisions of the state; that there is |
18 | overlapping jurisdiction among several state agencies in the siting of energy facilities; and that |
| |
1 | there is the potential for conflicting decisions being issued by the various agencies having |
2 | authority over the different aspects of the siting of a major energy facility; |
3 | (c) The jurisdiction of each state agency should be defined, and the role of each agency in |
4 | energy siting should be delineated, to eliminate overlap and duplication and to insure that |
5 | expeditious decisions are made within a time frame to be determined by law; and that in addition |
6 | to the existing regulation, statewide and regional planning for energy resources and the |
7 | assessment of our state's need for energy should be on-going activities within Rhode Island; |
8 | (d) The general assembly recognizes that each host community for any proposed or |
9 | existing energy facility is uniquely affected by the energy facility siting process; |
10 | (d)(e) There is need for a coordinated decision on any major energy facility; the technical |
11 | expertise for this evaluation is available within existing agencies involved with the siting process; |
12 | and |
13 | (e)(f) There is a need for coordinating and expediting the review of each state agency and |
14 | that the authority and responsibility to perform that function should be established. |
15 | 42-98-2. Declaration of policy. |
16 | It shall be the policy of this state to assure that: |
17 | (1) The facilities required to meet the energy needs of this and succeeding generations of |
18 | Rhode Islanders are planned for, considered, and built in a timely and orderly fashion; |
19 | (2) Construction, operation, and/or alteration of major energy facilities shall only be |
20 | undertaken when those actions are justified by long term state and/or regional energy need |
21 | forecasts; |
22 | (3) The energy shall be produced at the least possible cost to the consumer consistent |
23 | with the objective of ensuring that the construction, operation, and decommissioning of the |
24 | facility shall produce the fewest possible adverse effects on the quality of the state's environment; |
25 | most particularly, its land and its wildlife and resources, the health and safety of its citizens, the |
26 | purity of its air and water, its aquatic and marine life, and its esthetic and recreational value to the |
27 | public; |
28 | (4) The licensure and regulatory authority of the state be consolidated in a single body, |
29 | which will render the final licensing decision concerning the siting, construction, operation and/or |
30 | alteration of major energy facilities; |
31 | (5) An energy facility planning process shall be created through which the statewide |
32 | planning program, in conjunction with the division of public utilities and carriers, will be |
33 | empowered to undertake evaluations and projections of long and short term energy needs, and |
34 | any other matters that are necessary to establish the state energy plans, goals, and policies. The |
| LC002145 - Page 2 of 17 |
1 | state planning council shall be authorized and empowered to adopt a long term plan assessing the |
2 | state's future energy needs and the best strategy for meeting them, as part of the state guide plan |
3 | by January 1, 1991. |
4 | (6) The construction, operation and/or alteration of major energy facilities shall be |
5 | consistent with the state's established energy plans, goals, and policy. |
6 | (7) Before approving the construction, operation and/or alteration of major energy |
7 | facilities, the board shall determine whether cost effective efficiency and conservation |
8 | opportunities provide an appropriate alternative to the proposed facility. |
9 | (8) The energy facilities siting board shall give priority to energy generation projects |
10 | based on the degree to which such projects meet, criteria including, but not limited to: |
11 | (i) Using renewable fuels, natural gas, or coal processed by "clean coal technology" as |
12 | their primary fuel; |
13 | (ii) Maximizing efficiency; |
14 | (iii) Using low levels of high quality water; |
15 | (iv) Using existing energy-generation facilities and sites; |
16 | (v) Producing low levels of potentially harmful air emissions; |
17 | (vi) Producing low levels of wastewater discharge; |
18 | (vii) Producing low levels of waste into the solid waste stream; and |
19 | (viii) Having dual fuel capacity. |
20 | The board shall, within its rules and regulations, provide guidelines and definitions of |
21 | appropriate standards for the criteria designated in this subsection by January 1, 1991. |
22 | 42-98-3. Definitions. |
23 | (a) "Agency" means any agency, council, board, or commission of the state or political |
24 | subdivision of the state. |
25 | (b) "Alteration" means a significant modification to a major energy facility, which, as |
26 | determined by the board, will result in a significant impact on the environment, or the public |
27 | health, safety, and welfare. Conversion from one type of fuel to another shall not be considered to |
28 | be an "alteration." |
29 | (c) "Board" for purposes of this chapter refers to the siting board. |
30 | (d) "Major energy facility" means facilities for the extraction, production, conversion, |
31 | and processing of coal; facilities for the generation of electricity designed or capable of operating |
32 | at a gross capacity of forty (40) megawatts or more; transmission lines of sixty-nine (69) Kv or |
33 | over; facilities for the conversion, gasification, treatment, transfer, or storage of liquified natural |
34 | and liquified petroleum gases; facilities for the processing, enrichment, storage, or disposal of |
| LC002145 - Page 3 of 17 |
1 | nuclear fuels or nuclear byproducts; facilities for the refining of oil, gas, or other petroleum |
2 | products; facilities of ten (10) megawatts or greater capacity for the generation of electricity by |
3 | water power, and facilities associated with the transfer of oil, gas, and coal via pipeline; any |
4 | energy facility project of the Rhode Island economic development corporation; the board may |
5 | promulgate regulations to further define "major energy facility" to the extent further definition is |
6 | required to carry out the purpose of this chapter, provided that any waste to energy facility shall |
7 | not be deemed a major energy facility for the purposes of this chapter. |
8 | (e) "Clean coal technology" means one of the technologies developed in the clean coal |
9 | technology program of the United States Department of Energy, and shown to produce emissions |
10 | levels substantially equal to those of natural gas fired power plants. |
11 | (f) "Host community" means any city or town in the state in which all or a portion of a |
12 | proposed or existing energy facility shall be or is located. |
13 | 42-98-5. Board established. |
14 | (a) There is established the siting board which shall be a part of state government. The |
15 | When the board sits for any purpose related to a proposed or existing facility, the siting board |
16 | shall consist of three (3) five (5) members, as follows: the chairperson of the public utilities |
17 | commission, who shall serve as chairperson of the siting board; the director of the department of |
18 | environmental management; and the associate director of administration for planning; and two (2) |
19 | members designated by the council of the host community. If there is more than one host |
20 | community, the council of the two (2) most affected communities shall each designate one |
21 | member. Any member of the board who recuses him or herself or is otherwise unable to fulfill |
22 | their obligations shall designate his or her own successor from his or her respective agency or in |
23 | the case of members designated by a town council, a successor shall be appointed in like manner. |
24 | (b) Each member of the board shall take an oath to administer the duties of office |
25 | faithfully and impartially and that oath shall be filed in the office of the secretary of state. |
26 | (c) The members of the board who serve in their capacity as an employee of the state or |
27 | quasi-state agency or municipality shall serve without compensation. , but Members of the board |
28 | who are not employees of the state or municipality shall receive reasonable compensation for |
29 | their services, as determined by the board chairperson. All members of the board shall be |
30 | reimbursed for their actual expenses necessarily incurred in the performance of their duties. Such |
31 | compensation and expense reimbursement shall be paid monthly by the applicant. The board may |
32 | engage, at the applicant's expense, any consultants or expert witnesses that it deems necessary to |
33 | implement its statutory responsibilities; provided, however, that to the maximum extent possible, |
34 | board staff be drawn from existing state agencies. The board shall select a coordinator to be |
| LC002145 - Page 4 of 17 |
1 | responsible for the publication and distribution of all official minutes, reports, and documents and |
2 | to further serve as director of the board staff, which shall be located at the division of public |
3 | utilities and common carriers. The coordinator, under the direction of the chairperson, shall |
4 | coordinate and expedite the work of the various agencies to ensure that decisions are made within |
5 | the time frame established by this chapter. |
6 | (d) A quorum shall consist of a majority of the board. A quorum is required to conduct |
7 | any meeting of the board held for the purpose of consideration and voting upon an adjudicatory |
8 | decision, a proposal to adopt, amend, or rescind regulations, or any other matter requiring a vote |
9 | of the board. A majority vote of the board shall be required for all actions, including licensing |
10 | decisions. ; provided, however However, one member of the board may conduct any hearings the |
11 | board is authorized to conduct pursuant to this chapter. |
12 | (e) The board shall maintain and grant free access to records and reports in its files to |
13 | members of the public during normal working hours and shall permit copies of those records and |
14 | reports to be made by interested members of the public at their expense; provided, however, that |
15 | the board shall not permit disclosure, other than to another government agency for the sole |
16 | purpose of rendering an advisory opinion, of any information obtained by or submitted to the |
17 | board pursuant to the provisions of this chapter, upon a showing, satisfactory to the board, that |
18 | the information is entitled to protection as trade secrets or as privileged, confidential, or |
19 | proprietary information. No other governmental agency shall disclose any trade secrets or |
20 | privileged, confidential, or proprietary information. |
21 | (f) Time periods within this chapter are directory, not mandatory. For good cause shown, |
22 | the board may, at its discretion, extend any and all time periods herein. |
23 | 42-98-6. Holding over in office. |
24 | When the term of office of a member of the siting board expires or otherwise terminates, |
25 | and that person has participated in hearing all or a substantial part of the evidence in a proceeding |
26 | before the board, that person shall remain a member of the siting board for the sole purpose of |
27 | completing the hearing and deciding the matter pending and signing the findings, orders, and |
28 | judgments in the proceeding. For these services, the person shall be paid reasonable |
29 | compensation and necessary expenses as fixed by the siting board as composed following the |
30 | expiration of that person's term of office. For this purpose, a proceeding shall be deemed |
31 | completed when the siting board enters its final decision therein regardless of whether that |
32 | decision is or may be appealed to the supreme court and the case remanded to the siting board for |
33 | further proceedings. |
34 | 42-98-7. Powers and duties. |
| LC002145 - Page 5 of 17 |
1 | (a) (1) The siting board is the licensing and permitting authority for all licenses, permits, |
2 | assents, or variances which, under any statute of the state or ordinance of any political |
3 | subdivision of the state, would be required for siting, construction or alteration of a major energy |
4 | facility in the state. |
5 | (2) Any agency, board, council, or commission of the state or political subdivision of the |
6 | state which, absent this chapter, would be required to issue a permit, license, assent, or variance |
7 | in order for the siting, construction, or alteration of a major energy facility to proceed, shall sit |
8 | and function at the direction of the siting board. These agencies shall follow the procedures |
9 | established by statute, ordinance, and/or regulation provided for determining the permit, license, |
10 | assent, or variance, but, instead of issuing the permit, license, assent, or variance, shall forward its |
11 | findings from the proceeding, together with the record supporting the findings and a |
12 | recommendation for final action, to the siting board. |
13 | (3) Notwithstanding any provision in this chapter to the contrary, in those instances in |
14 | which the department of environmental management exercises a permitting or licensing function |
15 | under the delegated authority of federal law, including, but not limited to, the Federal Clean |
16 | Water Act (33 U.S.C. § 1251 et seq.), the Resource Conservation and Recovery Act (42 U.S.C. § |
17 | 6901 et seq.), the Clean Air Act (42 U.S.C. § 7401 et seq.), and those state laws and regulations |
18 | which implement those federal laws, the department of environmental management shall be the |
19 | licensing and permitting authority. Moreover, the authority to issue licenses and permits |
20 | delegated to the department of environmental management pursuant to chapter 1 of title 2 and to |
21 | the coastal resources management council pursuant to chapter 23 of title 46, shall remain with |
22 | those agencies, but in all other respects the department of environmental management and the |
23 | coastal resources management council shall follow the procedures set forth in this chapter. |
24 | (4) Each host community shall prepare and submit to the board a report as to the |
25 | consistency of the proposed facility with all local ordinances, regulations, standards, and criteria |
26 | that apply to the facility. |
27 | (b) The siting board is authorized and empowered to summon and examine witnesses and |
28 | to compel the production and examination of papers, books, accounts, documents, records, |
29 | certificates, and other legal evidence that may be necessary for the determination of its |
30 | jurisdiction and decision of any question before, or the discharge of any duty required by law of, |
31 | the board. |
32 | (c) The siting board is empowered to issue any orders, rules, or regulations as may be |
33 | required to effectuate the purposes of this chapter. |
34 | (d) The siting board shall, by regulation, determine the standards for intervention. Each |
| LC002145 - Page 6 of 17 |
1 | host community shall be granted intervenor status as of right. |
2 | (e) The siting board's proceedings shall in all respects comply with the requirements of |
3 | the Administrative Procedures Act, chapter 35 of this title, except where otherwise explicitly |
4 | provided. |
5 | 42-98-8. Applications -- Contents -- Acceptance for filing. |
6 | (a) The rules and regulations promulgated by the board pursuant to § 42-98-7(c) shall |
7 | prescribe the form and contents of applications under this chapter. The board shall review EFSB |
8 | rules of practice and procedure every two (2) years to ensure standards for filing requirements |
9 | and application contents are sufficient. The applications shall contain at least the following, |
10 | where applicable: |
11 | (1) Identification of the proposed owner(s) of the facility, including identification of all |
12 | affiliates of the proposed owners, as the term is defined in § 39-3-27. |
13 | (2) Detailed description of the proposed facility, including its function and operating |
14 | characteristics, and complete plans as to all structures, including underground construction and |
15 | transmission facilities, underground or aerial, associated with the proposed facility and a detailed |
16 | description of applicant's access to all necessary utilities, including, but not limited to, water, |
17 | sewer, electric, and gas. |
18 | The complete plans shall be the basis for determining jurisdiction under the energy |
19 | facility siting act and shall be the plans submitted to all agencies whose permit is required under |
20 | the law. The application shall include all information which, absent this chapter, the applicant |
21 | would be required to submit to each agency to obtain a permit, license, variance, or assent. |
22 | (3) A detailed description and analysis of the impact of the proposed facility on its |
23 | physical and social environment together with a detailed description of all environmental |
24 | characteristics of the proposed site, and a summary of all studies prepared and relied upon in |
25 | connection therewith. |
26 | Where applicable these descriptions and analysis shall include a review of current |
27 | independent, scientific research pertaining to electric and magnetic fields (EMF). The review |
28 | shall provide data assessing potential health risks associated with EMF exposure. For the |
29 | purposes of this chapter "prudent avoidance" shall refer to measures to be implemented in order |
30 | to protect the public from EMF exposure. |
31 | (4) All studies and forecasts, complete with the information, data, methodology, and |
32 | assumptions on which they are based, on which the applicant intends to rely in showing the need |
33 | for the proposed facility under the statewide master construction plan submitted annually. |
34 | (5) Complete detail as to the estimated construction cost of the proposed facility, the |
| LC002145 - Page 7 of 17 |
1 | projected maintenance and operation costs, estimated costs to the community such as safety and |
2 | public health issues, storm damage and power outages, estimated costs to businesses and |
3 | homeowners due to power outages, the estimated unit cost of energy to be produced by the |
4 | proposed facility, and expected methods of financing the facility. |
5 | (6) A complete life-cycle management plan for the proposed facility, including a detailed |
6 | schedule providing design, material acquisition, construction, testing, and operation dates; and |
7 | measures for protecting the public health and safety and the environment during the facility's |
8 | operations, including, but not limited to, plans for the handling and disposal of wastes from the |
9 | facility, plans for emergency operations and shutdowns, and plans for the decommissioning of the |
10 | facility at the end of its useful life. |
11 | (7) A study of alternatives to the proposed facility, including alternatives as to energy |
12 | sources, methods of energy production, and sites for the facility, together with reasons for the |
13 | applicant's rejection of these alternatives. The study shall include estimates of facility cost and |
14 | unit energy costs of alternatives considered. |
15 | (8) A detailed and specific statement as to the effects the proposed facility would have on |
16 | the ability of the state to meet the carbon-emission-reduction goals set forth in §42-6.2-2(a)(2) |
17 | (b) Within thirty (30) days of the filing of an applicant application under this chapter, and |
18 | prior to docketing the application, the board shall notify the applicant whether the application is |
19 | in the form and addresses the matters that are required by this section and the rules and |
20 | regulations as are promulgated pursuant to § 42-98-7. An application meeting these requirements |
21 | shall then be docketed. Any application deemed to be deficient shall be returned to the applicant, |
22 | together with a concise and explicit statement of the application's deficiencies. Within fifteen (15) |
23 | days of the resubmission of an application following a rejection for deficiency, the board shall |
24 | docket the application together with specification of continuing deficiencies noted by the board, if |
25 | any. The application may be resubmitted once all identified deficiencies have been remedied. |
26 | 42-98-9. Applications -- Procedures for review -- Preliminary hearing. |
27 | (a) Within sixty (60) days following the board's docketing of an application the board |
28 | shall, on not less than forty-five (45) days' notice to all agencies, subdivisions of the state, and the |
29 | public, convene a preliminary hearing on the application to determine the issues to be considered |
30 | by the board in evaluating the application, and to designate those agencies of state government |
31 | and of political subdivisions of the state which shall act at the direction of the board for the |
32 | purpose of rendering advisory opinions on these issues, and to determine petitions for |
33 | intervention. |
34 | (b) The board shall consider as issues in every proceeding the ability of the proposed |
| LC002145 - Page 8 of 17 |
1 | facility to meet the requirements of the laws, rules, regulations, and ordinances under which, |
2 | absent this chapter, the applicant would be required to obtain a permit, license, variance, or |
3 | assent. The agency of state government or of a political subdivision of the state which, absent this |
4 | chapter, would have statutory authority to grant or deny the permit, license, variance, or assent, |
5 | shall function at the direction of the board for hearing the issue and rendering an advisory opinion |
6 | thereon. |
7 | (c) The board shall limit the scope of any agency's investigation where it finds that more |
8 | than one agency has jurisdiction over a matter at issue in the licensing process. In these instances, |
9 | the board shall determine which agency shall make the necessary findings on the issue after |
10 | giving proper consideration to the expertise and resources available to each of the agencies |
11 | involved. |
12 | (d) The public utilities commission shall conduct an investigation in which the division of |
13 | planning of the department of administration, the governor's office of energy assistance resources |
14 | and the division of public utilities and carriers shall participate and render an advisory opinion as |
15 | to the need for the proposed facility. |
16 | (e) The statewide planning program within the department of administration shall |
17 | conduct an investigation and render an advisory opinion as to the socio-economic impact of the |
18 | proposed facility and its construction and consistency with the state guide plan. This investigation |
19 | shall include review of municipal comprehensive plans for all host communities to ensure the |
20 | proposed project conforms to each municipal comprehensive plan. |
21 | (f) The board shall seek advisory opinions from the zoning, planning, and building |
22 | departments for each host community. The board shall seek advisory opinions from all public |
23 | utilities serving the facility, including, but not limited to, water, sewer, electric and gas. Advisory |
24 | opinions from municipal entities shall include a study of the financial impact of the proposed |
25 | facility on local services, infrastructure, and all public and private property located within three |
26 | (3) miles of the proposed site boundaries. |
27 | (f)(g) A decision of the board under this section shall be issued within thirty (30) days |
28 | following the conclusion of the preliminary hearing and in any event within forty-five (45) days |
29 | of the commencement of the hearing. |
30 | 42-98-9.1. Public notice and hearings on construction projects in cities and towns |
31 | affected. |
32 | (a) The applicant shall notify the host community no less than thirty (30) days prior to |
33 | filing its application with the board. |
34 | (a)(b) Upon receiving a utility company application the board shall immediately notify, in |
| LC002145 - Page 9 of 17 |
1 | writing, the councils of the towns and cities affected by the construction. This includes, but is not |
2 | limited to, each host community. |
3 | (b)(c) The board shall have at least one three (3) public hearing hearings in each town or |
4 | city host community affected prior to holding its own hearings and prior to taking final action on |
5 | the application. All details of acceptance for filing in § 42-98-8(a)(1) -- (a)(6) §42-98-8-(a)(1) |
6 | through (a)(8) shall be presented at town or city hearings for public comment. No public hearing |
7 | shall occur until the application is deemed sufficient and docketed by the board as required in |
8 | §42-98-8(b). Public hearings shall be held within six (6) months of the date the application is |
9 | docketed by the board. When the subject of the application is a facility for the generation of |
10 | electricity, or new facilities for the transmission of electricity, the town or city each host |
11 | community, including quasi-municipal corporations within the host community, where the |
12 | proposed facility would be located may request funding from the applicant to perform studies of |
13 | the local environmental effects of the proposed facility. The expense of those studies shall not |
14 | exceed the lesser greater of one hundred thousand dollars ($100,000) one hundred fifty thousand |
15 | dollars ($150,000) or one-tenth percent (.1%) of the estimated capital cost of the proposed facility |
16 | located in such city or town. If the applicant contests the relevance of the requested study, or |
17 | believes it to be redundant with studies already performed, the applicant may request a ruling |
18 | from the board whether the study is necessary and reasonably expected to produce relevant |
19 | information. The board's ruling shall be conclusive and final, and shall not be the basis for an |
20 | interlocutory appeal, injunction or otherwise delay the board's processing of the application. The |
21 | applicant shall also pay any and all fees and expenses reasonably incurred by each host |
22 | community, including quasi-municipal corporations within the host community, to fully |
23 | participate in the facility siting process, and local review, including, but not limited to, fees and |
24 | expenses for legal counsel, expert evaluations, transcripts and other costs associated with the |
25 | entire siting process. |
26 | (c)(d) The applicant shall notify the citizens in towns and cities affected thirty (30) days |
27 | prior to public meetings through local papers. Newspaper notice should be at least one-half (1/2) |
28 | page in size, and shall include a map depicting the project and all associated corridors. If the |
29 | board determines that any notice was substantially inaccurate, then the board may order an |
30 | additional hearing with appropriate notice. |
31 | (d)(e) The applicant shall notify abutting the following land owners individually, in |
32 | writing, thirty (30) days prior to the any hearings, by certified mail, postage prepaid. |
33 | (1) For proposed or existing electric generating facilities, applicants shall notify all land |
34 | owners whose property is located within three (3) miles of the proposed site boundaries; |
| LC002145 - Page 10 of 17 |
1 | (2) For all other projects, applicants shall notify all land owners whose property is located |
2 | within one mile from the proposed project or corridor. |
3 | (e)(f) Public input shall be a part of the decision making decision-making process. |
4 | 42-98-10. Agency procedures -- Advisory opinion. |
5 | (a) Each agency of the state or political subdivision of the state designated under § 42-98- |
6 | 9 shall proceed to consider the issue or issues consigned to it for review. Each agency shall |
7 | conclude its consideration and issue its advisory opinion not more than six (6) months following |
8 | its designation under § 42-98-9 and receipt of all details required in §42-98-8(a)(1) through |
9 | (a)(8), or any lesser time that the board may require, or the right to exercise the function shall be |
10 | forfeited to the board. If sufficient details to allow agencies to consider and issue advisory |
11 | opinions are unavailable for any reasons, the application proceeding shall be suspended for up to |
12 | sixty (60) days to allow sufficient details to be submitted by the applicant. If, at the end of sixty |
13 | (60) days, sufficient details have not been provided in writing, the application shall be denied |
14 | with prejudice. |
15 | (b) Advisory opinions issued by agencies designated under § 42-98-9 shall not be |
16 | considered as final decisions of the agencies making the opinions, and shall not be subject to |
17 | judicial review under § 42-35-15, or any other provision of the general laws. |
18 | (c) Advisory opinions issued by zoning boards of review, building inspectors, or any |
19 | other agency of a municipality designated under § 42-98-9 shall not be reviewable by the public |
20 | utilities commission under § 39-1-30. |
21 | (d) Failure or refusal of the applicant to provide requested information may be considered |
22 | as grounds for recommending denial. |
23 | (e) At the request of the siting board, the director of environmental management and the |
24 | coastal resources management council shall give priority to the review of permits for energy |
25 | facilities. |
26 | (f) Any town or city council may submit to the board a resolution setting forth the |
27 | council's support or opposition to the project at any time after the application is docketed by the |
28 | board and no later than thirty (30) days following the submission of advisory opinions, unless an |
29 | extension is granted by the board for good cause shown. |
30 | 42-98-11. Final hearing -- Standards -- Decisions. |
31 | (a) Within forty-five (45) days after the final date for submission of advisory opinions |
32 | pursuant to § 42-98-10, the board shall convene the final hearing on the application. The purpose |
33 | of this hearing shall not be to rehear the evidence which was presented previously in hearings |
34 | before agencies designated under § 42-98-9, but rather to provide the applicant, intervenors, the |
| LC002145 - Page 11 of 17 |
1 | public, and all other parties in the proceeding, the opportunity to address in a single forum, and |
2 | from a consolidated, statewide prospective, the issues reviewed, and the recommendations made |
3 | in the proceedings before the agencies designated under § 42-98-9. The board at this hearing may, |
4 | at its discretion, allow the presentation of new evidence by any party, including intervenors, as to |
5 | the issues considered by the agencies designated under § 42-98-9. The board may limit the |
6 | presentation of repetitive or cumulative evidence. The hearing shall proceed on not less than |
7 | thirty (30) days' notice to the parties and the public, shall be concluded not more than sixty (60) |
8 | days following its initiation, and shall be conducted expeditiously. |
9 | (b) The board shall issue a decision granting a license only upon finding that the |
10 | applicant has shown that: |
11 | (1) Construction of the proposed facility is necessary to meet the needs of the state and/or |
12 | region for energy of the type to be produced by the proposed facility. |
13 | (2) The proposed facility is cost-justified, and can be expected to produce energy at the |
14 | lowest reasonable cost to the consumer consistent with the objective of ensuring that the |
15 | construction and operation of the proposed facility will be accomplished in compliance with all of |
16 | the requirements of the laws, rules, regulations, and ordinances, under which, absent this chapter, |
17 | a permit, license, variance, or assent would be required, or that consideration of the public health, |
18 | safety, welfare, security and need for the proposed facility justifies a waiver of some part of the |
19 | requirements when compliance cannot be assured. |
20 | (3) The proposed facility will not cause unacceptable harm to the environment and will |
21 | enhance the socio-economic fabric of the state. |
22 | (c) The board shall not issue a decision granting a license to any applicant unless the |
23 | board has thoroughly considered whether construction of the proposed facility will adversely |
24 | impact the ability of the state to achieve the carbon-emissions-reduction goals set forth in §42- |
25 | 6.2-2(a)(2). |
26 | (d) Prior to the making of a decision, the board shall take into consideration any town or |
27 | city council resolution regarding the application. Where a host community is already burdened by |
28 | one or more fossil fuel energy facilities of eighty megawatts (80 MW) or more, the board shall |
29 | abide by the town or city council's wishes with regard to a proposed new facility, unless the board |
30 | is presented with clear and convincing evidence to the contrary. |
31 | (e) Where multiple EFSB applications relate to a single project, the board shall consider |
32 | the cumulative impacts of the related applications. |
33 | (c)(f) Within sixty (60) days of the conclusion of the final hearing the board shall issue its |
34 | final decision on the application. A decision in favor of the application shall constitute a granting |
| LC002145 - Page 12 of 17 |
1 | of all permits, licenses, variances, or assents, which under any law, rule, regulation, or ordinance |
2 | of the state or of a political subdivision thereof which would, absent this chapter, be required for |
3 | the proposed facility. The decision may be issued requiring any modification or alteration of the |
4 | proposed facility, and may be issued on any condition the board deems warranted by the record, |
5 | and may be issued conditional upon the applicant's receipt of permits required by federal law. The |
6 | board's decision shall explicitly address any resolution from a host community, and each of the |
7 | advisory opinions received from agencies, and the board's reasons for accepting, rejecting, or |
8 | modifying, in whole or in part, any of those advisory opinions. The board shall, within ten (10) |
9 | days of granting a license, with or without conditions, deliver the decision to the speaker of the |
10 | Rhode Island house of representatives, and the president of the Rhode Island senate. |
11 | 42-98-12. Appeals and judicial review. |
12 | (a) The licensing decision issued by the siting board shall constitute the sole, final, |
13 | binding, and determinative regulatory decision within the state for the purposes of siting, |
14 | building, operating, or altering a major energy facility. |
15 | (b) Any person aggrieved by a decison of the board may within ten (10) twenty (20) days |
16 | from the date of ratification of the decision, obtain judicial review of the decision in the manner |
17 | and according to the standards and procedures provided in chapter 5 of title 39 appeal the |
18 | decision to the Rhode Island supreme court by filing a notice of appeal with the board and the |
19 | Rhode Island supreme court. |
20 | 42-98-16. Violations. |
21 | (a) Failure to comply with any promulgated board rule, regulation, requirement or |
22 | procedure for the licensing of energy facilities shall constitute grounds for suspension or |
23 | dismissal, with or without prejudice in its discretion, of licensing proceedings, provided that the |
24 | applicant shall have a reasonable opportunity to show cause for and remedy the lack of |
25 | compliance. |
26 | (b) Failure to comply with any provision, condition or limitation contained in a board |
27 | license to site, build, or alter a major energy facility and/or failure to comply with a board cease |
28 | and desist order and/or a board order to remedy a non-complying action shall be grounds for |
29 | suspension or revocation of the license, and/or shall be punishable by a fine of not more than |
30 | twenty thousand dollars ($20,000) fifty thousand dollars ($50,000). Each day of continuing |
31 | noncompliance shall be considered a separate violation and so punished. |
32 | (c) The board may require the licensee to maintain those records as are reasonable and |
33 | necessary to monitor compliance with license provisions, and shall have the authority to enter |
34 | onto the property of licensees to investigate complaints of noncompliance and to perform routine |
| LC002145 - Page 13 of 17 |
1 | inspections. |
2 | (d) The board shall take reasonable steps to ensure each facility for which a certificate |
3 | has been issued is constructed, maintained, and operated in compliance with such certificate and |
4 | any other standard established pursuant to this chapter. The board may designate officials or staff |
5 | of any state agencies as its agents for the purposes of investigating complaints, performing |
6 | routine maintenance functions and issuing written cease and desist orders. |
7 | (e) Any license may be revoked or suspended for any materially false statement in the |
8 | application or supplemental submissions by the applicant when a true answer would have |
9 | warranted the board's refusal to issue a license in the first instance. |
10 | (f) Civil proceedings to enforce this chapter may be brought by the Rhode Island attorney |
11 | general's office or any host community in the superior court. |
12 | (g) Nothing in this chapter shall preclude a host community from enforcing municipal |
13 | ordinances, levying fines, or pursuing any other legally available enforcement remedies, unless |
14 | such ordinances are in direct conflict with a certificate or license issued by the board. |
15 | 42-98-17. Appropriation, fees and grants. |
16 | (a) There is created an account to be known as the "energy facility siting account", an |
17 | account within the public utilities commission in the general fund, hereinafter referred to as the |
18 | "account", for the purpose of providing the financial means for the board to purchase materials |
19 | and to employ on a contract or other basis legal counsel, official stenographers, engineers, |
20 | accountants, and expert witnesses and for other necessary expenses of the board in investigations |
21 | and hearings on applications for licensure under this chapter. The general assembly shall annually |
22 | appropriate to the account the amounts as may be required to bring the balance of the account to |
23 | the sum of one hundred thousand dollars ($100,000); provided, however, that if at June 30 in any |
24 | year the balance in the account shall be in excess of one hundred thousand dollars ($100,000), the |
25 | amount of the excess shall be transferred to the general account of the state. The controller is |
26 | authorized and directed to draw his or her orders upon the general treasurer for the payment from |
27 | the account of the sums as may be required from time to time upon receipt by the controller of |
28 | proper vouchers approved by the chairperson of the board or the secretary. |
29 | (b) The board shall be authorized to establish reasonable fees for investigations, |
30 | applications and hearings. Applicants shall pay those fees in full prior to the hearing process |
31 | commencing unless the board agrees to an alternative payment schedule. All fees collected by the |
32 | board shall be deposited with the general treasurer and appropriated to the board. The state |
33 | controller is authorized and directed to draw his or her orders upon the general treasurer for |
34 | payment of any sum or sums as may be necessary from time to time and upon receipt by him or |
| LC002145 - Page 14 of 17 |
1 | her of authenticated vouchers presented by the coordinator of the board. |
2 | (c) All moneys collected by the chairperson or the secretary pursuant to this section shall |
3 | be paid by him or her monthly to the general treasurer to be added to the energy facility siting |
4 | account. |
5 | (d) Failure of the applicant to pay expenses lawfully assessed by the board shall |
6 | constitute grounds for suspension of licensing proceedings or revocation of any license granted, |
7 | until the applicant has paid the expenses. |
8 | (e) The board shall be empowered to draw upon this account and to distribute monies |
9 | from the fees to and bodies of state and local government participating in licensing actions or |
10 | acting as the board's agents for the purposes of insuring compliance with license provisions and |
11 | for employing staff or consultants and for carrying out the provisions of this chapter. |
12 | (f) The board shall be authorized to receive any grants made for the purpose of planning |
13 | for or regulating the siting of energy facilities and to disburse and administer the grants under the |
14 | terms of the grants. |
15 | (g) The board shall not issue a license to build a new fossil-fuel electric generating |
16 | facility unless the applicant demonstrates it has satisfied the following requirements: |
17 | (1) Applicant shall provide adequate funds for the host community fire marshal to retain |
18 | at least one special inspector to assist the host community fire marshal, for the duration of the |
19 | construction project; and |
20 | (2) Applicant shall provide adequate funds to be used in the training of local public safety |
21 | and emergency management personnel in the host community, including quasi-municipal |
22 | corporations within the host community, and personnel from neighboring communities which |
23 | would likely provide mutual aid within the host community, on the complex issues of electric |
24 | generating facility construction and operation. |
25 | (h) The special inspector retained under subsection (g) of this section shall: |
26 | (1) Be approved by the board and not otherwise employed or financially involved in the |
27 | construction or operation of the facility; have knowledge and field experience in electric |
28 | generating facility construction; and |
29 | (2) Assist the local fire marshal with review and approval of an appropriate safety plan |
30 | for the electric generating facility; and conduct inspections during construction of the facility to |
31 | ensure compliance with certificates and safety standards. |
32 | 42-98-20. Informational filings. |
33 | (a) To assist the board in achieving the policy objectives set forth in § 42-98-2, the |
34 | owners of any proposed energy facility, whether or not the facility qualified as a major energy |
| LC002145 - Page 15 of 17 |
1 | facility, shall make an informational filing with the board at the time of first application to any |
2 | other agency, board, council, or commission of the state or political subdivision of the state |
3 | required to issue a permit, license, assent, or variance in order for the siting, construction, or |
4 | alteration of the facility to proceed. Copies of any informational filing shall be provided to the |
5 | councils of the towns and cities affected by the proposed facility within seven (7) days of filing |
6 | with the board. |
7 | (b) The informational filing shall contain at least the following: |
8 | (1) Identification of the proposed owner(s) of the facility, including identification of all |
9 | affiliates of the proposed owners, as the term is defined in § 39-3-27. |
10 | (2) Detailed description of the proposed facility, including its function and operating |
11 | characteristics, and complete plans as to all structures, including underground construction and |
12 | transmission facilities, underground or aerial, associated with the proposed facility. |
13 | SECTION 2. This act shall take effect upon passage. |
======== | |
LC002145 | |
======== | |
| LC002145 - Page 16 of 17 |
EXPLANATION | |
BY THE LEGISLATIVE COUNCIL | |
OF | |
A N A C T | |
RELATING TO STATE AFFAIRS AND GOVERNMENT -- ENERGY FACILITY SITING | |
ACT | |
*** | |
1 | This act would amend various sections of the "Energy Facility Siting Act" relative to |
2 | their procedures and the consideration of host communities' rights and enforcement of city or |
3 | town ordinances, rules and regulations, the siting board's membership, and certain conditions |
4 | relating to board members and quorum requirements. |
5 | This act would take effect upon passage. |
======== | |
LC002145 | |
======== | |
| LC002145 - Page 17 of 17 |