2018 -- H 7808

========

LC004999

========

     STATE OF RHODE ISLAND

IN GENERAL ASSEMBLY

JANUARY SESSION, A.D. 2018

____________

A N   A C T

RELATING TO PUBLIC UTILITIES AND CARRIERS -- LEAST COST PROCUREMENT

     

     Introduced By: Representatives Marshall, Bennett, and Kennedy

     Date Introduced: February 28, 2018

     Referred To: House Finance

     It is enacted by the General Assembly as follows:

1

     SECTION 1. Section 39-1-27.7 of the General Laws in Chapter 39-1 entitled "Public

2

Utilities Commission" is hereby amended to read as follows:

3

     39-1-27.7. System reliability and least-cost procurement.

4

     Least-cost procurement shall comprise system reliability and energy efficiency and

5

conservation procurement as provided for in this section and supply procurement as provided for

6

in ยง 39-1-27.8, as complementary but distinct activities that have as common purpose meeting

7

electrical and natural gas energy needs in Rhode Island, in a manner that is optimally cost-

8

effective, reliable, prudent and environmentally responsible.

9

     (a) The commission shall establish not later than June 1, 2008, standards for system

10

reliability and energy efficiency and conservation procurement, which shall include standards and

11

guidelines for:

12

     (1) System reliability procurement, including but not limited to:

13

     (i) Procurement of energy supply from diverse sources, including, but not limited to,

14

renewable energy resources as defined in chapter 26 of this title;

15

     (ii) Distributed generation, including, but not limited to, renewable energy resources and

16

thermally leading combined heat and power systems, which is reliable and is cost-effective, with

17

measurable, net system benefits;

18

     (iii) Demand response, including, but not limited to, distributed generation, back-up

19

generation and on-demand usage reduction, which shall be designed to facilitate electric customer

 

1

participation in regional demand response programs, including those administered by the

2

independent service operator of New England ("ISO-NE") and/or are designed to provide local

3

system reliability benefits through load control or using on-site generating capability;

4

     (iv) To effectuate the purposes of this division, the commission may establish standards

5

and/or rates (A) for qualifying distributed generation, demand response, and renewable energy

6

resources; (B) for net-metering; (C) for back-up power and/or standby rates that reasonably

7

facilitate the development of distributed generation; and (D) for such other matters as the

8

commission may find necessary or appropriate.

9

     (2) Least-cost procurement, which shall include procurement of energy efficiency and

10

energy conservation measures that are prudent and reliable and when such measures are lower

11

cost than acquisition of additional supply, including supply for periods of high demand.

12

     (b) The standards and guidelines provided for by subsection (a) shall be subject to

13

periodic review and as appropriate amendment by the commission, which review will be

14

conducted not less frequently than every three (3) years after the adoption of the standards and

15

guidelines.

16

     (c) To implement the provisions of this section:

17

     (1) The commissioner of the office of energy resources and the energy efficiency and

18

resources management council, either or jointly or separately, shall provide the commission

19

findings and recommendations with regard to system reliability and energy efficiency and

20

conservation procurement on or before March 1, 2008, and triennially on or before March 1,

21

thereafter through March 1, 2024. The report shall be made public and be posted electronically on

22

the website to the office of energy resources.

23

     (2) The commission shall issue standards not later than June 1, 2008, with regard to plans

24

for system reliability and energy efficiency and conservation procurement, which standards may

25

be amended or revised by the commission as necessary and/or appropriate.

26

     (3) The energy efficiency and resources management council shall prepare by July 15,

27

2008, a reliability and efficiency procurement opportunity report which shall identify

28

opportunities to procure efficiency, distributed generation, demand response and renewables,

29

which report shall be submitted to the electrical distribution company, the commission, the office

30

of energy resources and the joint committee on energy.

31

     (4) Each electrical and natural gas distribution company shall submit to the commission

32

on or before September 1, 2008, and triennially on or before September 1, thereafter through

33

September 1, 2024, a plan for system reliability and energy efficiency and conservation

34

procurement. In developing the plan, the distribution company may seek the advice of the

 

LC004999 - Page 2 of 5

1

commissioner and the council. The plan shall include measurable goals and target percentages for

2

each energy resource, pursuant to standards established by the commission, including efficiency,

3

distributed generation, demand response, combined heat and power, and renewables. The plan

4

shall be made public and be posted electronically on the website to the office of energy resources,

5

and shall also be submitted to the general assembly.

6

     (5) The commission shall issue an order approving all energy efficiency measures that are

7

cost effective and lower cost than acquisition of additional supply, except that the system benefit

8

charge shall be capped at the annual published Consumer Price Index or two and one-half percent

9

(2.5%) whichever is greater, with regard to the plan from the electrical and natural gas

10

distribution company, and reviewed and approved by the energy efficiency and resources

11

management council, and any related annual plans, and shall approve a fully reconciling funding

12

mechanism to fund investments in all efficiency measures that are cost effective and lower cost

13

than acquisition of additional supply, except that the system benefit charge shall be capped at the

14

annual published Consumer Price Index or two and one-half percent (2.5%) whichever is greater,

15

not greater than sixty (60) days after it is filed with the commission.

16

     (6) (i) Each electrical and natural gas distribution company shall provide a status report,

17

which shall be public, on the implementation of least cost procurement on or before December

18

15, 2008, and on or before February 1, 2009, to the commission, the division, the commissioner

19

of the office of energy resources and the energy efficiency and resources management council

20

which may provide the distribution company recommendations with regard to effective

21

implementation of least cost procurement. The report shall include the targets for each energy

22

resource included in the order approving the plan and the achieved percentage for energy

23

resource, including the achieved percentages for efficiency, distributed generation, demand

24

response, combined heat and power, and renewables as well as the current funding allocations for

25

each eligible energy resource and the businesses and vendors in Rhode Island participating in the

26

programs. The report shall be posted electronically on the website of the office of energy

27

resources.

28

     (ii) Beginning on November 1, 2012 or before, each electric distribution company shall

29

support the installation and investment in clean and efficient combined heat and power

30

installations at commercial, institutional, municipal, and industrial facilities. This support shall be

31

documented annually in the electric distribution company's energy efficiency program plans. In

32

order to effectuate this provision, the energy efficiency and resource management council shall

33

seek input from the public, the gas and electric distribution company, the economic development

34

corporation, and commercial and industrial users, and make recommendations regarding services

 

LC004999 - Page 3 of 5

1

to support the development of combined heat and power installations in the electric distribution

2

company's annual and triennial energy efficiency program plans.

3

     (iii) The energy efficiency annual plan shall include, but not be limited to, a plan for

4

identifying and recruiting qualified combined heat and power projects, incentive levels, contract

5

terms and guidelines, and achievable megawatt targets for investments in combined heat and

6

power systems. In the development of the plan, the energy efficiency and resource management

7

council and the electric distribution company shall factor into the combined heat and power plan

8

and program, the following criteria: (A) Economic development benefits in Rhode Island,

9

including direct and indirect job creation and retention from investments in combined heat and

10

power systems; (B) Energy and cost savings for customers; (C) Energy supply costs; (D)

11

Greenhouse gas emissions standards and air quality benefits; and (E) System reliability benefits.

12

     (iv) The energy efficiency and resource management council shall conduct at least one

13

public review meeting annually, to discuss and review the combined heat and power program,

14

with at least seven (7) business day's notice, prior to the electric and gas distribution utility

15

submitting the plan to the commission. The commission shall evaluate the submitted combined

16

heat and power program as part of the annual energy efficiency plan. The commission shall issue

17

an order approving the energy efficiency plan and programs within sixty (60) days of the filing.

18

     (d) If the commission shall determine that the implementation of system reliability and

19

energy efficiency and conservation procurement has caused or is likely to cause under or over-

20

recovery of overhead and fixed costs of the company implementing said procurement, the

21

commission may establish a mandatory rate adjustment clause for the company so affected in

22

order to provide for full recovery of reasonable and prudent overhead and fixed costs.

23

     (e) The commission shall conduct a contested case proceeding to establish a performance

24

based incentive plan which allows for additional compensation for each electric distribution

25

company and each company providing gas to end-users and/or retail customers based on the level

26

of its success in mitigating the cost and variability of electric and gas services through

27

procurement portfolios.

28

     SECTION 2. This act shall take effect upon passage.

========

LC004999

========

 

LC004999 - Page 4 of 5

EXPLANATION

BY THE LEGISLATIVE COUNCIL

OF

A N   A C T

RELATING TO PUBLIC UTILITIES AND CARRIERS -- LEAST COST PROCUREMENT

***

1

     This act would cap the system benefit charge, relative to system reliability and energy

2

efficiency, at the annual published Consumer Price Index or two and one-half percent (2.5%),

3

whichever is greater.

4

     This act would take effect upon passage.

========

LC004999

========

 

LC004999 - Page 5 of 5