2018 -- H 8120

========

LC005383

========

     STATE OF RHODE ISLAND

IN GENERAL ASSEMBLY

JANUARY SESSION, A.D. 2018

____________

A N   A C T

RELATING TO STATE AFFAIRS AND GOVERNMENT - ENERGY FACILITY SITING

ACT

     

     Introduced By: Representatives Keable, Newberry, Price, Handy, and Ruggiero

     Date Introduced: April 26, 2018

     Referred To: House Environment and Natural Resources

     It is enacted by the General Assembly as follows:

1

     SECTION 1. Sections 42-98-1, 42-98-2, 42-98-3, 42-98-5, 42-98-6, 42-98-7, 42-98-8,

2

42-98-9, 42-98-9.1, 42-98-10, 42-98-11, 42-98-12, 42-98-16, 42-98-17 and 42-98-20 of the

3

General Laws in Chapter 42-98 entitled "Energy Facility Siting Act" are hereby amended to read

4

as follows:

5

     42-98-1. Legislative findings.

6

     (a) The general assembly recognizes that reasonably priced, reliable sources of energy are

7

vital to the well-being and prosperity of the people of this state; that there are major issues of

8

public health and safety and impact upon the environment related to the technologies and energy

9

sources used in some facilities; that some energy facilities require a major commitment of funds

10

and resources and require many years to build that the decision to permit or deny their

11

construction will have long term impact on the economy of the state; that these decisions will

12

affect the availability and cost of the energy; and that the evaluation of proposals must recognize

13

and consider the need for these facilities in relation to the overall impact of the facilities upon

14

public health and safety, the environment and the economy of the state;

15

     (b) The general assembly further finds that the authority to regulate many aspects of the

16

issues involved in the siting of major energy facilities currently exists in a variety of agencies

17

within the government of the state and the political subdivisions of the state; that there is

18

overlapping jurisdiction among several state agencies in the siting of energy facilities; and that

 

1

there is the potential for conflicting decisions being issued by the various agencies having

2

authority over the different aspects of the siting of a major energy facility;

3

     (c) The jurisdiction of each state agency should be defined, and the role of each agency in

4

energy siting should be delineated, to eliminate overlap and duplication and to insure that

5

expeditious decisions are made within a time frame to be determined by law; and that in addition

6

to the existing regulation, statewide and regional planning for energy resources and the

7

assessment of our state's need for energy should be on-going activities within Rhode Island;

8

     (d) The general assembly recognizes that each host community for any proposed or

9

existing energy facility is uniquely affected by the energy facility siting process.

10

     (d)(e) There is need for a coordinated decision on any major energy facility; the technical

11

expertise for this evaluation is available within existing agencies involved with the siting process;

12

and

13

     (e)(f) There is a need for coordinating and expediting the review of each state agency and

14

that the authority and responsibility to perform that function should be established.

15

     42-98-2. Declaration of policy.

16

     It shall be the policy of this state to assure that:

17

     (1) The facilities required to meet the energy needs of this and succeeding generations of

18

Rhode Islanders are planned for, considered, and built in a timely and orderly fashion;

19

     (2) Construction, operation, and/or alteration of major energy facilities shall only be

20

undertaken when those actions are justified by long term state and/or regional energy need

21

forecasts;

22

     (3) The energy shall be produced at the least possible cost to the consumer consistent

23

with the objective of ensuring that the construction, operation, and decommissioning of the

24

facility shall produce the fewest possible adverse effects on the quality of the state's environment;

25

most particularly, its land and its wildlife and resources, the health and safety of its citizens, the

26

purity of its air and water, its aquatic and marine life, and its esthetic and recreational value to the

27

public;

28

     (4) The licensure and regulatory authority of the state be consolidated in a single body,

29

which will render the final licensing decision concerning the siting, construction, operation and/or

30

alteration of major energy facilities;

31

     (5) An energy facility planning process shall be created through which the statewide

32

planning program, in conjunction with the division of public utilities and carriers, will be

33

empowered to undertake evaluations and projections of long and short term energy needs, and

34

any other matters that are necessary to establish the state energy plans, goals, and policies. The

 

LC005383 - Page 2 of 19

1

state planning council shall be authorized and empowered to adopt a long term plan assessing the

2

state's future energy needs and the best strategy for meeting them, as part of the state guide plan

3

by January 1, 1991.

4

     (6) The construction, operation and/or alteration of major energy facilities shall be

5

consistent with the state's established energy plans, goals, and policy.

6

     (7) Before approving the construction, operation and/or alteration of major energy

7

facilities, the board shall determine whether cost effective efficiency and conservation

8

opportunities provide an appropriate alternative to the proposed facility.

9

     (8) The energy facilities siting board shall give priority to energy generation projects

10

based on the degree to which such projects meet, criteria including, but not limited to:

11

     (i) Using renewable fuels, natural gas, or coal processed by "clean coal technology" as

12

The relative environmental impact of their primary fuel;

13

     (ii) Maximizing efficiency;

14

     (iii) Using low levels of high quality water;

15

     (iv) Using existing energy-generation facilities and sites;

16

     (v) Producing low levels of potentially harmful air emissions;

17

     (vi) Producing low levels of wastewater discharge;

18

     (vii) Producing low levels of waste into the solid waste stream; and

19

     (viii) Having dual fuel capacity Complying with the state's greenhouse gas emissions

20

reduction targets in the Resilient Rhode Island Act of 2014, § 42-6.2-1 et seq.

21

     The board shall, within its rules and regulations, provide guidelines and definitions of

22

appropriate standards for the criteria designated in this subsection by January 1, 1991 January 1,

23

2019.

24

     42-98-3. Definitions.

25

     (a) "Agency" means any agency, council, board, or commission of the state or political

26

subdivision of the state.

27

     (b) "Alteration" means a significant modification to a major energy facility, which, as

28

determined by the board, will result in a significant impact on the environment, or the public

29

health, safety, and welfare. Conversion from one type of fuel to another shall not be considered to

30

be an "alteration."

31

     (c) "Board" for purposes of this chapter refers to the siting board.

32

     (d) "Major energy facility" means facilities for the extraction, production, conversion,

33

and processing of coal; facilities for the generation of electricity designed or capable of operating

34

at a gross capacity of forty (40) megawatts or more; transmission lines of sixty-nine (69) Kv or

 

LC005383 - Page 3 of 19

1

over; facilities for the conversion, gasification, treatment, transfer, or storage of liquefied natural

2

and liquefied petroleum gases; facilities for the processing, enrichment, storage, or disposal of

3

nuclear fuels or nuclear byproducts; facilities for the refining of oil, gas, or other petroleum

4

products; facilities of ten (10) megawatts or greater capacity for the generation of electricity by

5

water power, and facilities associated with the transfer of oil, gas, and coal via pipeline; any

6

energy facility project of the Rhode Island economic development corporation; the board may

7

promulgate regulations to further define "major energy facility" to the extent further definition is

8

required to carry out the purpose of this chapter, provided that any waste to energy facility shall

9

not be deemed a major energy facility for the purposes of this chapter.

10

     (e) "Clean coal technology" means one of the technologies developed in the clean coal

11

technology program of the United States Department of Energy, and shown to produce emissions

12

levels substantially equal to those of natural gas fired power plants.

13

     (f) "Host community" means any city or town in the state in which all or a portion of a

14

proposed or existing energy facility shall be or is located.

15

     (g) "Environmental justice" means and includes the equal protection and meaningful

16

involvement of all people with respect to the development, implementation, and enforcement of

17

environmental laws, regulations, and policies and the equitable distribution of environmental

18

benefits.

19

     (h) "Designee" means a person currently employed by the agency that has designating

20

authority.

21

     42-98-5. Board established.

22

     (a) There is established the siting board which shall be a part of state government. When

23

the board sits for any purpose related to a proposed or existing facility, The the siting board shall

24

consist of three (3) nine (9) members, as follows: the chairperson of the public utilities

25

commission, or their designee, who shall serve as chairperson of the siting board; the director of

26

the department of environmental management; and, or their designee; the associate director of

27

administration for planning., or their designee; the director of the department of health, or their

28

designee; the attorney general, or their designee; four (4) members of the public: two (2) of whom

29

shall be appointed by the elected chief executive of the host community or, if there is no elected

30

chief executive, the president of the town council of the host community, one of whom must be a

31

resident of the host community and the other from the business community of the host

32

community who need not be a resident of the host community; one of whom shall be appointed

33

by the attorney general who shall be a resident of the state and have experience or expertise in

34

one or more of the following areas: public deliberative or adjudicative proceedings; business

 

LC005383 - Page 4 of 19

1

management; environmental protection; natural resource protection; energy facility design,

2

construction, operation, or management; or community and regional planning or economic

3

development; and one who shall be a member of the bar of the state appointed by the president of

4

the state bar association, who shall have experience or expertise in one or more of the following

5

areas: public deliberative or adjudicative proceedings; business management; environmental

6

protection; natural resource protection; energy facility design, construction, operation, or

7

management; or community and regional planning or economic development. If there are

8

multiple host communities, those communities shall confer and make joint appointments pursuant

9

to this section. Any member of the board who recuses him or herself or is otherwise unable to

10

fulfill their obligations shall designate his or her own successor from his or her respective agency.

11

or, in the case of a public member, a successor shall be appointed in like manner. Each

12

application relating to a proposed or existing facility shall have a board established for that

13

application. A person may serve on two (2) or more boards simultaneously.

14

     (b) Each member of the board shall take an oath to administer the duties of office

15

faithfully and impartially and that oath shall be filed in the office of the secretary of state.

16

     (c) The members of the board who serve in their capacity as an employee of the state or

17

quasi-state agency or municipality shall serve without compensation,. Members of the board who

18

are not employees of the state or municipality shall receive reasonable compensation for their

19

services, as determined by the board chairperson. but All members of the board shall be

20

reimbursed for their actual expenses necessarily incurred in the performance of their duties. Such

21

compensation and expense reimbursement shall be paid monthly by the applicant. The board may

22

engage, at the applicant's expense, any consultants or expert witnesses that it deems necessary to

23

implement its statutory responsibilities; provided, however, that to the maximum extent possible,

24

board staff be drawn from existing state agencies. The board shall select a coordinator to be

25

responsible for the publication and distribution of all official minutes, reports, and documents and

26

to further serve as director of the board staff, which shall be located at the division of public

27

utilities and common carriers. The coordinator, under the direction of the chairperson, shall

28

coordinate and expedite the work of the various agencies to ensure that decisions are made within

29

the time frame established by this chapter.

30

     (d) A quorum shall consist of a majority of the board. A quorum is required to conduct

31

any meeting of the board held for the purpose of considering and voting upon an adjudicatory

32

decision, a proposal to adopt, amend or rescind regulations, or any other matter requiring a vote

33

of the board. A majority vote of the board shall be required for all actions, including licensing

34

decisions; provided, however, one member of the board may conduct any hearings the board is

 

LC005383 - Page 5 of 19

1

authorized to conduct pursuant to this chapter.

2

     (e) The board shall maintain and grant free access to records and reports in its files to

3

members of the public during normal working hours and shall permit copies of those records and

4

reports to be made by interested members of the public at their expense; provided, however, that

5

the board shall not permit disclosure, other than to another government agency for the sole

6

purpose of rendering an advisory opinion, of any information obtained by or submitted to the

7

board pursuant to the provisions of this chapter, upon a showing, satisfactory to the board, that

8

the information is entitled to protection as trade secrets or as privileged, confidential, or

9

proprietary information. No other governmental agency shall disclose any trade secrets or

10

privileged, confidential, or proprietary information.

11

     (f) Time periods within this chapter are discretionary, not mandatory. For good cause

12

shown, the board may, at its discretion, extend any and all time periods herein.

13

     42-98-6. Holding over in office.

14

     When the term of office of a member of the siting board expires or otherwise terminates,

15

and that person has participated in hearing all or a substantial part of the evidence in a proceeding

16

before the board, that person shall remain a member of the siting board for the sole purpose of

17

completing the hearing and deciding the matter pending and signing the findings, orders, and

18

judgments in the proceeding. For these services, the person shall be paid reasonable

19

compensation and necessary expenses as fixed by the siting board as composed following the

20

expiration of that person's term of office. For this purpose, a proceeding shall be deemed

21

completed when the siting board enters its final decision therein regardless of whether that

22

decision is or may be appealed to the supreme court and the case remanded to the siting board for

23

further proceedings.

24

     42-98-7. Powers and duties.

25

     (a) (1) The siting board is the licensing and permitting authority for all licenses, permits,

26

assents, or variances which, under any statute of the state or ordinance of any political

27

subdivision of the state, would be required for siting, construction or alteration of a major energy

28

facility in the state.

29

     (2) Any agency, board, council, or commission of the state or political subdivision of the

30

state which, absent this chapter, would be required to issue a permit, license, assent, or variance

31

in order for the siting, construction, or alteration of a major energy facility to proceed, shall sit

32

and function at the direction of the siting board. These agencies shall follow the procedures

33

established by statute, ordinance, and/or regulation provided for determining the permit, license,

34

assent, or variance, but, instead of issuing the permit, license, assent, or variance, shall forward its

 

LC005383 - Page 6 of 19

1

findings from the proceeding, together with the record supporting the findings and a

2

recommendation for final action, to the siting board.

3

     (3) Notwithstanding any provision in this chapter to the contrary, in those instances in

4

which the department of environmental management exercises a permitting or licensing function

5

under the delegated authority of federal law, including, but not limited to, the Federal Clean

6

Water Act (33 U.S.C. § 1251 et seq.), the Resource Conservation and Recovery Act (42 U.S.C. §

7

6901 et seq.), the Clean Air Act (42 U.S.C. § 7401 et seq.), and those state laws and regulations

8

which implement those federal laws, the department of environmental management shall be the

9

licensing and permitting authority. Moreover, the authority to issue licenses and permits

10

delegated to the department of environmental management pursuant to chapter 1 of title 2 and to

11

the coastal resources management council pursuant to chapter 23 of title 46, shall remain with

12

those agencies, but in all other respects the department of environmental management and the

13

coastal resources management council shall follow the procedures set forth in this chapter.

14

     (4) Each host community shall prepare and submit to the board a report as to the

15

consistency of the proposed facility with all local ordinances, regulations, standards and criteria

16

that apply to the facility.

17

     (b) The siting board is authorized and empowered to summon and examine witnesses and

18

to compel the production and examination of papers, books, accounts, documents, records,

19

certificates, and other legal evidence that may be necessary for the determination of its

20

jurisdiction and decision of any question before, or the discharge of any duty required by law of,

21

the board.

22

     (c) The siting board is empowered to issue any orders, rules, or regulations as may be

23

required to effectuate the purposes of this chapter.

24

     (d) The siting board shall, by regulation, determine the standards for intervention, which

25

shall be liberally granted. Each host community shall be granted intervenor status as of right.

26

     (e) The siting board's proceedings shall in all respects comply with the requirements of

27

the Administrative Procedures Act, chapter 35 of this title, except where otherwise explicitly

28

provided.

29

     SECTION 2. Chapter 42-98 of the General Laws entitled "Energy Facility Siting Act" is

30

hereby amended by adding thereto the following section:

31

     42-98-7.1. Counsel for the public.

32

     (a) Within fifteen (15) days of the board's docketing of an application, the president of

33

the Rhode Island Bar Association shall appoint an attorney or attorneys, licensed in Rhode Island,

34

to serve as counsel for the public.

 

LC005383 - Page 7 of 19

1

     (b) Counsel for the public shall represent the public in seeking to protect the quality of

2

the environment, including advocating for environmental justice matters.

3

     (c) Counsel for the public shall be accorded all the rights, privileges, and responsibilities

4

of an attorney representing a party in formal action and shall serve until the decision to issue or

5

deny an application is final.

6

     (d) Fees for the counsel for the public, including fees for expert witnesses, if any, shall be

7

paid by the applicant through the board's assessment process.

8

     (e) Nothing contained herein shall be construed as preventing any person or entity from

9

being represented by counsel of their own choosing.

10

     42-98-8. Applications -- Contents -- Acceptance for filing.

11

     (a) The rules and regulations promulgated by the board pursuant to § 42-98-7(c) shall

12

prescribe the form and contents of applications under this chapter. The board shall review EFSB

13

Rules of Practice and Procedure every two (2) years to ensure standards for filing requirements

14

and application contents are sufficient. The applications shall contain at least the following,

15

where applicable:

16

     (1) Identification of the proposed owner(s) of the facility, including identification of all

17

affiliates of the proposed owners, as the term is defined in § 39-3-27.

18

     (2) Detailed description of the proposed facility, including its function and operating

19

characteristics, and complete plans as to all structures, including underground construction and

20

transmission facilities, underground or aerial, associated with the proposed facility., and a

21

detailed description of applicant’s access to all necessary utilities, including, but not limited to,

22

water, sewer, electric, and gas.

23

     The complete plans shall be the basis for determining jurisdiction under the energy

24

facility siting act and shall be the plans submitted to all agencies whose permit is required under

25

the law. The application shall include all information which, absent this chapter, the applicant

26

would be required to submit to each agency to obtain a permit, license, variance, or assent.

27

     (3) A detailed description and analysis of the impact of the proposed facility on its

28

physical and social environment together with a detailed description of all environmental

29

characteristics of the proposed site, and a summary of all studies prepared and relied upon in

30

connection therewith.

31

     Where applicable these descriptions and analysis shall include a review of current

32

independent, scientific research pertaining to electric and magnetic fields (EMF). The review

33

shall provide data assessing potential health risks associated with EMF exposure. For the

34

purposes of this chapter "prudent avoidance" shall refer to measures to be implemented in order

 

LC005383 - Page 8 of 19

1

to protect the public from EMF exposure.

2

     (4) All studies and forecasts, complete with the information, data, methodology, and

3

assumptions on which they are based, on which the applicant intends to rely in showing the need

4

for the proposed facility under the statewide master construction plan submitted annually.

5

     (5) Complete detail as to the estimated construction cost of the proposed facility, the

6

projected maintenance and operation costs, estimated costs to the community such as safety and

7

public health issues, storm damage and power outages, estimated costs to businesses and

8

homeowners due to power outages, the estimated unit cost of energy to be produced by the

9

proposed facility, and expected methods of financing the facility.

10

     (6) A complete life-cycle management plan for the proposed facility, including a detailed

11

schedule providing design, material acquisition, construction, testing, and operation dates; and

12

measures for protecting the public health and safety and the environment during the facility's

13

operations, including, but not limited to, plans for the handling and disposal of wastes from the

14

facility, plans for emergency operations and shutdowns, and plans for the decommissioning of the

15

facility at the end of its useful life.

16

     (7) A study of alternatives to the proposed facility, including alternatives as to energy

17

sources, methods of energy production, and sites for the facility, together with reasons for the

18

applicant's rejection of these alternatives. The study shall include estimates of facility cost and

19

unit energy costs of alternatives considered.

20

     (8) A detailed and specific statement as to the effects the proposed facility would have on

21

the ability of the state to meet the carbon-emissions-reduction goals set forth in § 42-6.2-2(a)(2).

22

     (b) Within thirty (30) days of the filing of an applicant application under this chapter, and

23

prior to docketing the application, the board shall notify the applicant whether the application is

24

in the form and addresses the matters that are required by this section and the rules and

25

regulations as are promulgated pursuant to § 42-98-7. An application meeting these requirements

26

shall then be docketed. Any application deemed must meet every requirement of this section and

27

all applicable regulations in order to be docketed; no application will be docketed that does not

28

satisfy every requirement of this section and all applicable regulations. If the application is in the

29

form and addresses all matters that are required by this section and the rules and regulations

30

promulgated pursuant to § 42-98-7, then the application shall be docketed. Any application

31

deemed to be deficient shall be returned to the applicant, together with a concise and explicit

32

statement of the application's deficiencies. Within thirty (30) days of the resubmission of an

33

application following a rejection for deficiency, the board shall notify the applicant if the

34

application is still deficient by returning it to the applicant together with a concise and explicit

 

LC005383 - Page 9 of 19

1

statement of the application's deficiencies. If a resubmitted application is in the form and

2

addresses all matters that are required by this section and the rules and regulations as are

3

promulgated pursuant to § 42-98-7, then the board shall docket the resubmitted application

4

together with the correspondence from the board specifying the deficiencies in all earlier

5

applications. The application may be resubmitted once all identified deficiencies have been

6

remedied. Within fifteen (15) days of the resubmission of an application following a rejection for

7

deficiency, the board shall docket the application together with specification of continuing

8

deficiencies noted by the board, if any.

9

     42-98-9. Applications -- Procedures for review -- Preliminary hearing.

10

     (a) Within sixty (60) days following the board's docketing of an application the board

11

shall, on not less than forty-five (45) days' notice to all agencies, subdivisions of the state, and the

12

public, convene a preliminary hearing on the application to determine the issues to be considered

13

by the board in evaluating the application, and to designate those agencies of state government

14

and of political subdivisions of the state which shall act at the direction of the board for the

15

purpose of rendering advisory opinions on these issues, and to determine petitions for

16

intervention.

17

     (b) The board shall consider as issues in every proceeding the ability of the proposed

18

facility to meet the requirements of the laws, rules, regulations, and ordinances under which,

19

absent this chapter, the applicant would be required to obtain a permit, license, variance, or

20

assent. The agency of state government or of a political subdivision of the state which, absent this

21

chapter, would have statutory authority to grant or deny the permit, license, variance, or assent,

22

shall function at the direction of the board for hearing the issue and rendering an advisory opinion

23

thereon.

24

     (c) The board shall limit the scope of any agency's investigation where it finds that more

25

than one agency has jurisdiction over a matter at issue in the licensing process. In these instances,

26

the board shall determine which agency shall make the necessary findings on the issue after

27

giving proper consideration to the expertise and resources available to each of the agencies

28

involved.

29

     (d) The public utilities commission shall conduct an investigation in which the division of

30

planning of the department of administration, the governor's office of energy resources assistance

31

and the division of public utilities and carriers shall participate and render an advisory opinion as

32

to the need for the proposed facility.

33

     (e) The statewide planning program within the department of administration shall

34

conduct an investigation and render an advisory opinion as to the socio-economic impact of the

 

LC005383 - Page 10 of 19

1

proposed facility and its construction and consistency with the state guide plan. This investigation

2

shall include review of municipal comprehensive plans for all host communities to ensure the

3

proposed project conforms to each municipal comprehensive plan.

4

     (f) The board shall seek advisory opinions from the zoning, planning, and building

5

departments of each host community. The board shall also seek advisory opinions from all public

6

utilities serving the facility, including, but not limited to, water, sewer, electric and gas. Advisory

7

opinions from municipal entities shall include a study of the financial impact of the proposed

8

facility on local services, infrastructure, and all public and private property located within three

9

(3) miles of the proposed site boundaries. No advisory opinion shall be sought until the

10

application is docketed.

11

     (f)(g) A decision of the board under this section shall be issued within thirty (30) days

12

following the conclusion of the preliminary hearing and in any event within forty-five (45) days

13

of the commencement of the hearing.

14

     42-98-9.1. Public notice and hearings on construction projects in cities and towns

15

affected.

16

     (a) The applicant shall notify each host community no less than thirty (30) days prior to

17

filing its application with the board.

18

     (a)(b) Upon receiving a utility company application the board shall immediately notify, in

19

writing, the councils of the towns and cities affected by the construction. This includes, but is not

20

limited to, each host community.

21

     (b)(c) The board shall have at least one three (3) public hearing hearings in each town or

22

city affected host community prior to holding its own hearings and prior to taking final action on

23

the application. All details of acceptance for filing in § 42-98-8(a)(1) -- (a)(6)(7) shall be

24

presented at town or city hearings for public comment. No public hearing shall occur until the

25

application is deemed sufficient and docketed by the board as required in § 42-98-8(b). Public

26

hearings shall be held within six (6) months of the date the application is docketed by the board.

27

When the subject of the application is a facility for the generation of electricity, or new facilities

28

for the transmission of electricity, the town or city each host community, including quasi-

29

municipal corporations within the host community, where the proposed facility would be located

30

may request funding from the applicant to perform studies of the local environmental effects of

31

the proposed facility. The expense of those studies shall not exceed the greater of the lesser of one

32

hundred thousand dollars ($100,000) two hundred thousand dollars ($200,000) or one-tenth

33

percent (.1%) of the estimated capital cost of the proposed facility.located in such city or town. If

34

the applicant contests the relevance of the requested study, or believes it to be redundant with

 

LC005383 - Page 11 of 19

1

studies already performed, the applicant may request a ruling from the board whether the study is

2

necessary and reasonably expected to produce relevant information. The board's ruling shall be

3

conclusive and final, and shall not be the basis for an interlocutory appeal, injunction or otherwise

4

delay the board's processing of the application. The applicant shall also pay any and all fees and

5

expenses reasonably incurred by each host community, including quasi-municipal corporations

6

within the host community, to fully participate in the facility siting process, and local review,

7

including, but not limited to, fees and expenses for legal counsel, expert evaluations, transcripts

8

and other costs associated with the entire facility siting process.

9

     (c)(d) The applicant shall notify the citizens in towns and cities affected thirty (30) days

10

prior to public meetings through local papers. Newspaper notices shall be at least one-half (1/2)

11

page in size, and shall include a map depicting the project and all associated corridors. If the

12

board determines that any notice was substantially inaccurate, then the board may order an

13

additional hearing with appropriate notice.

14

     (d)(e) The applicant shall notify abutting the following land owners individually, in

15

writing, thirty (30) days prior to the any hearings, by certified mail, postage prepaid.:

16

     (1) For proposed or existing electric generating facilities, applicants shall notify all land

17

owners whose property is located within three (3) miles of the proposed site boundaries;

18

     (2) For all other projects, applicants shall notify all land owners whose property is located

19

within one mile from the proposed project or corridor.

20

     (e)(f) Public input shall be a part of the decision-making process.

21

     42-98-10. Agency procedures -- Advisory opinion.

22

     (a) Each agency of the state or political subdivision of the state designated under § 42-98-

23

9 shall proceed to consider the issue or issues consigned to it for review. Each agency shall

24

conclude its consideration and issue its advisory opinion not more than six (6) months following

25

its designation under § 42-98-9, and receipt of all details required under § 42-98-8(a)(1) through

26

(a)(7), or any lesser time that the board may require, or the right to exercise the function shall be

27

forfeited to the board. If sufficient details to allow agencies to consider and issue advisory

28

opinions are unavailable for any reason, the application proceeding shall be suspended for up to

29

sixty (60) days to allow sufficient details to be submitted by the applicant. If, at the end of sixty

30

(60) days, sufficient details have not been provided in writing, the application shall be denied.

31

The applicant may refile its applications no sooner than sixty (60) days from the date of denial.

32

     (b) Advisory opinions issued by agencies designated under § 42-98-9 shall not be

33

considered as final decisions of the agencies making the opinions, and shall not be subject to

34

judicial review under § 42-35-15, or any other provision of the general laws.

 

LC005383 - Page 12 of 19

1

     (c) Advisory opinions issued by zoning boards of review, building inspectors, or any

2

other agency of a municipality designated under § 42-98-9 shall not be reviewable by the public

3

utilities commission under § 39-1-30.

4

     (d) Failure or refusal of the applicant to provide requested information may shall be

5

considered as grounds for recommending denial.

6

     (e) At the request of the siting board, the director of environmental management and the

7

coastal resources management council shall give priority to the review of permits for energy

8

facilities.

9

     (f) Any town or city council may submit to the board a resolution setting forth the

10

council’s support or opposition to the project at any time after the application is docketed by the

11

board and no later than thirty (30) days following the submission of advisory opinions, unless an

12

extension is granted by the board for good cause shown.

13

     42-98-11. Final hearing -- Standards -- Decisions.

14

     (a) Within forty-five (45) days after the final date for submission of advisory opinions

15

pursuant to § 42-98-10, the board shall convene the final hearing on the application. The purpose

16

of this hearing shall not be to rehear the evidence which was presented previously in hearings

17

before agencies designated under § 42-98-9, but rather to provide the applicant, intervenors, the

18

public, and all other parties in the proceeding, the opportunity to address in a single forum, and

19

from a consolidated, statewide prospective, the issues reviewed, and the recommendations made

20

in the proceedings before the agencies designated under § 42-98-9. The board at this hearing may,

21

at its discretion, allow the presentation of new evidence by any party, including intervenors, as to

22

the issues considered by the agencies designated under § 42-98-9. The board may limit the

23

presentation of repetitive or cumulative evidence. The hearing shall proceed on not less than

24

thirty (30) days' notice to the parties and the public, shall be concluded not more than sixty (60)

25

days following its initiation, and shall be conducted expeditiously.

26

     (b) The board shall issue a decision granting a license only upon finding that the

27

applicant has shown that:

28

     (1) Construction of the proposed facility is necessary to meet the needs of the state and/or

29

region for energy of the type to be produced by the proposed facility.

30

     (2) The proposed facility is cost-justified, and can be expected to produce energy at the

31

lowest reasonable cost to the consumer consistent with the objective of ensuring that the

32

construction and operation of the proposed facility will be accomplished in compliance with all of

33

the requirements of the laws, rules, regulations, and ordinances, under which, absent this chapter,

34

a permit, license, variance, or assent would be required, or that consideration of the public health,

 

LC005383 - Page 13 of 19

1

safety, welfare, security and need for the proposed facility justifies a waiver of some part of the

2

requirements when compliance cannot be assured.

3

     (3) The proposed facility will not cause unacceptable harm to the environment, will not

4

prevent the state from reaching its greenhouse gas emissions reduction target in the Resilient

5

Rhode Island Act of 2014, § 42-6.2-1 et seq., and will enhance the socio-economic fabric of the

6

state.

7

     (c) The board shall not issue a decision granting a license to any applicant unless the

8

board has thoroughly considered whether construction of the proposed facility will adversely

9

impact the ability of the state to achieve the carbon-emissions-reduction goals set forth in § 42-

10

6.2-2(a)(2).

11

     (d) Prior to the making of a decision, the board shall take into consideration any town or

12

city council resolution regarding the application. Where a host community is already burdened

13

by one or more fossil fuel energy facilities of eighty megawatts (80MW) or more, the board shall

14

abide by the town or city council’s wishes with regard to a proposed new facility, unless the

15

board is presented with clear and convincing evidence to the contrary.

16

     (e) Where multiple applications relate to a single project, the board shall consider the

17

cumulative impacts of the related applications.

18

     (c)(f) Within sixty (60) days of the conclusion of the final hearing the board shall issue its

19

final decision on the application. A decision in favor of the application shall constitute a granting

20

of all permits, licenses, variances, appraisals, or assents, which under any law, rule, regulation, or

21

ordinance of the state or of a political subdivision thereof which would, absent this chapter, be

22

required for the proposed facility. The decision may be issued requiring any modification or

23

alteration of the proposed facility, and may be issued on any condition the board deems warranted

24

by the record, and may be issued conditional upon the applicant's receipt of permits required by

25

federal law. The board's decision shall explicitly address each of the advisory opinions received

26

from agencies, and the board's reasons for accepting, rejecting, or modifying, in whole or in part,

27

any of those advisory opinions; any resolution from a host community, and the board's reasons

28

for accepting or rejecting that resolution. The board shall, within ten (10) days of granting a

29

license, with or without conditions, deliver the decision to the speaker of the Rhode Island house

30

of representatives, and the president of the Rhode Island senate.

31

     42-98-12. Appeals and judicial review.

32

     (a) The licensing decision issued by the siting board shall constitute the sole, final,

33

binding, and determinative regulatory decision within the state for the purposes of siting,

34

building, operating, or altering a major energy facility.

 

LC005383 - Page 14 of 19

1

     (b) Any person aggrieved by a decision of the board may within ten (10) thirty (30) days

2

from the date of ratification of the decision, obtain judicial review of the decision in the manner

3

and according to the standards and procedures provided in chapter 5 of title 39. appeal the

4

decision to the Rhode Island supreme court by filing a notice of appeal with the board and the

5

supreme court.

6

     42-98-16. Violations.

7

     (a) Failure to comply with any promulgated board rule, regulation, requirement or

8

procedure for the licensing of energy facilities shall constitute grounds for suspension or

9

dismissal, with or without prejudice in its discretion, of licensing proceedings, provided that the

10

applicant shall have a reasonable opportunity to show cause for and remedy the lack of

11

compliance.

12

     (b) Failure to comply with any provision, condition or limitation contained in a board

13

license to site, build, or alter a major energy facility and/or failure to comply with a board cease

14

and desist order and/or a board order to remedy a non-complying action shall be grounds for

15

suspension or revocation of the license, and/or shall be punishable by a fine of not more than

16

twenty thousand dollars ($20,000) fifty thousand dollars ($50,000). Each day of continuing

17

noncompliance shall be considered a separate violation and so punished.

18

     (c) The board may require the licensee to maintain those records as are reasonable and

19

necessary to monitor compliance with license provisions, and shall have the authority to enter

20

onto the property of licensees to investigate complaints of noncompliance and to perform routine

21

inspections.

22

     (d) The board shall take reasonable steps to ensure each facility for which a certificate

23

has been issued is constructed, maintained, and operated in compliance with such certificate and

24

any other standard established pursuant to this chapter. The board may designate officials or staff

25

of any state agencies as its agents for the purposes of investigating complaints, performing

26

routine maintenance functions and issuing written cease and desist orders.

27

     (e) Any license may be revoked or suspended for any materially false statement in the

28

application or supplemental submissions by the applicant when a true answer would have

29

warranted the board’s refusal to issue a license in the first instance.

30

     (f) Civil proceedings to enforce this chapter may be brought by the attorney general or

31

any host community in the superior court.

32

     (g) Nothing in this chapter shall preclude a host community from enforcing municipal

33

ordinances, levying fines, or pursuing any other legally available enforcement remedies, unless

34

such ordinances are in direct conflict with a certificate or license issued by the board.

 

LC005383 - Page 15 of 19

1

     42-98-17. Appropriation, fees and grants.

2

     (a) There is created an account to be known as the "energy facility siting account", an

3

account within the public utilities commission in the general fund, hereinafter referred to as the

4

"account", for the purpose of providing the financial means for the board to purchase materials

5

and to employ on a contract or other basis legal counsel, official stenographers, engineers,

6

accountants, and expert witnesses and for other necessary expenses of the board in investigations

7

and hearings on applications for licensure under this chapter. The general assembly shall annually

8

appropriate to the account the amounts as may be required to bring the balance of the account to

9

the sum of one hundred thousand dollars ($100,000); provided, however, that if at June 30 in any

10

year the balance in the account shall be in excess of one hundred thousand dollars ($100,000), the

11

amount of the excess shall be transferred to the general account of the state. The controller is

12

authorized and directed to draw his or her orders upon the general treasurer for the payment from

13

the account of the sums as may be required from time to time upon receipt by the controller of

14

proper vouchers approved by the chairperson of the board or the secretary.

15

     (b) The board shall be authorized to establish reasonable fees for investigations,

16

applications and hearings. Applicants shall pay those fees in full prior to the hearing process

17

commencing unless the board agrees to an alternative payment schedule. All fees collected by the

18

board shall be deposited with the general treasurer and appropriated to the board. The state

19

controller is authorized and directed to draw his or her orders upon the general treasurer for

20

payment of any sum or sums as may be necessary from time to time and upon receipt by him or

21

her of authenticated vouchers presented by the coordinator of the board.

22

     (c) All moneys collected by the chairperson or the secretary pursuant to this section shall

23

be paid by him or her monthly to the general treasurer to be added to the energy facility siting

24

account.

25

     (d) Failure of the applicant to pay expenses lawfully assessed by the board shall

26

constitute grounds for suspension of licensing proceedings or revocation of any license granted,

27

until the applicant has paid the expenses.

28

     (e) The board shall be empowered to draw upon this account and to distribute monies

29

from the fees to and bodies of state and local government participating in licensing actions or

30

acting as the board's agents for the purposes of insuring compliance with license provisions and

31

for employing staff or consultants and for carrying out the provisions of this chapter.

32

     (f) The board shall be authorized to receive any grants made for the purpose of planning

33

for or regulating the siting of energy facilities and to disburse and administer the grants under the

34

terms of the grants.

 

LC005383 - Page 16 of 19

1

     (g) The board shall not issue a license to build a new fossil-fuel electric generating

2

facility unless the applicant demonstrates it has satisfied the following requirements:

3

     (1) Applicant shall provide adequate funds for the host community’s fire marshal to

4

retain at least one special inspector to assist the host community’s fire marshal, for the duration of

5

the construction project; and

6

     (2) Applicant shall provide adequate funds to be used in the training of local public safety

7

and emergency management personnel in the host community, including quasi-municipal

8

corporations within the host community, and personnel from neighboring communities which

9

would likely provide mutual aid within the host community, on the complex issues of electric

10

generating facility construction and operation.

11

     (h) The special inspector retained under subsection (g) of this section shall:

12

     (1) Be approved by the board and not otherwise employed by or financially involved in

13

the construction or operation of the facility;

14

     (2) Have knowledge and field experience in electric generating facility construction; and

15

     (3) Assist the local fire marshal with review and approval of an appropriate safety plan

16

for the electric generating facility, and conduct inspections during construction of the facility to

17

ensure compliance with certificates and safety standards.

18

     42-98-20. Informational filings.

19

     (a) To assist the board in achieving the policy objectives set forth in § 42-98-2, the

20

owners of any proposed energy facility, whether or not the facility qualified as a major energy

21

facility, shall make an informational filing with the board at the time of first application to any

22

other agency, board, council, or commission of the state or political subdivision of the state

23

required to issue a permit, license, assent, or variance in order for the siting, construction, or

24

alteration of the facility to proceed. Copies of any informational filing shall be provided to the

25

councils of the towns and cities affected by the proposed facility within seven (7) days of filing

26

with the board.

27

     (b) The informational filing shall contain at least the following:

28

     (1) Identification of the proposed owner(s) of the facility, including identification of all

29

affiliates of the proposed owners, as the term is defined in § 39-3-27.

30

     (2) Detailed description of the proposed facility, including its function and operating

31

characteristics, and complete plans as to all structures, including underground construction and

32

transmission facilities, underground or aerial, associated with the proposed facility.

 

LC005383 - Page 17 of 19

1

     SECTION 3. This act shall take effect on January 1, 2019.

========

LC005383

========

 

LC005383 - Page 18 of 19

EXPLANATION

BY THE LEGISLATIVE COUNCIL

OF

A N   A C T

RELATING TO STATE AFFAIRS AND GOVERNMENT - ENERGY FACILITY SITING

ACT

***

1

     This act would make changes to the membership of the energy facilities siting board by

2

increasing the size of the board from three (3) to nine (9) members, and also imposes additional

3

requirements on applicants for energy facilities.

4

     This act would take effect on January 1, 2019.

========

LC005383

========

 

LC005383 - Page 19 of 19