2022 -- H 6662

========

LC003615

========

     STATE OF RHODE ISLAND

IN GENERAL ASSEMBLY

JANUARY SESSION, A.D. 2022

____________

A N   A C T

RELATING TO PUBLIC UTILITIES AND CARRIERS -- NET METERING

     

     Introduced By: Representatives Potter, Baginski, Felix, Batista, Ruggiero, Speakman,
Knight, Kislak, Shallcross Smith, and Fogarty

     Date Introduced: January 06, 2022

     Referred To: House Corporations

     It is enacted by the General Assembly as follows:

1

     SECTION 1. Sections 39-26.4-2 and 39-26.4-3 of the General Laws in Chapter 39-26.4

2

entitled "Net Metering" are hereby amended to read as follows:

3

     39-26.4-2. Definitions.

4

     Terms not defined in this section herein shall have the same meaning as contained in

5

chapter 26 of this title. When used in this chapter:

6

     (1) "Community remote net-metering system" means a facility generating electricity using

7

an eligible net-metering resource that allocates net-metering credits to a minimum of one account

8

for a system associated with low- or moderate-income housing eligible credit recipients, or three

9

(3) eligible credit-recipient customer accounts, provided that no more than fifty percent (50%) of

10

the credits produced by the system are allocated to one eligible credit recipient, and provided further

11

at least fifty percent (50%) of the credits produced by the system are allocated to the remaining

12

eligible credit recipients in an amount not to exceed that which is produced annually by twenty-

13

five kilowatt (25 KW) AC capacity. The community remote net-metering system may transfer

14

credits to eligible credit recipients in an amount that is equal to or less than the sum of the usage of

15

the eligible credit recipient accounts measured by the three-year (3) average annual consumption

16

of energy over the previous three (3) years. A projected annual consumption of energy may be used

17

until the actual three-year (3) average annual consumption of energy over the previous three (3)

18

years at the eligible credit recipient accounts becomes available for use in determining eligibility

19

of the generating system. The community remote net-metering system may be owned by the same

 

1

entity that is the customer of record on the net-metered account or may be owned by a third party.

2

     (2) "Electric distribution company" shall have the same meaning as § 39-1-2, but shall not

3

include Block Island Power Company or Pascoag Utility District, each of whom shall be required

4

to offer net metering to customers through a tariff approved by the public utilities commission after

5

a public hearing. Any tariff or policy on file with the public utilities commission on the date of

6

passage of this chapter shall remain in effect until the commission approves a new tariff.

7

     (3) "Eligible credit recipient" means one of the following eligible recipients in the electric

8

distribution company's service territory whose electric service account or accounts may receive net-

9

metering credits from a community remote net-metering system. Eligible credit recipients include

10

the following definitions:

11

     (i) Residential accounts in good standing.

12

     (ii) "Low- or moderate-income housing eligible credit recipient" means an electric service

13

account or accounts in good standing associated with any housing development or developments

14

owned or operated by a public agency, nonprofit organization, limited-equity housing cooperative,

15

or private developer that receives assistance under any federal, state, or municipal government

16

program to assist the construction or rehabilitation of housing affordable to low- or moderate-

17

income households, as defined in the applicable federal or state statute, or local ordinance,

18

encumbered by a deed restriction or other covenant recorded in the land records of the municipality

19

in which the housing is located, that:

20

     (A) Restricts occupancy of no less than fifty percent (50%) of the housing to households

21

with a gross, annual income that does not exceed eighty percent (80%) of the area median income

22

as defined annually by the United States Department of Housing and Urban Development (HUD);

23

     (B) Restricts the monthly rent, including a utility allowance, that may be charged to

24

residents, to an amount that does not exceed thirty percent (30%) of the gross, monthly income of

25

a household earning eighty percent (80%) of the area median income as defined annually by HUD;

26

     (C) Has an original term of not less than thirty (30) years from initial occupancy.

27

     Electric service account or accounts in good standing associated with housing

28

developments that are under common ownership or control may be considered a single low- or

29

moderate-income housing eligible credit recipient for purposes of this section. The value of the

30

credits shall be used to provide benefits to tenants.

31

     (iii) "Educational institutions" means public and private schools at the primary, secondary,

32

and postsecondary levels.

33

     (4) "Eligible net-metering resource" means eligible renewable energy resource, as defined

34

in § 39-26-5 including biogas created as a result of anaerobic digestion, but, specifically excluding

 

LC003615 - Page 2 of 11

1

all other listed eligible biomass fuels.

2

     (5) "Eligible net-metering system" means a facility generating electricity using an eligible

3

net-metering resource that is reasonably designed and sized to annually produce electricity in an

4

amount that is equal to, or less than, the renewable self-generator's usage at the eligible net-metering

5

system site measured by the three-year (3) average annual consumption of energy over the previous

6

three (3) years at the electric distribution account(s) located at the eligible net-metering system site.

7

A projected annual consumption of energy may be used until the actual three-year (3) average

8

annual consumption of energy over the previous three (3) years at the electric distribution

9

account(s) located at the eligible net-metering system site becomes available for use in determining

10

eligibility of the generating system. The eligible net-metering system may be owned by the same

11

entity that is the customer of record on the net-metered accounts or may be owned by a third party

12

that is not the customer of record at the eligible net-metering system site and which may offer a

13

third-party, net-metering financing arrangement or net-metering financing arrangement, as

14

applicable. Notwithstanding any other provisions of this chapter, any eligible net-metering

15

resource: (i) Owned by a public entity, educational institution, hospital, nonprofit, or multi-

16

municipal collaborative or (ii) Owned and operated by a renewable-generation developer on behalf

17

of a public entity, educational institution, hospital, nonprofit, or multi-municipal collaborative

18

through a net-metering financing arrangement shall be treated as an eligible net-metering system

19

and all accounts designated by the public entity, educational institution, hospital, nonprofit, or

20

multi-municipal collaborative for net metering shall be treated as accounts eligible for net metering

21

within an eligible net-metering system site.

22

     (6) "Eligible net-metering system site" means the site where the eligible net-metering

23

system or community remote net-metering system is located or is part of the same campus or

24

complex of sites contiguous to one another and the site where the eligible net-metering system or

25

community remote net-metering system is located or a farm in which the eligible net-metering

26

system or community remote net-metering system is located. Except for an eligible net-metering

27

system owned by or operated on behalf of a public entity, educational institution, hospital,

28

nonprofit, or multi-municipal collaborative through a net-metering financing arrangement, the

29

purpose of this definition is to reasonably assure that energy generated by the eligible net-metering

30

system is consumed by net-metered electric service account(s) that are actually located in the same

31

geographical location as the eligible net-metering system. All energy generated from any eligible

32

net-metering system is, and will be considered, consumed at the meter where the renewable energy

33

resource is interconnected for valuation purposes. Except for an eligible net-metering system

34

owned by, or operated on behalf of, a public entity, educational institution, hospital, nonprofit, or

 

LC003615 - Page 3 of 11

1

multi-municipal collaborative through a net-metering financing arrangement, or except for a

2

community remote net-metering system, all of the net-metered accounts at the eligible net-metering

3

system site must be the accounts of the same customer of record and customers are not permitted

4

to enter into agreements or arrangements to change the name on accounts for the purpose of

5

artificially expanding the eligible net-metering system site to contiguous sites in an attempt to avoid

6

this restriction. However, a property owner may change the nature of the metered service at the

7

accounts at the site to be master metered in the owner's name, or become the customer of record

8

for each of the accounts, provided that the owner becoming the customer of record actually owns

9

the property at which the account is located. As long as the net-metered accounts meet the

10

requirements set forth in this definition, there is no limit on the number of accounts that may be net

11

metered within the eligible net-metering system site.

12

     (7) "Excess renewable net-metering credit" means a credit that applies to an eligible net-

13

metering system or community remote net-metering system for that portion of the production of

14

electrical energy beyond one hundred percent (100%) and no greater than one hundred twenty-five

15

percent (125%) of the renewable self-generator's own consumption at the eligible net-metering

16

system site or the sum of the usage of the eligible credit recipient accounts associated with the

17

community remote net-metering system during the applicable billing period. Such excess

18

renewable net-metering credit shall be equal to the electric distribution company's avoided cost

19

rate, which is hereby declared to be the electric distribution company's standard-offer service

20

kilowatt hour (KWh) charge for the rate class and time-of-use billing period (if applicable)

21

applicable to the customer of record for the eligible net-metering system or applicable to the

22

customer of record for the community remote net-metering system. The commission shall have the

23

authority to make determinations as to the applicability of this credit to specific generation facilities

24

to the extent there is any uncertainty or disagreement.

25

     (8) "Farm" shall be defined in accordance with § 44-27-2, except that all buildings

26

associated with the farm shall be eligible for net-metering credits as long as: (i) The buildings are

27

owned by the same entity operating the farm or persons associated with operating the farm; and (ii)

28

The buildings are on the same farmland as the project on either a tract of land contiguous with, or

29

reasonably proximate to, such farmland or across a public way from such farmland.

30

     (9) "Hospital" means and shall be defined and established as set forth in chapter 17 of title

31

23.

32

     (10) "Multi-municipal collaborative" means a group of towns and/or cities that enter into

33

an agreement for the purpose of co-owning a renewable-generation facility or entering into a

34

financing arrangement pursuant to subsection (14).

 

LC003615 - Page 4 of 11

1

     (11) "Municipality" means any Rhode Island town or city, including any agency or

2

instrumentality thereof, with the powers set forth in title 45.

3

     (12) "Net metering" means using electrical energy generated by an eligible net-metering

4

system for the purpose of self-supplying electrical energy and power at the eligible net-metering

5

system site, or with respect to a community remote net-metering system, for the purpose of

6

generating net-metering credits to be applied to the electric bills of the eligible credit recipients

7

associated with the community net-metering system. The amount so generated will thereby offset

8

consumption at the eligible net-metering system site through the netting process established in this

9

chapter, or with respect to a community remote net-metering system, the amounts generated in

10

excess of that amount will result in credits being applied to the eligible credit-recipient accounts

11

associated with the community remote net-metering system.

12

     (13) "Net-metering customer" means a customer of the electric distribution company

13

receiving and being billed for distribution service whose distribution account(s) are being net

14

metered.

15

     (14) "Net-metering financing arrangement" means arrangements entered into by a public

16

entity, educational institution, hospital, nonprofit, or multi-municipal collaborative with a private

17

entity to facilitate the financing and operation of a net-metering resource, in which the private entity

18

owns and operates an eligible net-metering resource on behalf of a public entity, educational

19

institution, hospital, nonprofit, or multi-municipal collaborative, where: (i) The eligible net-

20

metering resource is located on property owned or controlled by the public entity, educational

21

institution, hospital, or one of the municipalities, as applicable; and (ii) The production from the

22

eligible net-metering resource and primary compensation paid by the public entity, educational

23

institution, hospital, nonprofit, or multi-municipal collaborative to the private entity for such

24

production is directly tied to the consumption of electricity occurring at the designated net-metered

25

accounts.

26

     (15) "Nonprofit" means a nonprofit corporation as defined and established through chapter

27

6 of title 7, and shall include religious organizations that are tax exempt pursuant to 26 U.S.C. §

28

501(d).

29

     (16) "Person" means an individual, firm, corporation, association, partnership, farm, town

30

or city of the state of Rhode Island, multi-municipal collaborative, or the state of Rhode Island or

31

any department of the state government, governmental agency, or public instrumentality of the

32

state.

33

     (17) "Previously disturbed sites" means landfills, gravel pits, golf courses, brownfields,

34

carports, parking lots, and rooftops including, commercial, industrial and municipal buildings.

 

LC003615 - Page 5 of 11

1

     (17)(18) "Project" means a distinct installation of an eligible net-metering system or a

2

community remote net-metering system. An installation will be considered distinct if it is installed

3

in a different location, or at a different time, or involves a different type of renewable energy.

4

     (18)(19) "Public entity" means the federal government, the state of Rhode Island,

5

municipalities, wastewater treatment facilities, public transit agencies, or any water distributing

6

plant or system employed for the distribution of water to the consuming public within this state

7

including the water supply board of the city of Providence.

8

     (19)(20) "Renewable net-metering credit" means a credit that applies to an eligible net-

9

metering system or a community remote net-metering system up to one hundred percent (100%) of

10

either the renewable self-generator's usage at the eligible net-metering system site or the sum of the

11

usage of the eligible credit-recipient accounts associated with the community remote net-metering

12

system over the applicable billing period. This credit shall be equal to the total kilowatt hours of

13

electrical energy generated up to the amount consumed on-site, and/or generated up to the sum of

14

the eligible credit-recipient account usage during the billing period multiplied by the sum of the

15

distribution company's:

16

     (i) Standard-offer service kilowatt-hour charge for the rate class applicable to the net-

17

metering customer, except that for remote public entity and multi-municipality collaborative net-

18

metering systems that submit an application for an interconnection study on or after July 1, 2017,

19

and community remote net-metering systems, the standard-offer service kilowatt-hour charge shall

20

be net of the renewable energy standard charge or credit;

21

     (ii) Distribution kilowatt-hour charge;

22

     (iii) Transmission kilowatt-hour charge; and

23

     (iv) Transition kilowatt-hour charge.

24

     Notwithstanding the foregoing, except for systems that have requested an interconnection

25

study for which payment has been received by the distribution company, or if an interconnection

26

study is not required, a completed and paid interconnection application, by December 31, 2018, the

27

renewable net-metering credit for all remote public entity and multi-municipal collaborative net-

28

metering systems shall not include the distribution kilowatt-hour charge commencing on January

29

1, 2050.

30

     (20)(21) "Renewable self-generator" means an electric distribution service customer of

31

record for the eligible net-metering system or community remote net-metering system at the eligible

32

net-metering system site which system is primarily designed to produce electrical energy for

33

consumption by that same customer at its distribution service account(s), and/or, with respect to

34

community remote net-metering systems, electrical energy which generates net-metering credits to

 

LC003615 - Page 6 of 11

1

be applied to offset the eligible credit-recipient account usage.

2

     (21)(22) "Third party" means and includes any person or entity, other than the renewable

3

self-generator, who or that owns or operates the eligible net-metering system or community remote

4

net-metering system on the eligible net-metering system site for the benefit of the renewable self-

5

generator.

6

     (22)(23) "Third-party, net-metering financing arrangement" means the financing of eligible

7

net-metering systems or community remote net-metering systems through lease arrangements or

8

power/credit purchase agreements between a third party and renewable self-generator, except for

9

those entities under a public entity net-metering financing arrangement. A third party engaged in

10

providing financing arrangements related to such net-metering systems with a public or private

11

entity is not a public utility as defined in § 39-1-2.

12

     39-26.4-3. Net metering.

13

     (a) The following policies regarding net metering of electricity from eligible net-metering

14

systems and community remote net-metering systems and regarding any person that is a renewable

15

self-generator shall apply:

16

     (1)(i) The maximum allowable capacity for eligible net-metering systems, based on

17

nameplate capacity, shall be ten megawatts (10 MW), effective sixty (60) days after passage. The

18

aggregate amount of net metering in the Block Island Power Company and the Pascoag Utility

19

District shall not exceed three percent (3%) of peak load for each utility district; and

20

     (ii) Through December 31, 2018, the maximum aggregate amount of community remote

21

net-metering systems built shall be thirty megawatts (30 MW). Any of the unused MW amount

22

after December 31, 2018, shall remain available to community remote net-metering systems until

23

the MW aggregate amount is interconnected. After December 31, 2018, the commission may

24

expand or modify the aggregate amount after a public hearing upon petition by the office of energy

25

resources. The commission shall determine within six (6) months of such petition being docketed

26

by the commission whether the benefits of the proposed expansion exceed the cost. This aggregate

27

amount shall not apply to any net-metering financing arrangement involving public entity facilities,

28

multi-municipal collaborative facilities, educational institutions, the federal government,

29

hospitals, or nonprofits. By June 30, 2018, the commission shall conduct a study examining the

30

cost and benefit to all customers of the inclusion of the distribution charge as a part of the net-

31

metering calculation.; and

32

     (iii) Effective immediately, an additional thirty megawatts (30 MW) shall be added to the

33

existing community remote net-metering program, "community remote net-metering expansion,"

34

bringing the maximum aggregate amount of community remote net-metering system to sixty

 

LC003615 - Page 7 of 11

1

megawatts (60 MW). Projects shall be allocated program capacity on a first-come, first-served basis

2

based on the community net-metering waiting list. Neither the commission, the electric distribution

3

company nor any other entity shall require more than one-half (½) of the expansion to be located

4

on previously disturbed sites. Each community remote net-metering system that receives an

5

allocation in the expansion shall be subject to the following requirements:

6

     (A) Provide bill credits of a minimum of thirty-five percent (35%) of project capacity or

7

thirty-five percent (35%) of project savings to low- or moderate-income households defined as:

8

being on the A-60 rate class; or participating in a low-income discount program, including, but not

9

limited to, the Low Income Home Energy Assistance Program, Medicaid, Supplemental Nutrition

10

Assistance Program, Rhode Island Works, Child Care Assistance Program, general public

11

assistance, Good Neighbor Energy Fund, or the Universal Service Fund; or living in a zip code

12

where the median household income is at or below two hundred percent (200%) of the federal

13

poverty level or that is at the top fifteen percent (15%) of the region for low-income residents; or

14

living in a low-income master-metered building; or living in qualifying low-income housing

15

pursuant to § 44-5-13.11; or by self-attestation; or any combination of the above. The commission

16

shall promulgate rules and regulations that establish requirements associated with the manner of

17

obtaining and the terms for retaining such customers and the commission may establish penalties

18

for failure to meet the requirements of this subsection;

19

     (B) The community remote net-metering system must provide proof of project maturity

20

by providing a copy of a completed distribution level impact study or a fully executed

21

interconnection services agreement and evidence that applicable municipal planning and zoning

22

approvals, and department of environmental management wetland permits, are complete;

23

     (C) Notwithstanding the foregoing, in no case may multiple distributed generation projects

24

be located on one or more contiguous parcels, unless the total capacity of the co-located projects is

25

less than or equal to ten megawatts (10 MW) in aggregate for projects that have submitted a

26

community remote net-metering application to the electric distribution company by December 31,

27

2022, and less than or equal to five megawatts (5 MW) in aggregate for projects that have submitted

28

a community remote net-metering application to the electric distribution company by December

29

31, 2023, and thereafter.

30

     (D) The community remote net-metering system must transfer to the electric distribution

31

company rights to the capacity that are created or produced by the project. The electric distribution

32

company shall:

33

     (I) Sell any products acquired and credit them against the surcharge in § 39-26.4-3(c);

34

     (II) Use the products to serve customers and establish a price to be credited by customers

 

LC003615 - Page 8 of 11

1

using the products based on recent and near-term projections of market prices; or

2

     (III) Use them in a manner specified by the commission; and

3

     (E) Community remote net-metering systems enrolled on and after January 1, 2023, shall

4

be eligible to receive renewable net-metering credits for a term of twenty-five (25) years.

5

Thereafter, the system shall receive the avoided cost rate for the output of the system as defined in

6

§ 39-26.4-2(7).

7

     (2) For ease of administering net-metered accounts and stabilizing net-metered account

8

bills, the electric distribution company may elect (but is not required) to estimate for any twelve-

9

month (12) period:

10

     (i) The production from the eligible net-metering system or community remote net-

11

metering system; and

12

     (ii) Aggregate consumption of the net-metered accounts at the eligible net-metering system

13

site or the sum of the consumption of the eligible credit-recipient accounts associated with the

14

community remote net-metering system, and establish a monthly billing plan that reflects the

15

expected credits that would be applied to the net-metered accounts over twelve (12) months. The

16

billing plan would be designed to even out monthly billings over twelve (12) months, regardless of

17

actual production and usage. If such election is made by the electric distribution company, the

18

electric distribution company would reconcile payments and credits under the billing plan to actual

19

production and consumption at the end of the twelve-month (12) period and apply any credits or

20

charges to the net-metered accounts for any positive or negative difference, as applicable. Should

21

there be a material change in circumstances at the eligible net-metering system site or associated

22

accounts during the twelve-month (12) period, the estimates and credits may be adjusted by the

23

electric distribution company during the reconciliation period. The electric distribution company

24

also may elect (but is not required) to issue checks to any net-metering customer in lieu of billing

25

credits or carry-forward credits or charges to the next billing period. For residential-eligible net-

26

metering systems and community remote net-metering systems twenty-five kilowatts (25 KW) or

27

smaller, the electric distribution company, at its option, may administer renewable net-metering

28

credits month to month allowing unused credits to carry forward into the following billing period.

29

     (3) If the electricity generated by an eligible net-metering system or community remote

30

net-metering system during a billing period is equal to, or less than, the net-metering customer's

31

usage at the eligible net-metering system site or the sum of the usage of the eligible credit-recipient

32

accounts associated with the community remote net-metering system during the billing period, the

33

customer shall receive renewable net-metering credits, that shall be applied to offset the net-

34

metering customer's usage on accounts at the eligible net-metering system site, or shall be used to

 

LC003615 - Page 9 of 11

1

credit the eligible credit-recipient's electric account.

2

     (4) If the electricity generated by an eligible net-metering system or community remote

3

net-metering system during a billing period is greater than the net-metering customer's usage on

4

accounts at the eligible net-metering system site or the sum of the usage of the eligible credit-

5

recipient accounts associated with the community remote net-metering system during the billing

6

period, the customer shall be paid by excess renewable net-metering credits for the excess

7

electricity generated up to an additional twenty-five percent (25%) beyond the net-metering

8

customer's usage at the eligible net-metering system site, or the sum of the usage of the eligible

9

credit-recipient accounts associated with the community remote net-metering system during the

10

billing period; unless the electric distribution company and net-metering customer have agreed to

11

a billing plan pursuant to subsection (a)(2).

12

     (5) The rates applicable to any net-metered account shall be the same as those that apply

13

to the rate classification that would be applicable to such account in the absence of net metering,

14

including customer and demand charges, and no other charges may be imposed to offset net-

15

metering credits.

16

     (b) The commission shall exempt electric distribution company customer accounts

17

associated with an eligible net-metering system from back-up or standby rates commensurate with

18

the size of the eligible net-metering system, provided that any revenue shortfall caused by any such

19

exemption shall be fully recovered by the electric distribution company through rates.

20

     (c) Any prudent and reasonable costs incurred by the electric distribution company

21

pursuant to achieving compliance with subsection (a) and the annual amount of any renewable net-

22

metering credits or excess renewable net-metering credits provided to accounts associated with

23

eligible net-metering systems or community remote net-metering systems, shall be aggregated by

24

the distribution company and billed to all distribution customers on an annual basis through a

25

uniform, per-kilowatt-hour (KWh) surcharge embedded in the distribution component of the rates

26

reflected on customer bills.

27

     (d) The billing process set out in this section shall be applicable to electric distribution

28

companies thirty (30) days after the enactment of this chapter.

29

     SECTION 2. This act shall take effect upon passage.

========

LC003615

========

 

LC003615 - Page 10 of 11

EXPLANATION

BY THE LEGISLATIVE COUNCIL

OF

A N   A C T

RELATING TO PUBLIC UTILITIES AND CARRIERS -- NET METERING

***

1

     This act would increase the maximum aggregate amount of community remote net-

2

metering systems from thirty megawatts (30 MW) to sixty megawatts (60 MW), and would require

3

the bill credits of a minimum of thirty-five percent (35%) of the generated power to utility

4

customers under applicable low-income discount programs. Projects would be allocated to the

5

programs on a first-come, first-served basis.

6

     This act would take effect upon passage.

========