2023 -- H 5041

========

LC000231

========

     STATE OF RHODE ISLAND

IN GENERAL ASSEMBLY

JANUARY SESSION, A.D. 2023

____________

A N   A C T

     RELATING TO EDUCATION -- FOUNDATION LEVEL SCHOOL SUPPORT

     

     Introduced By: Representatives Knight, and Boylan

     Date Introduced: January 11, 2023

     Referred To: House Finance

     It is enacted by the General Assembly as follows:

1

     SECTION 1. Section 16-7-40 of the General Laws in Chapter 16-7 entitled "Foundation

2

Level School Support [See Title 16 Chapter 97 — The Rhode Island Board of Education Act]" is

3

hereby amended to read as follows:

4

     16-7-40. Increased school housing ratio.

5

     (a)(1) In the case of regional school districts, the school housing aid ratio shall be increased

6

by two percent (2%) for each grade so consolidated.

7

     (2) Regional school districts undertaking renovation project(s) shall receive an increased

8

share ratio of four percent (4%) for those specific project(s) only, in addition to the combined share

9

ratio calculated in § 16-7-39 and this subsection.

10

     (b) In the case of projects undertaken by districts specifically for the purposes of school

11

safety and security, the school housing aid share ratio shall be increased by five percent (5%) for

12

these specific projects only, in the calculation of school housing aid. The increased share ratio shall

13

continue to be applied for as long as the project(s) receives state housing aid. In order to qualify for

14

the increased share ratio, seventy-five percent (75%) of the project costs must be specifically

15

directed to school safety and security measures. The council on elementary and secondary

16

education shall promulgate rules and regulations for the administration and operation of this

17

section.

18

     (c) For purposes of addressing health and safety deficiencies as defined by the school

19

building authority, including the remediation of hazardous materials, the school housing aid ratio

 

1

shall be increased by five percent (5%) so long as the construction of the project commences by

2

December 30, 2023, is completed by December 30, 2028, and a two hundred fifty million dollar

3

($250,000,000) general obligation bond is approved on the November 2018 ballot. In order to

4

qualify for the increased share ratio, twenty-five percent (25%) of the project costs or a minimum

5

of five hundred thousand dollars ($500,000) must be specifically directed to this purpose.

6

     (d) For purposes of educational enhancement, including projects devoted to the

7

enhancement of early childhood education and career and technical education, the school housing

8

aid ratio shall be increased by five percent (5%) so long as construction of the project commences

9

by December 30, 2023, is completed by December 30, 2028, and a two hundred fifty million dollar

10

($250,000,000) general obligation bond is approved on the November 2018 ballot. In order to

11

qualify for the increased share ratio, twenty-five percent (25%) of the project costs or a minimum

12

of five hundred thousand dollars ($500,000) must be specifically directed to these purposes.

13

     (e) For replacement of a facility that has a facilities condition index of sixty-five percent

14

(65%) or higher, the school housing ratio shall be increased by five percent (5%) so long as

15

construction of the project commences by December 30, 2023, is completed by December 30, 2028,

16

does not receive a bonus pursuant to subsection (f) or subsection (g), and a two hundred fifty million

17

dollar ($250,000,000) general obligation bond is approved on the November 2018 ballot. In order

18

to qualify for the increased share ratio, twenty-five percent (25%) of the project costs or a minimum

19

of five hundred thousand dollars ($500,000) must be specifically directed to this purpose.

20

     (f) For any new construction or renovation that increases the functional utilization of any

21

facility from less than sixty percent (60%) to more than eighty percent (80%), including the

22

consolidation of school buildings within or across districts, the school housing aid ratio shall be

23

increased by five percent (5%) so long as construction of the project commences by December 30,

24

2023, is completed by December 30, 2028, and a two hundred fifty million dollar ($250,000,000)

25

general obligation bond is approved on the November 2018 ballot. In order to qualify for the

26

increased share ratio, twenty-five percent (25%) of the project costs or a minimum of five hundred

27

thousand dollars ($500,000) must be specifically directed to this purpose.

28

     (g) For any new construction or renovation that decreases the functional utilization of any

29

facility from more than one hundred twenty percent (120%) to between eighty-five percent (85%)

30

to one hundred five percent (105%), the school housing ratio shall be increased by five percent

31

(5%) so long as construction of the project commences by December 30, 2023, is completed by

32

December 30, 2028, and a two hundred fifty million dollar ($250,000,000) general obligation bond

33

is approved on the November 2018 ballot. In order to qualify for the increased share ratio, twenty-

34

five percent (25%) of the project costs or a minimum of five hundred thousand dollars ($500,000)

 

LC000231 - Page 2 of 4

1

must be specifically directed to this purpose.

2

     (h) For consolidation of two (2) or more school buildings, within or across districts into

3

one school building, the school housing aid ratio shall be increased by five percent (5%) so long as

4

construction of the project commences by December 30, 2023, is completed by December 30, 2028,

5

a two hundred fifty million dollar ($250,000,000) general obligation bond is approved on the

6

November 2018 ballot, and does not receive a bonus pursuant to subsection (f) or subsection (g).

7

In order to qualify for the increased share ratio, twenty-five percent (25%) of the project costs or a

8

minimum of five hundred thousand dollars ($500,000) must be specifically directed to this purpose.

9

     (i) Any regionalized and/or non-regionalized school district receiving an increased share

10

ratio for a project approved prior to July 1, 2018, shall continue to receive the increased share ratio

11

for as long as the project receives state housing aid.

12

     (j) Provided, for the town of Barrington, the date by which construction of the project must

13

commence in order for the town to be eligible for the school housing aid ratio increases provided

14

for in subsections (a) through (h) of this section, shall be by December 30, 2024.

15

     SECTION 2. This act shall take effect upon passage.

========

LC000231

========

 

LC000231 - Page 3 of 4

EXPLANATION

BY THE LEGISLATIVE COUNCIL

OF

A N   A C T

     RELATING TO EDUCATION -- FOUNDATION LEVEL SCHOOL SUPPORT

***

1

     This act would provide that for the town of Barrington, the date by which construction of

2

a project must commence within Barrington in order to be eligible for the school housing aid ratio

3

increases would be by December 30, 2024.

4

     This act would take effect upon passage.

========

LC000231

========

 