2023 -- S 0537 SUBSTITUTE A

========

LC001149/SUB A

========

     STATE OF RHODE ISLAND

IN GENERAL ASSEMBLY

JANUARY SESSION, A.D. 2023

____________

A N   A C T

RELATING TO EDUCATION -- SCHOOL FUNDS AND PROPERTY

     

     Introduced By: Senators Pearson, Gallo, Acosta, Cano, Murray, DiPalma, Ruggerio,
Valverde, LaMountain, and DiMario

     Date Introduced: March 07, 2023

     Referred To: Senate Finance

     It is enacted by the General Assembly as follows:

1

     SECTION 1. Chapter 16-9 of the General Laws entitled "School Funds and Property" is

2

hereby amended by adding thereto the following section:

3

     16-9-11. New school construction and renovations.

4

     Not later than June 30, 2024, the department of education and the office of energy resources

5

are hereby authorized and directed to develop and adopt regulations requiring all school buildings

6

to meet the latest Northeast Collaborative for High Performance Schools (NE-CHPS) standard of

7

zero energy capable, as defined in § 16-7-36, by December 31, 2035.

8

     (1) The regulations shall allow flexibility to the furthest extent possible for local education

9

agencies to pursue state and federal funding sources that assist in financing energy efficiency or

10

renewable energy systems without any penalties or reduction in state housing aid provided by the

11

department of education.

12

     (2) Furthermore, for local education agencies that pursue federal funding for renewable

13

energy systems, the department’s regulations shall direct and provide further guidance to local

14

education agencies to build, own, and operate solar panels utilizing federal guidance established in

15

I.R.C. § 6417.

16

     SECTION 2. Sections 16-7-36, 16-7-39 16-7-40 and 16-7-41.1 of the General Laws in

17

Chapter 16-7 entitled "Foundation Level School Support [See Title 16 Chapter 97 — The Rhode

18

Island Board of Education Act]" are hereby amended to read as follows:

19

     16-7-36. Definitions.

 

1

     The following words and phrases used in §§ 16-7-35 to 16-7-47 and in §16-9-11 have the

2

following meanings:

3

     (1) “Adjusted equalized weighted assessed valuation” means the equalized weighted

4

assessed valuation for a community as determined by the division of property valuation within the

5

department of revenue in accordance with § 16-7-21; provided, however, that in the case of a

6

regional school district the commissioner of elementary and secondary education shall apportion

7

the adjusted equalized weighted assessed valuation of the member cities or towns among the

8

regional school district and the member cities or towns according to the proportion that the number

9

of pupils of the regional school district bears to the number of pupils of the member cities or towns.

10

     (2) “Approved project” means a project which has complied with the administrative

11

regulations governing §§ 16-7-35 through 16-7-47, and which has been authorized to receive state

12

school housing reimbursement by the commissioner of elementary and secondary education.

13

     (3) “Commissioning agent” means a person or entity who ensures that systems are

14

designed, installed, functionally tested, and capable of being operated and maintained to perform

15

in conformity with the design intent of a project.

16

     (4) “Community” means any city, town, or regional school district established pursuant to

17

law; provided, however, that the member towns of the Chariho regional high school district, created

18

by P.L. 1958, ch. 55, as amended, shall constitute separate and individual communities for the

19

purposes of distributing the foundation level school support for school housing for all grades

20

financed in whole or in part by the towns irrespective of any regionalization.

21

     (5) “Facilities condition index” means the cost to fully repair the building divided by the

22

cost to replace the building as determined by the school building authority.

23

     (6) “Functional utilization” means the ratio of the student population within a school

24

facility to the capacity of the school facility to adequately serve students as defined by the school

25

building authority.

26

     (7) “Maintenance expenditures” means amounts spent for repairs or replacements for the

27

purpose of keeping a school facility open and safe for use, including repairs, maintenance, and

28

replacements to a school facility’s heating, lighting, ventilation, security, and other fixtures to keep

29

the facility or fixtures in effective working condition. Maintenance shall not include contracted or

30

direct custodial or janitorial services, expenditures for the cleaning of a school facility or its

31

fixtures, the care and upkeep of grounds, recreational facilities, or parking lots, or the cleaning of

32

or repairs and replacements to movable furnishings or equipment.

33

     (8) “Owner’s program manager” means owner’s program manager as defined in § 37-2-7.

34

     (9) “Prime contractor” means the construction contractor who is responsible for the

 

LC001149/SUB A - Page 2 of 11

1

completion of a project.

2

     (10) “Reference year” means the year next prior to the school year immediately preceding

3

that in which aid is to be paid.

4

     (11) “Subject to inflation” means the base amount multiplied by the percentage of increase

5

in the Producer Price Index (PPI) Data for Nonresidential Building Construction (NAICS 236222)

6

as published by the United States Department of Labor, Bureau of Labor Statistics determined as

7

of September 30 of the prior calendar year.

8

     (12) “Zero energy capable” means the building:

9

     (i) Meets the latest Northeast Collaborative for High Performance Schools (NE-CHPS)

10

standard of a zero energy capable school building whereby the actual annual energy delivered other

11

than as described in subsection (12)(ii) of this section, must be less than or equal to the renewable

12

energy generated onsite; or

13

     (ii) The actual annual energy delivered must be less than or equal to the sum of:

14

     (A) The renewable energy generated onsite;

15

     (B) The renewable energy generated offsite through a power purchase agreement; and

16

     (C) The value of purchased NE-GIS certificates that meet the standard for a new renewable

17

energy resources as defined in § 39-26-2.

18

     16-7-39. Computation of school housing-aid ratio.

19

     For each community, the percent of state aid for school housing costs shall be computed in

20

the following manner:

21

     (1) The adjusted equalized weighted assessed valuation for the district is divided by the

22

resident average daily membership for the district (grades twelve (12) and below); (2) The adjusted

23

equalized weighted assessed valuation for the state is divided by the resident average daily

24

membership for the state (grades twelve (12) and below); (1) is then divided by (2) and the resultant

25

ratio is multiplied by a factor currently set at sixty-two percent (62%) which represents the

26

approximate average district share of school support; the resulting product is then subtracted from

27

one hundred percent (100%) to yield the housing aid share ratio, provided that in no case shall the

28

ratio be less than thirty percent (30%). Provided, that effective July 1, 2010, and annually at the

29

start of each fiscal year thereafter, the thirty percent (30%) floor on said housing-aid share shall be

30

increased by five percent (5%) increments each year until said floor on the housing-aid share ratio

31

reaches a minimum of not less than forty percent (40%). This provision shall apply only to school

32

housing projects completed after June 30, 2010, that received approval from the board of regents

33

prior to June 30, 2012. Provided further, for the fiscal year beginning July 1, 2012, and for

34

subsequent fiscal years, the minimum housing aid share shall be thirty-five percent (35%) for all

 

LC001149/SUB A - Page 3 of 11

1

projects receiving council on elementary and secondary education approval after June 30, 2012.

2

The resident average daily membership shall be determined in accordance with § 16-7-22(1).

3

     (2) No district shall receive a combined total of more than twenty (20) incentive percentage

4

points for projects that commence construction by December 30, 2023, and five (5) incentive points

5

for projects that commence construction thereafter; provided further, these caps shall be in addition

6

to amounts received under §§ 16-7-40(a)(1), and 16-7-40(a)(2), 16-7-40(j)(1) and 16-7-40(j)(2).

7

Furthermore, a district’s share shall not be decreased by more than half of its regular share

8

irrespective of the number of incentive points received nor shall a district’s state share increase by

9

more than half of its regular share, including amounts received under §§ 16-7-40(a)(1) and 16-7-

10

40(a)(2), irrespective of the number of incentive points received.

11

     16-7-40. Increased school housing ratio.

12

     (a)(1) In the case of regional school districts, the school housing aid ratio shall be increased

13

by two percent (2%) for each grade so consolidated.

14

     (2) Regional school districts undertaking renovation project(s) shall receive an increased

15

share ratio of four percent (4%) for those specific project(s) only, in addition to the combined share

16

ratio calculated in § 16-7-39 and this subsection.

17

     (b) In the case of projects undertaken by districts specifically for the purposes of school

18

safety and security, the school housing aid share ratio shall be increased by five percent (5%) for

19

these specific projects only, in the calculation of school housing aid. The increased share ratio shall

20

continue to be applied for as long as the project(s) receives state housing aid. In order to qualify for

21

the increased share ratio, seventy-five percent (75%) of the project costs must be specifically

22

directed to school safety and security measures. The council on elementary and secondary

23

education shall promulgate rules and regulations for the administration and operation of this

24

section.

25

     (c) For purposes of addressing health and safety deficiencies as defined by the school

26

building authority, including the remediation of hazardous materials, the school housing aid ratio

27

shall be increased by five percent (5%) so long as the construction of the project commences by

28

December 30, 2023, is completed by December 30, 2028, and a two hundred fifty million dollar

29

($250,000,000) general obligation bond is approved on the November 2018 ballot. In order to

30

qualify for the increased share ratio, twenty-five percent (25%) of the project costs or a minimum

31

of five hundred thousand dollars ($500,000) must be specifically directed to this purpose.

32

     (d) For purposes of educational enhancement, including projects devoted to the

33

enhancement of early childhood education and career and technical education, the school housing

34

aid ratio shall be increased by five percent (5%) so long as construction of the project commences

 

LC001149/SUB A - Page 4 of 11

1

by December 30, 2023, is completed by December 30, 2028, and a two hundred fifty million dollar

2

($250,000,000) general obligation bond is approved on the November 2018 ballot. In order to

3

qualify for the increased share ratio, twenty-five percent (25%) of the project costs or a minimum

4

of five hundred thousand dollars ($500,000) must be specifically directed to these purposes.

5

     (e) For replacement of a facility that has a facilities condition index of sixty-five percent

6

(65%) or higher, the school housing ratio shall be increased by five percent (5%) so long as

7

construction of the project commences by December 30, 2023, is completed by December 30, 2028,

8

does not receive a bonus pursuant to subsection (f) or subsection (g), and a two hundred fifty million

9

dollar ($250,000,000) general obligation bond is approved on the November 2018 ballot. In order

10

to qualify for the increased share ratio, twenty-five percent (25%) of the project costs or a minimum

11

of five hundred thousand dollars ($500,000) must be specifically directed to this purpose.

12

     (f) For any new construction or renovation that increases the functional utilization of any

13

facility from less than sixty percent (60%) to more than eighty percent (80%), including the

14

consolidation of school buildings within or across districts, the school housing aid ratio shall be

15

increased by five percent (5%) so long as construction of the project commences by December 30,

16

2023, is completed by December 30, 2028, and a two hundred fifty million dollar ($250,000,000)

17

general obligation bond is approved on the November 2018 ballot. In order to qualify for the

18

increased share ratio, twenty-five percent (25%) of the project costs or a minimum of five hundred

19

thousand dollars ($500,000) must be specifically directed to this purpose.

20

     (g) For any new construction or renovation that decreases the functional utilization of any

21

facility from more than one hundred twenty percent (120%) to between eighty-five percent (85%)

22

to one hundred five percent (105%), the school housing ratio shall be increased by five percent

23

(5%) so long as construction of the project commences by December 30, 2023, is completed by

24

December 30, 2028, and a two hundred fifty million dollar ($250,000,000) general obligation bond

25

is approved on the November 2018 ballot. In order to qualify for the increased share ratio, twenty-

26

five percent (25%) of the project costs or a minimum of five hundred thousand dollars ($500,000)

27

must be specifically directed to this purpose.

28

     (h) For consolidation of two (2) or more school buildings, within or across districts into

29

one school building, the school housing aid ratio shall be increased by five percent (5%) so long as

30

construction of the project commences by December 30, 2023, is completed by December 30, 2028,

31

a two hundred fifty million dollar ($250,000,000) general obligation bond is approved on the

32

November 2018 ballot, and does not receive a bonus pursuant to subsection (f) or subsection (g).

33

In order to qualify for the increased share ratio, twenty-five percent (25%) of the project costs or a

34

minimum of five hundred thousand dollars ($500,000) must be specifically directed to this purpose.

 

LC001149/SUB A - Page 5 of 11

1

     (i) Any regionalized and/or non-regionalized school district receiving an increased share

2

ratio for a project approved prior to July 1, 2018, shall continue to receive the increased share ratio

3

for as long as the project receives state housing aid.

4

     (j)(1) In the case of projects undertaken by districts specifically for the purposes of high-

5

performance school design, the school housing aid share ratio shall be increased by five percent

6

(5%) for these specific projects only, in the calculation of school housing aid. The increased share

7

ratio shall continue to be applied for as long as the project(s) receives state housing aid. In order to

8

qualify for the increased share ratio, seventy-five percent (75%) of the project costs must be

9

specifically directed to this purpose. The council on elementary and secondary education shall

10

promulgate rules and regulations for the administration and operation of this section.

11

     (2) For any new construction or renovation that includes energy efficiency and renewable

12

energy upgrades for the building to meet the standard of Zero Energy Capable school building

13

pursuant to § 16-7-36(12), the school housing aid ratio shall be increased by ten percent (10%).

14

     16-7-41.1. Eligibility for reimbursement.

15

     (a) School districts, not municipalities, may apply for and obtain approval for a project

16

under the necessity of school construction process set forth in the regulations of the council on

17

elementary and secondary education, provided, however, in the case of a municipality that issues

18

bonds through the Rhode Island health and educational building corporation to finance or refinance

19

school facilities for a school district that is not part of the municipality, the municipality may apply

20

for and obtain approval for a project. Such approval will remain valid until June 30 of the third

21

fiscal year following the fiscal year in which the council on elementary and secondary education’s

22

approval is granted. Only those projects undertaken at school facilities under the care and control

23

of the school committee and located on school property may qualify for reimbursement under §§

24

16-7-35 — 16-7-47. Facilities with combined school and municipal uses or facilities that are

25

operated jointly with any other profit or nonprofit agency do not qualify for reimbursement under

26

§§ 16-7-35 — 16-7-47. Projects completed by June 30 of a fiscal year are eligible for

27

reimbursement in the following fiscal year. A project for new school housing or additional housing

28

shall be deemed to be completed when the work has been officially accepted by the school

29

committee or when the housing is occupied for its intended use by the school committee, whichever

30

is earlier.

31

     (b) Notwithstanding the provisions of this section, the board of regents shall not grant final

32

approval for any project between June 30, 2011, and May 1, 2015, except for projects that are

33

necessitated by immediate health and safety reasons. In the event that a project is requested during

34

the moratorium because of immediate health and safety reasons, those proposals shall be reported

 

LC001149/SUB A - Page 6 of 11

1

to the chairs of the house and senate finance committees.

2

     (c) Any project approval granted prior to the adoption of the school construction

3

regulations in 2007, and which are currently inactive; and any project approval granted prior to the

4

adoption of the school construction regulations in 2007 which did not receive voter approval or

5

which has not been previously financed, are no longer eligible for reimbursement under this

6

chapter. The department of elementary and secondary education shall develop recommendations

7

for further cost containment strategies in the school housing aid program.

8

     (d) Beginning July 1, 2015, the council on elementary and secondary education shall

9

approve new necessity of school construction applications on an annual basis. The department of

10

elementary and secondary education shall develop an annual application timeline for local

11

education agencies seeking new necessity of school construction approvals.

12

     (e) Beginning July 1, 2019, no state funding shall be provided for projects in excess of ten

13

million dollars ($10,000,000) unless the prime contractor for the project has received

14

prequalification from the school building authority.

15

     (f) Beginning July 1, 2019, the necessity of school construction process set forth in the

16

regulations of the council on elementary and secondary education shall include a single statewide

17

process, developed with the consultation of the department of environmental management, that will

18

ensure community involvement throughout the investigation and remediation of contaminated

19

building sites for possible reuse as the location of a school. That process will fulfill all provisions

20

of § 23-19.14-5 related to the investigation of reuse of such sites for schools.

21

     (g) Beginning July 1, 2019, school housing projects exceeding one million five hundred

22

thousand dollars ($1,500,000) subject to inflation shall include an owner’s program manager and a

23

commissioning agent. The cost of the program manager and commissioning agent shall be

24

considered a project cost eligible for aid pursuant to §§ 16-7-41 and 16-105-5.

25

     (h) Temporary housing, or swing space, for students shall be a reimbursable expense so

26

long as a district can demonstrate that no other viable option to temporarily house students exists

27

and provided that use of the temporary space is time limited for a period not to exceed twenty-four

28

(24) months and tied to a specific construction project.

29

     (i) Environmental site remediation, as defined by the school building authority, shall be a

30

reimbursable expense up to one million dollars ($1,000,000) per project.

31

     (j) If, within thirty (30) years of construction, a newly constructed school is sold to a private

32

entity, the state shall receive a portion of the sale proceeds equal to that project’s housing aid

33

reimbursement rate at the time of project completion.

34

     (k) All projects must comply with § 37-13-6, ensuring that prevailing wage laws are being

 

LC001149/SUB A - Page 7 of 11

1

followed, and § 37-14.1-6, ensuring that minority business enterprises reach a minimum of ten

2

percent (10%) of the dollar value of the bid, and § 37-13-3.1, ensuring apprenticeship program

3

utilization.

4

     (l) Using reviewable criteria, all projects seeking school housing aid shall complete an

5

independent, objective, reasoned study on all projects over ten million dollars ($10,000,000) to

6

determine whether adoption of a project labor agreement on the proposed project or projects will

7

help achieve the goals of the state purchases act.

8

     SECTION 3. Section 16-105-3 of the General Laws in Chapter 16-105 entitled "School

9

Building Authority" is hereby amended to read as follows:

10

     16-105-3. Roles and responsibilities.

11

     The school building authority roles and responsibilities shall include:

12

     (1) Management of a system with the goal of ensuring equitable and adequate school

13

housing for all public school children in the state;

14

     (2) Prevention of the cost of school housing from interfering with the effective operation

15

of the schools;

16

     (3) Management of school housing aid in accordance with statute;

17

     (4) Reviewing and making recommendations to the council on elementary and secondary

18

education on necessity of school construction applications for state school housing aid and the

19

school building authority capital fund, based on the recommendations of the school building

20

authority advisory board;

21

     (5) Promulgating, managing, and maintaining school construction regulations, standards,

22

and guidelines applicable to the school housing program, based on the recommendations of the

23

school building authority advisory board, created in § 16-105-8. Said regulations shall require

24

conformance with the minority business enterprise requirements set forth in § 37-14.1-6 and with

25

the latest Northeast Collaborative for High Performance Schools (NE-CHPS) standards or

26

equivalent, contingent on approval from the council on elementary and secondary education;

27

     (6) Developing a prequalification and review process for prime contractors, architects, and

28

engineers seeking to bid on projects in excess of ten million dollars ($10,000,000) in total costs

29

subject to inflation. Notwithstanding any general laws to the contrary, a prequalification shall be

30

valid for a maximum of two (2) years from the date of issuance. Factors to be considered by the

31

school building authority in granting a prequalification to prime contractors shall include, but not

32

be limited to, the contractor’s history of completing complex projects on time and on budget, track

33

record of compliance with applicable environmental and safety regulations, evidence that

34

completed prior projects prioritized the facility’s future maintainability, and compliance with

 

LC001149/SUB A - Page 8 of 11

1

applicable requirements for the use of women and minority owned subcontractors;

2

     (i) At least annually, a list of prequalified contractors, architects, and engineers shall be

3

publicly posted with all other program information;

4

     (7) Providing technical assistance and guidance to school districts on the necessity of

5

school construction application process;

6

     (8) Providing technical advice and assistance, training, and education to cities, towns,

7

and/or local education agencies and to general contractors, subcontractors, construction or project

8

managers, designers and others in planning, maintenance, and establishment of school facility

9

space;

10

     (9) Developing a project priority system, based on the recommendations of the school

11

building authority advisory board, in accordance with school construction regulations for the school

12

building authority capital fund, subject to review and, if necessary, to be revised on intervals not to

13

exceed five (5) years. Project priorities shall include, but not be limited to, the following order of

14

priorities:

15

     (i) Projects to replace or renovate a building that is structurally unsound or otherwise in a

16

condition seriously jeopardizing the health and safety of school children where no alternative exists;

17

     (ii) Projects needed to prevent loss of accreditation;

18

     (iii) Projects needed for the replacement, renovation, or modernization of the HVAC

19

system in any schoolhouse to increase energy conservation and decrease energy-related costs in

20

said schoolhouse;

21

     (iv) Projects needed to replace or add to obsolete buildings in order to provide for a full

22

range of programs consistent with state and approved local requirements; and

23

     (v) Projects needed to comply with mandatory, instructional programs;

24

     (10) Maintaining a current list of requested school projects and the priority given them;

25

     (11) Collecting and maintaining readily available data on all the public school facilities in

26

the state;

27

     (12) Collecting, maintaining, and making publicly available quarterly progress reports of

28

all ongoing school construction projects that shall include, at a minimum, the costs of the project

29

and the time schedule of the project;

30

     (13) Recommending policies and procedures designed to reduce borrowing for school

31

construction programs at both state and local levels;

32

     (14) At least every five (5) years, conducting a needs survey to ascertain the capital

33

construction, reconstruction, maintenance, and other capital needs for schools in each district of the

34

state, including public charter schools. Beginning in 2023, this needs survey shall include progress

 

LC001149/SUB A - Page 9 of 11

1

towards and recommendations for energy efficiency and renewable energy upgrades to bring all

2

state school buildings to the definition of a zero energy capable school building pursuant to § 16-

3

7-36;

4

     (15) Developing a formal enrollment projection model or using projection models already

5

available;

6

     (16) Encouraging local education agencies to investigate opportunities for the maximum

7

utilization of space in and around the district;

8

     (17) Collecting and maintaining a clearinghouse of prototypical school plans that may be

9

consulted by eligible applicants;

10

     (18) Retaining the services of consultants, as necessary, to effectuate the roles and

11

responsibilities listed within this section;

12

     (19) Hiring an appropriate staff member who shall create and implement a plan to bring all

13

Rhode Island school buildings in compliance with the standard of a zero energy capable school

14

building pursuant to § 16-7-36 and who shall provide technical advice and assistance, training, and

15

education to cities, towns, and/or local education agencies, and to general contractors,

16

subcontractors, construction or project managers, designers and others on the latest NE-CHPS

17

standards;

18

     (19)(20) No district shall receive a combined total of more than twenty (20) incentive

19

percentage points for projects that commence construction by December 30, 2023, and five (5)

20

incentive points for projects that commence construction thereafter; provided further, these caps

21

shall be in addition to amounts received under §§ 16-7-40(a)(1), and 16-7-40(a)(2), 16-7-40(j)(1),

22

and 16-7-40(j)(2). Furthermore, a district’s share shall not be decreased by more than half of its

23

regular share irrespective of the number of incentive points received, nor shall a district’s state

24

share increase by more than half of its regular share, including amounts received under §§ 16-7-

25

40(a)(1) and 16-7-40(a)(2), irrespective of the number of incentive points received.

26

Notwithstanding any provision of the general laws to the contrary, the reimbursement or aid

27

received under this chapter or chapter 38.2 of title 45 shall not exceed one hundred percent (100%)

28

of the sum of the total project costs plus interest costs. If a two hundred and fifty million dollar

29

($250,000,000) general obligation bond is approved on the November 2018 ballot, projects

30

approved between May 1, 2015, and January 1, 2018, are eligible to receive incentive points (above

31

and beyond what the project was awarded at the time of approval) pursuant to § 16-7-39 and § 16-

32

7-40. Provided, however, any project approved during this time period with a project cost in excess

33

of one million five hundred thousand dollars ($1,500,000), which does not include an owner’s

34

program manager and a commissioning agent, shall only be eligible to receive five (5) incentive

 

LC001149/SUB A - Page 10 of 11

1

points. Incentive points awarded pursuant to the provisions of this subsection shall only be applied

2

to reimbursements occurring on or after July 1, 2018. Any project approved between May 1, 2015,

3

and January 1, 2018, that is withdrawn and/or resubmitted for approval shall not be eligible for any

4

incentive points.

5

     SECTION 4. This act shall take effect upon passage.

========

LC001149/SUB A

========

 

LC001149/SUB A - Page 11 of 11

EXPLANATION

BY THE LEGISLATIVE COUNCIL

OF

A N   A C T

RELATING TO EDUCATION -- SCHOOL FUNDS AND PROPERTY

***

1

     This act would provide that not later than June 30, 2024, the department of education would

2

develop and adopt, in consultation with the office of energy resources, regulations requiring all

3

school buildings to meet the standard of zero energy capable, as defined in § 16-7-36, by December

4

31, 2035.

5

     This act would take effect upon passage.

========

LC001149/SUB A

========

 

LC001149/SUB A - Page 12 of 11